Back to bathroom remodel contractors
Kinstan Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Jun 2019 to May 2025
- Last 24 months
- 1 permit filed
30 permits since 2000: 23 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 1 in progress, 1 never finaled. Typically 6 days from filing to permit and 288 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2025 | In progress issued Jun 2025 | 980 Moscow St | 1st floor remodel bedrooms and bathroom. relocated washer and dryer. add wetbar, one bath, kirchenette and media room.Details
1st floor remodel bedrooms and bathroom. relocated washer and dryer. add wetbar, one bath, kirchenette and media room. | $87,600 |
| Dec 6, 2022 | Completed final sign-off May 2023 | 1624 Kirkham St | kitchen and bathroom remodeling at 2nd fl. no structure changeDetails
kitchen and bathroom remodeling at 2nd fl. no structure change | $19,000 |
| Dec 20, 2021 | Completed final sign-off Sep 2022 | 1785 09th Av | top floor: convert (e) dining room to bedroom legalize (e) half-bath and renovate laundry area.Details
top floor: convert (e) dining room to bedroom legalize (e) half-bath and renovate laundry area. | $10,000 |
| Oct 27, 2021 | Completed final sign-off Sep 2022 | 1787 09th Av | unit #1787 remodel kitchen and bathroom; add one bathroom and bedroom. remodel living room and replace sheetrock. on 2nd floor only.Details
unit #1787 remodel kitchen and bathroom; add one bathroom and bedroom. remodel living room and replace sheetrock. on 2nd floor only. | $38,000 |
| Jul 19, 2021 | Completed final sign-off Jan 2022 | 456 09th Av | 3rd fl, unit 3 extg kitchen and 2 bathroom with shower pan remodeling. no structure change.Details
3rd fl, unit 3 extg kitchen and 2 bathroom with shower pan remodeling. no structure change. | $25,000 |
| Jun 2, 2021 | Completed final sign-off May 2022 | 1721 Cabrillo St | add 1 bedroom, 1 family room, 1 full bath, utility room at gr fl. 2nd fl kitchen remodel and bath.Details
add 1 bedroom, 1 family room, 1 full bath, utility room at gr fl. 2nd fl kitchen remodel and bath. | $80,000 |
| Jul 2, 2020 | Completed final sign-off Jun 2021 | 1347 Oak St | 4th floor: remodel (e) kitchen & bathroom. replace counter, cabinets, and sink. all work in 1347 oak st.Details
4th floor: remodel (e) kitchen & bathroom. replace counter, cabinets, and sink. all work in 1347 oak st. | $30,000 |
| Jul 2, 2020 | Completed final sign-off Jun 2021 | 1349 Oak St | 3rd floor: remodel (e) kitchen & bathroom. replace counter, cabinets, and sink. all work in 1349 oak st.Details
3rd floor: remodel (e) kitchen & bathroom. replace counter, cabinets, and sink. all work in 1349 oak st. | $30,000 |
| Nov 14, 2019 | Completed final sign-off May 2020 | 437 Peninsula Av | 1) 2nd floor: remodel bath and add on bath. 2) 1st floor: add 2 bedrooms, 2 bath and family room per plan.Details
1) 2nd floor: remodel bath and add on bath. 2) 1st floor: add 2 bedrooms, 2 bath and family room per plan. | $65,000 |
| Jun 18, 2019 | Never finaled issued Jun 2019, no final | 2011 Bancroft Av | 2/f kitchen and bathroom remodeling. replace/repair 45% of (e) roof.Details
2/f kitchen and bathroom remodeling. replace/repair 45% of (e) roof. | $25,000 |