Kinstan Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Jun 2019 to May 2025
- Last 24 months
- 1 permit filed
30 permits since 2000: 23 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 expired or cancelled. Typically 652 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 4, 2021 | Expired or cancelled expired Jul 2026 | 519 Silver Av | replace electrical meter comply w/his nov 202177482 item #6,7,8,9,10. replace exterior wood stair in-kind @ rear comply/ w nov 202177752. remove & replace damaged exterior siding. replace (e) electric heat w/ (n) heat pump heaters. patch ceiling in (e) corridor.Details
replace electrical meter comply w/his nov 202177482 item #6,7,8,9,10. replace exterior wood stair in-kind @ rear comply/ w nov 202177752. remove & replace damaged exterior siding. replace (e) electric heat w/ (n) heat pump heaters. patch ceiling in (e) corridor. | $40,000 |