Kl Construction Group
- Based in
- Daly City
- On San Francisco permits
- May 2013 to Sep 2026
- Last 24 months
- 9 permits filed
120 permits since 2000: 101 completed, 2 in progress, 9 never finaled, 8 expired or cancelled.
Of the 9 never-finaled permits, 7 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 8 completed. Typically 10 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2022 | Completed final sign-off Nov 2022 | 761 39th Av | 1/f: add 2 bedrooms, 2 full bath and media. 2/f: remodel kitchen, bathroom and bedrooms, add 1 full bath. add new deck.Details
1/f: add 2 bedrooms, 2 full bath and media. 2/f: remodel kitchen, bathroom and bedrooms, add 1 full bath. add new deck. | $120,000 |
| Jun 23, 2021 | Completed final sign-off Nov 2021 | 312 Wayland St | revision to pa 2021-0405-7924 - 2nd and 3rd fl - reconfigure bathroom layout per plans. remove rear deck from scope of workDetails
revision to pa 2021-0405-7924 - 2nd and 3rd fl - reconfigure bathroom layout per plans. remove rear deck from scope of work | |
| Apr 1, 2021 | Completed final sign-off Nov 2021 | 33 Lee Av | new deck at rear and 1 sliding door. remove storage at rear.Details
new deck at rear and 1 sliding door. remove storage at rear. | $3,000 |
| Mar 16, 2020 | Completed final sign-off May 2020 | 638 26th Av | revision under pa #201907297167, 1. re-arrange plumbing fixtures for one bathrm, at 2nd fl. 2. arrange plumbing fixture for two bathrms at ground fl. 3. construct staircase to (e) deck at rear of building.Details
revision under pa #201907297167, 1. re-arrange plumbing fixtures for one bathrm, at 2nd fl. 2. arrange plumbing fixture for two bathrms at ground fl. 3. construct staircase to (e) deck at rear of building. | $2,500 |
| Jul 14, 2017 | Completed final sign-off Sep 2017 | 491 Lakeshore Dr | replace some dryrot wood for the front deck. less than 40%.Details
replace some dryrot wood for the front deck. less than 40%. | $1,500 |
| May 5, 2017 | Completed final sign-off Jul 2017 | 3717 Webster St | revision to 201704133880 replace deck joistsDetails
revision to 201704133880 replace deck joists | $2,000 |
| Apr 13, 2017 | Completed final sign-off Jul 2017 | 3717 Webster St | remodel bathroom, repair dry rot wood for the deck at backside (less than 50%) replace deckingDetails
remodel bathroom, repair dry rot wood for the deck at backside (less than 50%) replace decking | $9,000 |
| May 22, 2013 | Completed final sign-off May 2015 | 2728 Irving St | fill-in addition @ rear deck, roof deck over fill-in. fill-in corner @ kitchen, add half bath, remodel kitchn, new doors & windows not visible from street, general mep upgrades, general structural reinformcements & footings as required.Details
fill-in addition @ rear deck, roof deck over fill-in. fill-in corner @ kitchen, add half bath, remodel kitchn, new doors & windows not visible from street, general mep upgrades, general structural reinformcements & footings as required. | $40,000 |