Back to bathroom remodel contractors
Kl Construction Group
- Based in
- Daly City
- On San Francisco permits
- May 2013 to Sep 2026
- Last 24 months
- 9 permits filed
120 permits since 2000: 101 completed, 2 in progress, 9 never finaled, 8 expired or cancelled.
Of the 9 never-finaled permits, 7 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
53 bathroom remodel permits: 43 completed, 7 never finaled, 3 expired or cancelled. Typically 7 days from filing to permit and 249 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 1563 43rd Av | revision to permit 202410152946. relocation of refrigerator and oven. closed 2 windows on 2/f bathroom in rear. remove partition wall in laundry room wall. no change in plumbing fixtures.Details
revision to permit 202410152946. relocation of refrigerator and oven. closed 2 windows on 2/f bathroom in rear. remove partition wall in laundry room wall. no change in plumbing fixtures. | $1,000 |
| Jun 6, 2025 | Completed final sign-off Feb 2026 | 1218 26th Av | units #102, #104, #202 - remodel (3) kitchens and (3) bathrooms in kind.Details
units #102, #104, #202 - remodel (3) kitchens and (3) bathrooms in kind. | $45,000 |
| Oct 15, 2024 | Completed final sign-off Oct 2025 | 1563 43rd Av | remodel kitchen, bathroom. add one bathroom and 1/2 bathroom on 2nd flr. 1st add 2 full bathroom, 2 bedroom, 2 family room. replacing all windows. 2nd flr reconfigure stairs.Details
remodel kitchen, bathroom. add one bathroom and 1/2 bathroom on 2nd flr. 1st add 2 full bathroom, 2 bedroom, 2 family room. replacing all windows. 2nd flr reconfigure stairs. | $200,000 |
| Oct 9, 2024 | Completed final sign-off Oct 2025 | 1563 43rd Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $25,000 |
| Jun 30, 2022 | Completed final sign-off Oct 2025 | 123 Forest View Dr | interior remodel of (e) un-finished 1st story, including new full bath. associated mechanical, plumbing, and electrical improvements. no change to existing footprint or street facing facade.Details
interior remodel of (e) un-finished 1st story, including new full bath. associated mechanical, plumbing, and electrical improvements. no change to existing footprint or street facing facade. | $80,000 |
| Jan 20, 2022 | Completed final sign-off Nov 2022 | 761 39th Av | 1/f: add 2 bedrooms, 2 full bath and media. 2/f: remodel kitchen, bathroom and bedrooms, add 1 full bath. add new deck.Details
1/f: add 2 bedrooms, 2 full bath and media. 2/f: remodel kitchen, bathroom and bedrooms, add 1 full bath. add new deck. | $120,000 |
| Oct 26, 2021 | Completed final sign-off Dec 2022 | 446 Diamond St | convert ground floor living and bedroom area to accessory dwelling unit - 535 sq ft two bedrooms, one bath, provide (n) kitchen, and widen stairs access route.Details
convert ground floor living and bedroom area to accessory dwelling unit - 535 sq ft two bedrooms, one bath, provide (n) kitchen, and widen stairs access route. | $20,000 |
| Oct 22, 2021 | Completed final sign-off Aug 2023 | 3025 21st Av | ground fl - add 1 bedrm, 1 family rm and 1 full bath & wet bar; 2nd fl - relocate kitchen, add 1 half bathrm, 1 laundry; 3rd fl - relocate 2 bathrooms; relocate stairs, replace front windows w/woodDetails
ground fl - add 1 bedrm, 1 family rm and 1 full bath & wet bar; 2nd fl - relocate kitchen, add 1 half bathrm, 1 laundry; 3rd fl - relocate 2 bathrooms; relocate stairs, replace front windows w/wood | $200,000 |
| Jun 23, 2021 | Completed final sign-off Nov 2021 | 312 Wayland St | revision to pa 2021-0405-7924 - 2nd and 3rd fl - reconfigure bathroom layout per plans. remove rear deck from scope of workDetails
revision to pa 2021-0405-7924 - 2nd and 3rd fl - reconfigure bathroom layout per plans. remove rear deck from scope of work | |
| Apr 5, 2021 | Completed final sign-off Nov 2021 | 312 Wayland St | 2nd fl: remodel bathroom and convert powder room to full bath, 3rd fl: remodel bathroom and powder room, new roof at rear, replace railings at front roof deck and sliding doorDetails
2nd fl: remodel bathroom and convert powder room to full bath, 3rd fl: remodel bathroom and powder room, new roof at rear, replace railings at front roof deck and sliding door | $48,000 |
| Mar 2, 2021 | Completed final sign-off Apr 2021 | 1767 40th Av | remodel kitchen (120sf) and 1 bath (50 sf) in kind. no change in walls and layout.Details
remodel kitchen (120sf) and 1 bath (50 sf) in kind. no change in walls and layout. | $18,000 |
| Feb 26, 2021 | Never finaled issued Feb 2021, no final | 2315 Divisadero St | remodel one full bathroom, one half bath (no removing walls)Details
remodel one full bathroom, one half bath (no removing walls) | $12,000 |
| Aug 25, 2020 | Completed final sign-off Aug 2022 | 134 Parker Av | construct 2 bedroom, 2 full bath,1 powder room & family room at ground floor. 2nd floor: remodel (e) kitchen, bathroom. construct 1 powder room. attic space: construct 2 full bathroom & convert (e) storage room to bedroom. construct 2 dormer (8'x8').Details
construct 2 bedroom, 2 full bath,1 powder room & family room at ground floor. 2nd floor: remodel (e) kitchen, bathroom. construct 1 powder room. attic space: construct 2 full bathroom & convert (e) storage room to bedroom. construct 2 dormer (8'x8'). | $180,000 |
| Jun 12, 2020 | Never finaled issued Jun 2020, no final | 3144 Clay St | remodel existing bathroom approx 5'x9'. remove tiling and cabinets. remodel existing kitchen with new shelves and new tiles. all remodel in-kind.Details
remodel existing bathroom approx 5'x9'. remove tiling and cabinets. remodel existing kitchen with new shelves and new tiles. all remodel in-kind. | $10,000 |
| Jul 29, 2019 | Completed final sign-off Apr 2020 | 638 26th Av | relocate kitchen, remodel (e) bath, convert (e) bedrm into bath rm, add 1 toilet rm at 2nd flr. in-fill under (e) bedrm, construct 2 bedrm, 2 bathrm at grnd flr. rebuilt conc retaining wall (under 4'-0" ht). replace all (e) footing w/newDetails
relocate kitchen, remodel (e) bath, convert (e) bedrm into bath rm, add 1 toilet rm at 2nd flr. in-fill under (e) bedrm, construct 2 bedrm, 2 bathrm at grnd flr. rebuilt conc retaining wall (under 4'-0" ht). replace all (e) footing w/new | $128,000 |
| Mar 18, 2019 | Completed final sign-off Aug 2019 | 1991 21st Av | construct two bedroom, two full bathrooms, media room at ground fl. relocate kitchen, remodel (e) bath, add one new bathroom & convert (e) kitchen to living room at 2nd fl. upgrade (e) ceiling framing at 2nd fl.Details
construct two bedroom, two full bathrooms, media room at ground fl. relocate kitchen, remodel (e) bath, add one new bathroom & convert (e) kitchen to living room at 2nd fl. upgrade (e) ceiling framing at 2nd fl. | $92,000 |
| Oct 18, 2018 | Completed final sign-off May 2019 | 849 26th Av | 1st floor: add 2 bedrooms, 2.5 baths, media room and laundry room. 2nd floor: remodel kitchen and bath. add 1.5 bathroom. reconfigure interior stairs.Details
1st floor: add 2 bedrooms, 2.5 baths, media room and laundry room. 2nd floor: remodel kitchen and bath. add 1.5 bathroom. reconfigure interior stairs. | $95,000 |
| Apr 30, 2018 | Never finaled filed Apr 2018, never issued | 676 10th Av | addition of dwelling unit per ord# 162-16. construct two bedrooms, one bathroom & one kitchen. all work @ ground fl.Details
addition of dwelling unit per ord# 162-16. construct two bedrooms, one bathroom & one kitchen. all work @ ground fl. | $54,000 |
| Apr 3, 2018 | Never finaled issued Apr 2018, no final | 674 10th Av | relocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 2nd fl.Details
relocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 2nd fl. | $58,000 |
| Apr 3, 2018 | Never finaled issued Apr 2018, no final | 676 10th Av | relocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 3rd fl.Details
relocate (e) kitchen. convert (e) living room to bedroom & construct two full bathroom. all work at 3rd fl. | $58,000 |
| Oct 4, 2017 | Completed final sign-off May 2019 | 754 20th Av | work on both units- remodel kitchens & bathrooms, add 1 full bathroom to each unit. relocate laundryDetails
work on both units- remodel kitchens & bathrooms, add 1 full bathroom to each unit. relocate laundry | $60,000 |
| Oct 3, 2017 | Completed final sign-off May 2019 | 754 20th Av | at 1st fl, legalize non-permit rooms to have a bedroom, living/dining area, kitchen and full bathroom uner legalization ordinance 43-14Details
at 1st fl, legalize non-permit rooms to have a bedroom, living/dining area, kitchen and full bathroom uner legalization ordinance 43-14 | $58,000 |
| Aug 30, 2017 | Completed final sign-off May 2018 | 2754 38th Av | 1/f- add a family room, a bedroom, a full bath. 2/f- remodel existing kitchen, 2 bathrooms.Details
1/f- add a family room, a bedroom, a full bath. 2/f- remodel existing kitchen, 2 bathrooms. | $60,000 |
| Jul 26, 2017 | Completed final sign-off May 2018 | 3535 Anza St | to comply with complaint 201770341 & 201771581, unit 3535 - relocate to 1st floor, add side entry door & window. unit 3537 - reconfigure interior layout, add 1 full bath, remodel 2 bathrooms & kitchen per plan. replace 7 windows at front. all windows to be woodDetails
to comply with complaint 201770341 & 201771581, unit 3535 - relocate to 1st floor, add side entry door & window. unit 3537 - reconfigure interior layout, add 1 full bath, remodel 2 bathrooms & kitchen per plan. replace 7 windows at front. all windows to be wood | $150,000 |
| Jun 5, 2017 | Completed final sign-off Feb 2018 | 42 Lakeview Av | remove (e) sheetrock, replace new 5/8" type 'x' gyp. bd. with r-19 insulation, construct 2 new bathroom, re-wire new electrical & lighting, all work at 2/fDetails
remove (e) sheetrock, replace new 5/8" type 'x' gyp. bd. with r-19 insulation, construct 2 new bathroom, re-wire new electrical & lighting, all work at 2/f | $58,000 |
| May 1, 2017 | Completed final sign-off Apr 2019 | 124 Moffitt St | extend (e) bedroom & construct new 1 full bathroom. all work at ground floorDetails
extend (e) bedroom & construct new 1 full bathroom. all work at ground floor | $28,000 |
| Apr 13, 2017 | Completed final sign-off Jul 2017 | 3717 Webster St | remodel bathroom, repair dry rot wood for the deck at backside (less than 50%) replace deckingDetails
remodel bathroom, repair dry rot wood for the deck at backside (less than 50%) replace decking | $9,000 |
| Mar 3, 2017 | Completed final sign-off Feb 2018 | 42 Lakeview Av | remodel upstairs kitchen and bathroom. no strucutral work. h.e. lighting. no change in openings or wall layout.Details
remodel upstairs kitchen and bathroom. no strucutral work. h.e. lighting. no change in openings or wall layout. | $18,000 |
| Sep 30, 2016 | Completed final sign-off Jan 2017 | 601 Van Ness Av | remodel one bathroom no structural workDetails
remodel one bathroom no structural work | $800 |
| Sep 6, 2016 | Completed final sign-off Feb 2017 | 1884 Bush St | relocate (e) kitchen,bathrm. construct one new bath rm & convert (e)kitchen, bathroom space into new bedrm. all work at ground floor. not visable from street, no proposed change unit count.Details
relocate (e) kitchen,bathrm. construct one new bath rm & convert (e)kitchen, bathroom space into new bedrm. all work at ground floor. not visable from street, no proposed change unit count. | $20,000 |
| Jul 11, 2016 | Completed final sign-off Jul 2016 | 471 23rd Av | to comply with physical inspection report # cc-7782 slb section 1031,109,210 & 3403 ,replace kitkchen cabinets (old to new) replace plumbing fixtures for bathroom, in unit # 1Details
to comply with physical inspection report # cc-7782 slb section 1031,109,210 & 3403 ,replace kitkchen cabinets (old to new) replace plumbing fixtures for bathroom, in unit # 1 | $30,000 |
| Mar 16, 2016 | Completed final sign-off May 2017 | 1775 Green St | revision to 2015 1016 9915 to include work at 3rd floor unit kitchen, remodel bathrooms, add powder room. remove walls at kitchen, remodel kitchen. provide new railing and replace (e) decking materials at (e) roof deck. no change to (e) structure.Details
revision to 2015 1016 9915 to include work at 3rd floor unit kitchen, remodel bathrooms, add powder room. remove walls at kitchen, remodel kitchen. provide new railing and replace (e) decking materials at (e) roof deck. no change to (e) structure. | $50,000 |
| Mar 14, 2016 | Never finaled issued Mar 2016, no final | 1177 California St | remodel (2) bathrooms, (1) laundry room; replace countertop.Details
remodel (2) bathrooms, (1) laundry room; replace countertop. | $18,000 |
| Nov 25, 2015 | Completed final sign-off Mar 2016 | 2 Fallon Pl | kitchen & bathroom renovation, replace water heater, add ventless washer/dryer, replace shut off valves, add flood stops to water heater, toilet, dishwasher & washer/dryer.Details
kitchen & bathroom renovation, replace water heater, add ventless washer/dryer, replace shut off valves, add flood stops to water heater, toilet, dishwasher & washer/dryer. | $10,000 |
| Oct 30, 2015 | Completed final sign-off Sep 2016 | 27 Roanoke St | 1st floor: add one bedroom, one full bath, family room, storage & infill open space under extg 2nd floor habitable area. 2nd floor: remodel kitchen, bedrooms, bathroom. living room and add one full bath room per plan.Details
1st floor: add one bedroom, one full bath, family room, storage & infill open space under extg 2nd floor habitable area. 2nd floor: remodel kitchen, bedrooms, bathroom. living room and add one full bath room per plan. | $86,300 |
| Sep 8, 2015 | Completed final sign-off Feb 2017 | 1773 Green St | remodel (e) kitchen & 2 bathrooms.Details
remodel (e) kitchen & 2 bathrooms. | $25,000 |
| Aug 3, 2015 | Never finaled issued Aug 2015, no final | 1727 34th Av | remodel kitchen and two bathrooms. no structural workDetails
remodel kitchen and two bathrooms. no structural work | $28,000 |
| Jun 11, 2015 | Expired or cancelled cancelled Aug 2016 | 99 Merced Av | remodel one bathroom at second floor (no structural work). all work in-kind.Details
remodel one bathroom at second floor (no structural work). all work in-kind. | $9,000 |
| Jun 1, 2015 | Completed final sign-off Apr 2016 | 44 Parker Av | remodel kitchen and bath. open up non bearing walls. add plywood to existing walls. uopen up 4 small closet doors along hallway bearing wall add 4x6 headers, no major structural reframing. double joists in garage under plywood. gen mep upgradesDetails
remodel kitchen and bath. open up non bearing walls. add plywood to existing walls. uopen up 4 small closet doors along hallway bearing wall add 4x6 headers, no major structural reframing. double joists in garage under plywood. gen mep upgrades | $57,314 |
| Jun 1, 2015 | Expired or cancelled cancelled Jan 2017 | 46 Cook St | remodel kitchen, new bath, add interior stairs to basement and attic for coenvenience, window and door changes not visible from street. no change in basementDetails
remodel kitchen, new bath, add interior stairs to basement and attic for coenvenience, window and door changes not visible from street. no change in basement | $35,717 |
| Apr 27, 2015 | Completed final sign-off Aug 2015 | 446 Diamond St | revision to app#201304225065 to show as built for final. change family, guest, and bath on grnd fl. to family, 2 bedrooms and 1/2 bath. on 2nd: wall between breakfast and hall to remain. add ul-listed fireplace to living room.Details
revision to app#201304225065 to show as built for final. change family, guest, and bath on grnd fl. to family, 2 bedrooms and 1/2 bath. on 2nd: wall between breakfast and hall to remain. add ul-listed fireplace to living room. | |
| Apr 20, 2015 | Completed final sign-off Jul 2015 | 1047 Filbert St | remodel 2 bathrooms and one laundry room. no structure work.Details
remodel 2 bathrooms and one laundry room. no structure work. | $20,000 |
| Feb 10, 2015 | Completed final sign-off Feb 2017 | 1774 09th Av | work refer to the physical inspection report #cc-7823, kitchen & bath remodel at unit#2.Details
work refer to the physical inspection report #cc-7823, kitchen & bath remodel at unit#2. | $2,000 |
| Jan 20, 2015 | Completed final sign-off Jun 2015 | 1448 12th Av | remodel existing kitchen. widen openings to dining and breakfast rooms. add plywood to 2 walls. reinforce breakfast and bath floor joists to level floors. add a skylight. add windows not visible from sreet. general mep upgrades.Details
remodel existing kitchen. widen openings to dining and breakfast rooms. add plywood to 2 walls. reinforce breakfast and bath floor joists to level floors. add a skylight. add windows not visible from sreet. general mep upgrades. | $25,000 |
| Dec 18, 2014 | Completed final sign-off Mar 2015 | 851 Page St | remodel bathroom, replace countertop, cabinets, sink. replace one outside door and window (at rear side) at basement level due to the foundation work.Details
remodel bathroom, replace countertop, cabinets, sink. replace one outside door and window (at rear side) at basement level due to the foundation work. | $9,000 |
| Sep 12, 2014 | Completed final sign-off Mar 2015 | 419 09th Av | #2- add a full bath. #1 & #2- remodel (e) baths and kitchen. repair (e) rear stair and siding, replace all exterior windows with new wood on front and side facing street. n/a ordinance #155-13Details
#2- add a full bath. #1 & #2- remodel (e) baths and kitchen. repair (e) rear stair and siding, replace all exterior windows with new wood on front and side facing street. n/a ordinance #155-13 | $40,000 |
| Aug 8, 2014 | Completed final sign-off Sep 2014 | 2431 27th Av | remodel 1 bathroom at 3/f, no walls to be removedDetails
remodel 1 bathroom at 3/f, no walls to be removed | $8,000 |
| Jul 21, 2014 | Completed final sign-off Apr 2015 | 154 Ulloa St | revision appl 2014.0602.7286. enlarge bathroom per plan, relocate furnace, water heater, washer and dryer. install structural beam per plan.Details
revision appl 2014.0602.7286. enlarge bathroom per plan, relocate furnace, water heater, washer and dryer. install structural beam per plan. | $1,000 |
| Jul 21, 2014 | Completed final sign-off Mar 2017 | 232 Guerrero St | addition to rear of bldg on 3rd floor including 1 bath, 1 bedroom, 1 personal office and exercise roomDetails
addition to rear of bldg on 3rd floor including 1 bath, 1 bedroom, 1 personal office and exercise room | $98,000 |
| Jun 2, 2014 | Completed final sign-off Apr 2015 | 154 Ulloa St | add family room and a full bath. convert extg bedroom to 2 bedrooms on 1st floor.Details
add family room and a full bath. convert extg bedroom to 2 bedrooms on 1st floor. | $25,000 |
| Oct 7, 2013 | Expired or cancelled suspend Oct 2013 | 851 Page St | remodel 2nd fl 1 bath, 1 kitchen, open wall, add beams. add a master bath, washer dryer hookup. general mep upgrades, replace 12 windows in kind. visable from street.Details
remodel 2nd fl 1 bath, 1 kitchen, open wall, add beams. add a master bath, washer dryer hookup. general mep upgrades, replace 12 windows in kind. visable from street. | $34,605 |
| Sep 17, 2013 | Completed final sign-off Aug 2014 | 90 Eastwood Dr | 1st floor alteration to add 2 bedrooms, 2 bathrooms and family room, new foundation, add half bathroom on 2/f. add new windows at side and rear of ground floor. excavation 12" max at ground floor to level slab.Details
1st floor alteration to add 2 bedrooms, 2 bathrooms and family room, new foundation, add half bathroom on 2/f. add new windows at side and rear of ground floor. excavation 12" max at ground floor to level slab. | $57,000 |
| May 22, 2013 | Completed final sign-off May 2015 | 2728 Irving St | fill-in addition @ rear deck, roof deck over fill-in. fill-in corner @ kitchen, add half bath, remodel kitchn, new doors & windows not visible from street, general mep upgrades, general structural reinformcements & footings as required.Details
fill-in addition @ rear deck, roof deck over fill-in. fill-in corner @ kitchen, add half bath, remodel kitchn, new doors & windows not visible from street, general mep upgrades, general structural reinformcements & footings as required. | $40,000 |