Back to kitchen remodel contractors
Kinstan Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Jun 2019 to May 2025
- Last 24 months
- 1 permit filed
30 permits since 2000: 23 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 never finaled. Typically 1 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2022 | Completed final sign-off May 2023 | 1624 Kirkham St | kitchen and bathroom remodeling at 2nd fl. no structure changeDetails
kitchen and bathroom remodeling at 2nd fl. no structure change | $19,000 |
| Oct 27, 2021 | Completed final sign-off Sep 2022 | 1787 09th Av | unit #1787 remodel kitchen and bathroom; add one bathroom and bedroom. remodel living room and replace sheetrock. on 2nd floor only.Details
unit #1787 remodel kitchen and bathroom; add one bathroom and bedroom. remodel living room and replace sheetrock. on 2nd floor only. | $38,000 |
| Aug 16, 2021 | Completed final sign-off Aug 2021 | 2605 Anza St | repair damaged ceilings approximately 20 sqft in kitchen per complaint 202179514. remove existing damaged ceilings with new sheetrock with 5/8 type x.Details
repair damaged ceilings approximately 20 sqft in kitchen per complaint 202179514. remove existing damaged ceilings with new sheetrock with 5/8 type x. | $1,200 |
| Jul 19, 2021 | Completed final sign-off Jan 2022 | 456 09th Av | 3rd fl, unit 3 extg kitchen and 2 bathroom with shower pan remodeling. no structure change.Details
3rd fl, unit 3 extg kitchen and 2 bathroom with shower pan remodeling. no structure change. | $25,000 |
| Jun 2, 2021 | Completed final sign-off May 2022 | 1721 Cabrillo St | add 1 bedroom, 1 family room, 1 full bath, utility room at gr fl. 2nd fl kitchen remodel and bath.Details
add 1 bedroom, 1 family room, 1 full bath, utility room at gr fl. 2nd fl kitchen remodel and bath. | $80,000 |
| Jul 20, 2020 | Completed final sign-off Oct 2020 | 2459 41st Av | replace kitchen cabinets and countertop, replace kitchen sink and faucet, add new gfci outlets in kitchen. kitchen size approx. 120 sqft. all work in kind.Details
replace kitchen cabinets and countertop, replace kitchen sink and faucet, add new gfci outlets in kitchen. kitchen size approx. 120 sqft. all work in kind. | $9,500 |
| Jul 2, 2020 | Completed final sign-off Jun 2021 | 1347 Oak St | 4th floor: remodel (e) kitchen & bathroom. replace counter, cabinets, and sink. all work in 1347 oak st.Details
4th floor: remodel (e) kitchen & bathroom. replace counter, cabinets, and sink. all work in 1347 oak st. | $30,000 |
| Jul 2, 2020 | Completed final sign-off Jun 2021 | 1349 Oak St | 3rd floor: remodel (e) kitchen & bathroom. replace counter, cabinets, and sink. all work in 1349 oak st.Details
3rd floor: remodel (e) kitchen & bathroom. replace counter, cabinets, and sink. all work in 1349 oak st. | $30,000 |
| Jun 18, 2019 | Never finaled issued Jun 2019, no final | 2011 Bancroft Av | 2/f kitchen and bathroom remodeling. replace/repair 45% of (e) roof.Details
2/f kitchen and bathroom remodeling. replace/repair 45% of (e) roof. | $25,000 |