Permit GraphShortlistSan Francisco building permits since 2000

Kl Construction Group

Contractor license
982127
State license record
Based in
Daly City
On San Francisco permits
May 2013 to Sep 2026
Last 24 months
6 permits filed

120 permits since 2000: 101 completed, 2 in progress, 9 never finaled, 8 expired or cancelled.

Of the 9 never-finaled permits, 7 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Bathroom remodel permits

AllRoof deck 3Deck 8Stairs 10Kitchen remodel 45Bathroom remodel 53

53 bathroom remodel permits: 43 completed, 7 never finaled, 3 expired or cancelled. Typically 7 days from filing to permit and 249 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 19, 2025Completed
final sign-off Oct 2025
1563 43rd Avrevision to permit 202410152946. relocation of refrigerator and oven. closed 2 windows on 2/f bathroom in rear. remove partition wall in laundry room wall. no change in plumbing fixtures.
Details
Permit
202508193361
Permit issued
Aug 19, 2025
Final sign-off
Oct 3, 2025

revision to permit 202410152946. relocation of refrigerator and oven. closed 2 windows on 2/f bathroom in rear. remove partition wall in laundry room wall. no change in plumbing fixtures.

Open the permit page

$1,000
Jun 6, 2025Completed
final sign-off Feb 2026
1218 26th Avunits #102, #104, #202 - remodel (3) kitchens and (3) bathrooms in kind.
Details
Permit
202506068128
Permit issued
Jun 6, 2025
Final sign-off
Feb 23, 2026

units #102, #104, #202 - remodel (3) kitchens and (3) bathrooms in kind.

Open the permit page

$45,000
Oct 15, 2024Completed
final sign-off Oct 2025
1563 43rd Avremodel kitchen, bathroom. add one bathroom and 1/2 bathroom on 2nd flr. 1st add 2 full bathroom, 2 bedroom, 2 family room. replacing all windows. 2nd flr reconfigure stairs.
Details
Permit
202410152946
Permit issued
Oct 29, 2024
Final sign-off
Oct 7, 2025

remodel kitchen, bathroom. add one bathroom and 1/2 bathroom on 2nd flr. 1st add 2 full bathroom, 2 bedroom, 2 family room. replacing all windows. 2nd flr reconfigure stairs.

Open the permit page

$200,000
Oct 9, 2024Completed
final sign-off Oct 2025
1563 43rd Avin-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
Details
Permit
202410092685
Permit issued
Oct 9, 2024
Final sign-off
Oct 3, 2025

in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).

Open the permit page

$25,000
Jun 30, 2022Completed
final sign-off Oct 2025
123 Forest View Drinterior remodel of (e) un-finished 1st story, including new full bath. associated mechanical, plumbing, and electrical improvements. no change to existing footprint or street facing facade.
Details
Permit
202206307440
Permit issued
Sep 26, 2022
Final sign-off
Oct 1, 2025

interior remodel of (e) un-finished 1st story, including new full bath. associated mechanical, plumbing, and electrical improvements. no change to existing footprint or street facing facade.

Open the permit page

$80,000
Jan 20, 2022Completed
final sign-off Nov 2022
761 39th Av1/f: add 2 bedrooms, 2 full bath and media. 2/f: remodel kitchen, bathroom and bedrooms, add 1 full bath. add new deck.
Details
Permit
202201206338
Permit issued
Feb 2, 2022
Final sign-off
Nov 3, 2022

1/f: add 2 bedrooms, 2 full bath and media. 2/f: remodel kitchen, bathroom and bedrooms, add 1 full bath. add new deck.

Open the permit page

$120,000
Oct 26, 2021Completed
final sign-off Dec 2022
446 Diamond Stconvert ground floor living and bedroom area to accessory dwelling unit - 535 sq ft two bedrooms, one bath, provide (n) kitchen, and widen stairs access route.
Details
Permit
202110261155
Permit issued
May 13, 2022
Final sign-off
Dec 19, 2022

convert ground floor living and bedroom area to accessory dwelling unit - 535 sq ft two bedrooms, one bath, provide (n) kitchen, and widen stairs access route.

Open the permit page

$20,000
Oct 22, 2021Completed
final sign-off Aug 2023
3025 21st Avground fl - add 1 bedrm, 1 family rm and 1 full bath & wet bar; 2nd fl - relocate kitchen, add 1 half bathrm, 1 laundry; 3rd fl - relocate 2 bathrooms; relocate stairs, replace front windows w/wood
Details
Permit
202110221022
Permit issued
Dec 9, 2021
Final sign-off
Aug 8, 2023

ground fl - add 1 bedrm, 1 family rm and 1 full bath & wet bar; 2nd fl - relocate kitchen, add 1 half bathrm, 1 laundry; 3rd fl - relocate 2 bathrooms; relocate stairs, replace front windows w/wood

Open the permit page

$200,000
Jun 23, 2021Completed
final sign-off Nov 2021
312 Wayland Strevision to pa 2021-0405-7924 - 2nd and 3rd fl - reconfigure bathroom layout per plans. remove rear deck from scope of work
Details
Permit
202106233057
Permit issued
Jun 23, 2021
Final sign-off
Nov 9, 2021

revision to pa 2021-0405-7924 - 2nd and 3rd fl - reconfigure bathroom layout per plans. remove rear deck from scope of work

Open the permit page

Apr 5, 2021Completed
final sign-off Nov 2021
312 Wayland St2nd fl: remodel bathroom and convert powder room to full bath, 3rd fl: remodel bathroom and powder room, new roof at rear, replace railings at front roof deck and sliding door
Details
Permit
202104057924
Permit issued
May 27, 2021
Final sign-off
Nov 9, 2021

2nd fl: remodel bathroom and convert powder room to full bath, 3rd fl: remodel bathroom and powder room, new roof at rear, replace railings at front roof deck and sliding door

Open the permit page

$48,000
Mar 2, 2021Completed
final sign-off Apr 2021
1767 40th Avremodel kitchen (120sf) and 1 bath (50 sf) in kind. no change in walls and layout.
Details
Permit
202103025658
Permit issued
Mar 2, 2021
Final sign-off
Apr 22, 2021

remodel kitchen (120sf) and 1 bath (50 sf) in kind. no change in walls and layout.

Open the permit page

$18,000
Feb 26, 2021Never finaled
issued Feb 2021, no final
2315 Divisadero Stremodel one full bathroom, one half bath (no removing walls)
Details
Permit
202102265485
Permit issued
Feb 26, 2021

remodel one full bathroom, one half bath (no removing walls)

Open the permit page

$12,000
Aug 25, 2020Completed
final sign-off Aug 2022
134 Parker Avconstruct 2 bedroom, 2 full bath,1 powder room & family room at ground floor. 2nd floor: remodel (e) kitchen, bathroom. construct 1 powder room. attic space: construct 2 full bathroom & convert (e) storage room to bedroom. construct 2 dormer (8'x8').
Details
Permit
202008252591
Permit issued
Sep 2, 2021
Final sign-off
Aug 23, 2022

construct 2 bedroom, 2 full bath,1 powder room & family room at ground floor. 2nd floor: remodel (e) kitchen, bathroom. construct 1 powder room. attic space: construct 2 full bathroom & convert (e) storage room to bedroom. construct 2 dormer (8'x8').

Open the permit page

$180,000
Jun 12, 2020Never finaled
issued Jun 2020, no final
3144 Clay Stremodel existing bathroom approx 5'x9'. remove tiling and cabinets. remodel existing kitchen with new shelves and new tiles. all remodel in-kind.
Details
Permit
202006128505
Permit issued
Jun 18, 2020

remodel existing bathroom approx 5'x9'. remove tiling and cabinets. remodel existing kitchen with new shelves and new tiles. all remodel in-kind.

Open the permit page

$10,000
Jul 29, 2019Completed
final sign-off Apr 2020
638 26th Avrelocate kitchen, remodel (e) bath, convert (e) bedrm into bath rm, add 1 toilet rm at 2nd flr. in-fill under (e) bedrm, construct 2 bedrm, 2 bathrm at grnd flr. rebuilt conc retaining wall (under 4'-0" ht). replace all (e) footing w/new
Details
Permit
201907297167
Permit issued
Aug 12, 2019
Final sign-off
Apr 15, 2020

relocate kitchen, remodel (e) bath, convert (e) bedrm into bath rm, add 1 toilet rm at 2nd flr. in-fill under (e) bedrm, construct 2 bedrm, 2 bathrm at grnd flr. rebuilt conc retaining wall (under 4'-0" ht). replace all (e) footing w/new

Open the permit page

$128,000
Mar 18, 2019Completed
final sign-off Aug 2019
1991 21st Avconstruct two bedroom, two full bathrooms, media room at ground fl. relocate kitchen, remodel (e) bath, add one new bathroom & convert (e) kitchen to living room at 2nd fl. upgrade (e) ceiling framing at 2nd fl.
Details
Permit
201903185462
Permit issued
Mar 28, 2019
Final sign-off
Aug 22, 2019

construct two bedroom, two full bathrooms, media room at ground fl. relocate kitchen, remodel (e) bath, add one new bathroom & convert (e) kitchen to living room at 2nd fl. upgrade (e) ceiling framing at 2nd fl.

Open the permit page

$92,000
Oct 18, 2018Completed
final sign-off May 2019
849 26th Av1st floor: add 2 bedrooms, 2.5 baths, media room and laundry room. 2nd floor: remodel kitchen and bath. add 1.5 bathroom. reconfigure interior stairs.
Details
Permit
201810183602
Permit issued
Oct 25, 2018
Final sign-off
May 14, 2019

1st floor: add 2 bedrooms, 2.5 baths, media room and laundry room. 2nd floor: remodel kitchen and bath. add 1.5 bathroom. reconfigure interior stairs.

Open the permit page

$95,000
Apr 30, 2018Never finaled
filed Apr 2018, never issued
676 10th Avaddition of dwelling unit per ord# 162-16. construct two bedrooms, one bathroom & one kitchen. all work @ ground fl.
Details
Permit
201804307714

addition of dwelling unit per ord# 162-16. construct two bedrooms, one bathroom & one kitchen. all work @ ground fl.

Open the permit page

$54,000
Apr 3, 2018Never finaled
issued Apr 2018, no final
674 10th Avrelocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 2nd fl.
Details
Permit
201804035323
Permit issued
Apr 20, 2018

relocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 2nd fl.

Open the permit page

$58,000
Apr 3, 2018Never finaled
issued Apr 2018, no final
676 10th Avrelocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 3rd fl.
Details
Permit
201804035320
Permit issued
Apr 20, 2018

relocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 3rd fl.

Open the permit page

$58,000
Oct 4, 2017Completed
final sign-off May 2019
754 20th Avwork on both units- remodel kitchens & bathrooms, add 1 full bathroom to each unit. relocate laundry
Details
Permit
201710040356
Permit issued
Oct 17, 2017
Final sign-off
May 2, 2019

work on both units- remodel kitchens & bathrooms, add 1 full bathroom to each unit. relocate laundry

Open the permit page

$60,000
Oct 3, 2017Completed
final sign-off May 2019
754 20th Avat 1st fl, legalize non-permit rooms to have a bedroom, living/dining area, kitchen and full bathroom uner legalization ordinance 43-14
Details
Permit
201710030294
Permit issued
Jun 6, 2018
Final sign-off
May 2, 2019

at 1st fl, legalize non-permit rooms to have a bedroom, living/dining area, kitchen and full bathroom uner legalization ordinance 43-14

Open the permit page

$58,000
Aug 30, 2017Completed
final sign-off May 2018
2754 38th Av1/f- add a family room, a bedroom, a full bath. 2/f- remodel existing kitchen, 2 bathrooms.
Details
Permit
201708306428
Permit issued
Sep 6, 2017
Final sign-off
May 1, 2018

1/f- add a family room, a bedroom, a full bath. 2/f- remodel existing kitchen, 2 bathrooms.

Open the permit page

$60,000
Jul 26, 2017Completed
final sign-off May 2018
3535 Anza Stto comply with complaint 201770341 & 201771581, unit 3535 - relocate to 1st floor, add side entry door & window. unit 3537 - reconfigure interior layout, add 1 full bath, remodel 2 bathrooms & kitchen per plan. replace 7 windows at front. all windows to be wood
Details
Permit
201707263024
Permit issued
Aug 4, 2017
Final sign-off
May 25, 2018

to comply with complaint 201770341 & 201771581, unit 3535 - relocate to 1st floor, add side entry door & window. unit 3537 - reconfigure interior layout, add 1 full bath, remodel 2 bathrooms & kitchen per plan. replace 7 windows at front. all windows to be wood

Open the permit page

$150,000
Jun 5, 2017Completed
final sign-off Feb 2018
42 Lakeview Avremove (e) sheetrock, replace new 5/8" type 'x' gyp. bd. with r-19 insulation, construct 2 new bathroom, re-wire new electrical & lighting, all work at 2/f
Details
Permit
201706058369
Permit issued
Jun 8, 2017
Final sign-off
Feb 12, 2018

remove (e) sheetrock, replace new 5/8" type 'x' gyp. bd. with r-19 insulation, construct 2 new bathroom, re-wire new electrical & lighting, all work at 2/f

Open the permit page

$58,000
May 1, 2017Completed
final sign-off Apr 2019
124 Moffitt Stextend (e) bedroom & construct new 1 full bathroom. all work at ground floor
Details
Permit
201705015307
Permit issued
Sep 5, 2018
Final sign-off
Apr 8, 2019

extend (e) bedroom & construct new 1 full bathroom. all work at ground floor

Open the permit page

$28,000
Apr 13, 2017Completed
final sign-off Jul 2017
3717 Webster Stremodel bathroom, repair dry rot wood for the deck at backside (less than 50%) replace decking
Details
Permit
201704133880
Permit issued
Apr 13, 2017
Final sign-off
Jul 13, 2017

remodel bathroom, repair dry rot wood for the deck at backside (less than 50%) replace decking

Open the permit page

$9,000
Mar 3, 2017Completed
final sign-off Feb 2018
42 Lakeview Avremodel upstairs kitchen and bathroom. no strucutral work. h.e. lighting. no change in openings or wall layout.
Details
Permit
201703030628
Permit issued
Mar 3, 2017
Final sign-off
Feb 12, 2018

remodel upstairs kitchen and bathroom. no strucutral work. h.e. lighting. no change in openings or wall layout.

Open the permit page

$18,000
Sep 30, 2016Completed
final sign-off Jan 2017
601 Van Ness Avremodel one bathroom no structural work
Details
Permit
201609309278
Permit issued
Sep 30, 2016
Final sign-off
Jan 5, 2017

remodel one bathroom no structural work

Open the permit page

$800
Sep 6, 2016Completed
final sign-off Feb 2017
1884 Bush Strelocate (e) kitchen,bathrm. construct one new bath rm & convert (e)kitchen, bathroom space into new bedrm. all work at ground floor. not visable from street, no proposed change unit count.
Details
Permit
201609066817
Permit issued
Sep 16, 2016
Final sign-off
Feb 27, 2017

relocate (e) kitchen,bathrm. construct one new bath rm & convert (e)kitchen, bathroom space into new bedrm. all work at ground floor. not visable from street, no proposed change unit count.

Open the permit page

$20,000
Jul 11, 2016Completed
final sign-off Jul 2016
471 23rd Avto comply with physical inspection report # cc-7782 slb section 1031,109,210 & 3403 ,replace kitkchen cabinets (old to new) replace plumbing fixtures for bathroom, in unit # 1
Details
Permit
201607112028
Permit issued
Jul 11, 2016
Final sign-off
Jul 15, 2016

to comply with physical inspection report # cc-7782 slb section 1031,109,210 & 3403 ,replace kitkchen cabinets (old to new) replace plumbing fixtures for bathroom, in unit # 1

Open the permit page

$30,000
Mar 16, 2016Completed
final sign-off May 2017
1775 Green Strevision to 2015 1016 9915 to include work at 3rd floor unit kitchen, remodel bathrooms, add powder room. remove walls at kitchen, remodel kitchen. provide new railing and replace (e) decking materials at (e) roof deck. no change to (e) structure.
Details
Permit
201603162173
Permit issued
Apr 14, 2016
Final sign-off
May 22, 2017

revision to 2015 1016 9915 to include work at 3rd floor unit kitchen, remodel bathrooms, add powder room. remove walls at kitchen, remodel kitchen. provide new railing and replace (e) decking materials at (e) roof deck. no change to (e) structure.

Open the permit page

$50,000
Mar 14, 2016Never finaled
issued Mar 2016, no final
1177 California Stremodel (2) bathrooms, (1) laundry room; replace countertop.
Details
Permit
201603141986
Permit issued
Mar 14, 2016

remodel (2) bathrooms, (1) laundry room; replace countertop.

Open the permit page

$18,000
Nov 25, 2015Completed
final sign-off Mar 2016
2 Fallon Plkitchen & bathroom renovation, replace water heater, add ventless washer/dryer, replace shut off valves, add flood stops to water heater, toilet, dishwasher & washer/dryer.
Details
Permit
201511253593
Permit issued
Nov 25, 2015
Final sign-off
Mar 15, 2016

kitchen & bathroom renovation, replace water heater, add ventless washer/dryer, replace shut off valves, add flood stops to water heater, toilet, dishwasher & washer/dryer.

Open the permit page

$10,000
Oct 30, 2015Completed
final sign-off Sep 2016
27 Roanoke St1st floor: add one bedroom, one full bath, family room, storage & infill open space under extg 2nd floor habitable area. 2nd floor: remodel kitchen, bedrooms, bathroom. living room and add one full bath room per plan.
Details
Permit
201510301304
Permit issued
Nov 6, 2015
Final sign-off
Sep 21, 2016

1st floor: add one bedroom, one full bath, family room, storage & infill open space under extg 2nd floor habitable area. 2nd floor: remodel kitchen, bedrooms, bathroom. living room and add one full bath room per plan.

Open the permit page

$86,300
Sep 8, 2015Completed
final sign-off Feb 2017
1773 Green Stremodel (e) kitchen & 2 bathrooms.
Details
Permit
201509086319
Permit issued
Sep 8, 2015
Final sign-off
Feb 22, 2017

remodel (e) kitchen & 2 bathrooms.

Open the permit page

$25,000
Aug 3, 2015Never finaled
issued Aug 2015, no final
1727 34th Avremodel kitchen and two bathrooms. no structural work
Details
Permit
201508033185
Permit issued
Aug 3, 2015

remodel kitchen and two bathrooms. no structural work

Open the permit page

$28,000
Jun 11, 2015Expired or cancelled
cancelled Aug 2016
99 Merced Avremodel one bathroom at second floor (no structural work). all work in-kind.
Details
Permit
201506118720
Permit issued
Jun 11, 2015

remodel one bathroom at second floor (no structural work). all work in-kind.

Open the permit page

$9,000
Jun 1, 2015Completed
final sign-off Apr 2016
44 Parker Avremodel kitchen and bath. open up non bearing walls. add plywood to existing walls. uopen up 4 small closet doors along hallway bearing wall add 4x6 headers, no major structural reframing. double joists in garage under plywood. gen mep upgrades
Details
Permit
201506017586
Permit issued
Jun 11, 2015
Final sign-off
Apr 4, 2016

remodel kitchen and bath. open up non bearing walls. add plywood to existing walls. uopen up 4 small closet doors along hallway bearing wall add 4x6 headers, no major structural reframing. double joists in garage under plywood. gen mep upgrades

Open the permit page

$57,314
Jun 1, 2015Expired or cancelled
cancelled Jan 2017
46 Cook Stremodel kitchen, new bath, add interior stairs to basement and attic for coenvenience, window and door changes not visible from street. no change in basement
Details
Permit
201506017585
Permit issued
Jun 11, 2015

remodel kitchen, new bath, add interior stairs to basement and attic for coenvenience, window and door changes not visible from street. no change in basement

Open the permit page

$35,717
Apr 27, 2015Completed
final sign-off Aug 2015
446 Diamond Strevision to app#201304225065 to show as built for final. change family, guest, and bath on grnd fl. to family, 2 bedrooms and 1/2 bath. on 2nd: wall between breakfast and hall to remain. add ul-listed fireplace to living room.
Details
Permit
201504274639
Permit issued
May 5, 2015
Final sign-off
Aug 7, 2015

revision to app#201304225065 to show as built for final. change family, guest, and bath on grnd fl. to family, 2 bedrooms and 1/2 bath. on 2nd: wall between breakfast and hall to remain. add ul-listed fireplace to living room.

Open the permit page

Apr 20, 2015Completed
final sign-off Jul 2015
1047 Filbert Stremodel 2 bathrooms and one laundry room. no structure work.
Details
Permit
201504204036
Permit issued
Apr 20, 2015
Final sign-off
Jul 20, 2015

remodel 2 bathrooms and one laundry room. no structure work.

Open the permit page

$20,000
Feb 10, 2015Completed
final sign-off Feb 2017
1774 09th Avwork refer to the physical inspection report #cc-7823, kitchen & bath remodel at unit#2.
Details
Permit
201502107952
Permit issued
Feb 10, 2015
Final sign-off
Feb 24, 2017

work refer to the physical inspection report #cc-7823, kitchen & bath remodel at unit#2.

Open the permit page

$2,000
Jan 20, 2015Completed
final sign-off Jun 2015
1448 12th Avremodel existing kitchen. widen openings to dining and breakfast rooms. add plywood to 2 walls. reinforce breakfast and bath floor joists to level floors. add a skylight. add windows not visible from sreet. general mep upgrades.
Details
Permit
201501206135
Permit issued
Jan 26, 2015
Final sign-off
Jun 17, 2015

remodel existing kitchen. widen openings to dining and breakfast rooms. add plywood to 2 walls. reinforce breakfast and bath floor joists to level floors. add a skylight. add windows not visible from sreet. general mep upgrades.

Open the permit page

$25,000
Dec 18, 2014Completed
final sign-off Mar 2015
851 Page Stremodel bathroom, replace countertop, cabinets, sink. replace one outside door and window (at rear side) at basement level due to the foundation work.
Details
Permit
201412184023
Permit issued
Dec 18, 2014
Final sign-off
Mar 16, 2015

remodel bathroom, replace countertop, cabinets, sink. replace one outside door and window (at rear side) at basement level due to the foundation work.

Open the permit page

$9,000
Sep 12, 2014Completed
final sign-off Mar 2015
419 09th Av#2- add a full bath. #1 & #2- remodel (e) baths and kitchen. repair (e) rear stair and siding, replace all exterior windows with new wood on front and side facing street. n/a ordinance #155-13
Details
Permit
201409126247
Permit issued
Sep 15, 2014
Final sign-off
Mar 24, 2015

#2- add a full bath. #1 & #2- remodel (e) baths and kitchen. repair (e) rear stair and siding, replace all exterior windows with new wood on front and side facing street. n/a ordinance #155-13

Open the permit page

$40,000
Aug 8, 2014Completed
final sign-off Sep 2014
2431 27th Avremodel 1 bathroom at 3/f, no walls to be removed
Details
Permit
201408083390
Permit issued
Aug 8, 2014
Final sign-off
Sep 26, 2014

remodel 1 bathroom at 3/f, no walls to be removed

Open the permit page

$8,000
Jul 21, 2014Completed
final sign-off Mar 2017
232 Guerrero Staddition to rear of bldg on 3rd floor including 1 bath, 1 bedroom, 1 personal office and exercise room
Details
Permit
201407211683
Permit issued
Mar 30, 2015
Final sign-off
Mar 14, 2017

addition to rear of bldg on 3rd floor including 1 bath, 1 bedroom, 1 personal office and exercise room

Open the permit page

$98,000
Jul 21, 2014Completed
final sign-off Apr 2015
154 Ulloa Strevision appl 2014.0602.7286. enlarge bathroom per plan, relocate furnace, water heater, washer and dryer. install structural beam per plan.
Details
Permit
201407211734
Permit issued
Jul 22, 2014
Final sign-off
Apr 6, 2015

revision appl 2014.0602.7286. enlarge bathroom per plan, relocate furnace, water heater, washer and dryer. install structural beam per plan.

Open the permit page

$1,000
Jun 2, 2014Completed
final sign-off Apr 2015
154 Ulloa Stadd family room and a full bath. convert extg bedroom to 2 bedrooms on 1st floor.
Details
Permit
201406027286
Permit issued
Jul 2, 2014
Final sign-off
Apr 6, 2015

add family room and a full bath. convert extg bedroom to 2 bedrooms on 1st floor.

Open the permit page

$25,000
Oct 7, 2013Expired or cancelled
suspend Oct 2013
851 Page Stremodel 2nd fl 1 bath, 1 kitchen, open wall, add beams. add a master bath, washer dryer hookup. general mep upgrades, replace 12 windows in kind. visable from street.
Details
Permit
201310078595
Permit issued
Oct 7, 2013

remodel 2nd fl 1 bath, 1 kitchen, open wall, add beams. add a master bath, washer dryer hookup. general mep upgrades, replace 12 windows in kind. visable from street.

Open the permit page

$34,605
Sep 17, 2013Completed
final sign-off Aug 2014
90 Eastwood Dr1st floor alteration to add 2 bedrooms, 2 bathrooms and family room, new foundation, add half bathroom on 2/f. add new windows at side and rear of ground floor. excavation 12" max at ground floor to level slab.
Details
Permit
201309177008
Permit issued
Oct 15, 2013
Final sign-off
Aug 6, 2014

1st floor alteration to add 2 bedrooms, 2 bathrooms and family room, new foundation, add half bathroom on 2/f. add new windows at side and rear of ground floor. excavation 12" max at ground floor to level slab.

Open the permit page

$57,000
May 22, 2013Completed
final sign-off May 2015
2728 Irving Stfill-in addition @ rear deck, roof deck over fill-in. fill-in corner @ kitchen, add half bath, remodel kitchn, new doors & windows not visible from street, general mep upgrades, general structural reinformcements & footings as required.
Details
Permit
201305227598
Permit issued
Mar 10, 2014
Final sign-off
May 4, 2015

fill-in addition @ rear deck, roof deck over fill-in. fill-in corner @ kitchen, add half bath, remodel kitchn, new doors & windows not visible from street, general mep upgrades, general structural reinformcements & footings as required.

Open the permit page

$40,000