Kl Construction Group
- Based in
- Daly City
- On San Francisco permits
- May 2013 to Sep 2026
- Last 24 months
- 9 permits filed
120 permits since 2000: 101 completed, 2 in progress, 9 never finaled, 8 expired or cancelled.
Of the 9 never-finaled permits, 7 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
3 roof deck permits: 3 completed. Typically 52 days from filing to permit and 403 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 5, 2021 | Completed final sign-off Nov 2021 | 312 Wayland St | 2nd fl: remodel bathroom and convert powder room to full bath, 3rd fl: remodel bathroom and powder room, new roof at rear, replace railings at front roof deck and sliding doorDetails
2nd fl: remodel bathroom and convert powder room to full bath, 3rd fl: remodel bathroom and powder room, new roof at rear, replace railings at front roof deck and sliding door | $48,000 |
| Mar 16, 2016 | Completed final sign-off May 2017 | 1775 Green St | revision to 2015 1016 9915 to include work at 3rd floor unit kitchen, remodel bathrooms, add powder room. remove walls at kitchen, remodel kitchen. provide new railing and replace (e) decking materials at (e) roof deck. no change to (e) structure.Details
revision to 2015 1016 9915 to include work at 3rd floor unit kitchen, remodel bathrooms, add powder room. remove walls at kitchen, remodel kitchen. provide new railing and replace (e) decking materials at (e) roof deck. no change to (e) structure. | $50,000 |
| May 22, 2013 | Completed final sign-off May 2015 | 2728 Irving St | fill-in addition @ rear deck, roof deck over fill-in. fill-in corner @ kitchen, add half bath, remodel kitchn, new doors & windows not visible from street, general mep upgrades, general structural reinformcements & footings as required.Details
fill-in addition @ rear deck, roof deck over fill-in. fill-in corner @ kitchen, add half bath, remodel kitchn, new doors & windows not visible from street, general mep upgrades, general structural reinformcements & footings as required. | $40,000 |