Kingfish Construction Llc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Aug 2026
- Last 24 months
- 14 permits filed
78 permits since 2000: 55 completed, 14 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
15 stairs permits: 8 completed, 4 in progress, 3 never finaled. Typically 39 days from filing to permit and 205 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2025 | In progress issued Jan 2026 | 199 Edgewood Av | interior alteration. 1st fl: remove (e) spiral stairs, replace with new. new layout. existing kitchen & bath remodel. replace (e) rear patio door with new, same opening. 2nd fl: remodel (e) half bath & bath into (n) master bath. (n) full half bath. remodel (e) den & master bedroom.Details
interior alteration. 1st fl: remove (e) spiral stairs, replace with new. new layout. existing kitchen & bath remodel. replace (e) rear patio door with new, same opening. 2nd fl: remodel (e) half bath & bath into (n) master bath. (n) full half bath. remodel (e) den & master bedroom. | $200,000 |
| Jul 10, 2025 | In progress issued Jul 2025 | 2081 47th Av | convert part of (e) the first floor into (n) conditioned bedroom suite and mud room, remodel (e) kitchen, remove (e) wall between kitchen/dining and living, remove and replace (e) interior staircase , 9n) sklylight over stairs, (n) exterior deck and stairs at rear yard.Details
convert part of (e) the first floor into (n) conditioned bedroom suite and mud room, remodel (e) kitchen, remove (e) wall between kitchen/dining and living, remove and replace (e) interior staircase , 9n) sklylight over stairs, (n) exterior deck and stairs at rear yard. | $90,000 |
| Nov 15, 2024 | In progress issued Apr 2025 | 1487 44th Av | comply with nov #202429020 rebuild (e) rear exterior deck & stairs in kind. replace (e) rear wall shingles. first fl: replace (e) rear doors & windows. (n) interior finishes, fixtures, cabinets in kind. repair (e) interior south framed wall per structural.Details
comply with nov #202429020 rebuild (e) rear exterior deck & stairs in kind. replace (e) rear wall shingles. first fl: replace (e) rear doors & windows. (n) interior finishes, fixtures, cabinets in kind. repair (e) interior south framed wall per structural. | $40,000 |
| Oct 25, 2023 | In progress issued Apr 2024 | 2042 45th Av | horizontal addition -part of (e) exterior entry to be converted to living space. expand (e) bedroom, bathroom, and closet at rear of (e) house. add roof deck and stairs to new addition.Details
horizontal addition -part of (e) exterior entry to be converted to living space. expand (e) bedroom, bathroom, and closet at rear of (e) house. add roof deck and stairs to new addition. | $90,132 |
| Oct 6, 2022 | Completed final sign-off Jul 2023 | 3701 Kirkham St | 1st fl. add new wall to separate (e) bedroom rom stair, lower fl. by 7 1/2 to increase ceiling height, new walk -in closet, new sliding door, remodel bathroom, increase in conditioned fl. space of 63 sf. 2nd fl. remove (e) fireplace, reconfigure (e) bath to create (n) full bath and (n) 1/2 bathDetails
1st fl. add new wall to separate (e) bedroom rom stair, lower fl. by 7 1/2 to increase ceiling height, new walk -in closet, new sliding door, remodel bathroom, increase in conditioned fl. space of 63 sf. 2nd fl. remove (e) fireplace, reconfigure (e) bath to create (n) full bath and (n) 1/2 bath | $50,000 |
| Sep 2, 2022 | Completed final sign-off Aug 2024 | 1562 15th Av | lower flr: convert (e) storage area into (n) dining/living, kitchen and half bath, remove (e) and replace with (n) stairs connecting foyer to lower floor , remove (e) exterior rear deck and stairs (n) rear exterior doors, (n) foyer closet. upper flr: add (n) closet and full bath to (e) family rm (n)Details
lower flr: convert (e) storage area into (n) dining/living, kitchen and half bath, remove (e) and replace with (n) stairs connecting foyer to lower floor , remove (e) exterior rear deck and stairs (n) rear exterior doors, (n) foyer closet. upper flr: add (n) closet and full bath to (e) family rm (n) | $150,000 |
| Jan 19, 2022 | Never finaled issued Jan 2022, no final | 1900 45th Av | demo 2nd floor bath and replace like kind. add skylight above staircase.Details
demo 2nd floor bath and replace like kind. add skylight above staircase. | $10,000 |
| Oct 4, 2021 | Never finaled issued Apr 2022, no final | 2646 45th Av | new exterior deck & stairway from back of existing house. remove 1 exsiting window, enlarge opening & replace with 1 new door (not visible from street)Details
new exterior deck & stairway from back of existing house. remove 1 exsiting window, enlarge opening & replace with 1 new door (not visible from street) | $15,000 |
| Jun 9, 2021 | Completed final sign-off Nov 2021 | 2247 38th Av | 1/f; remove/replace (e) interior stairway. convert part of (e) storage area into new hall 1. 2/f; remodel (e) kitchen. remove (e) interior wall b/t (e) kitchen and (e) dining. remove (e) interior wall b/t (e) game room and (e) office. add new interior hall 2. new window in (e) office.Details
1/f; remove/replace (e) interior stairway. convert part of (e) storage area into new hall 1. 2/f; remodel (e) kitchen. remove (e) interior wall b/t (e) kitchen and (e) dining. remove (e) interior wall b/t (e) game room and (e) office. add new interior hall 2. new window in (e) office. | $60,000 |
| Oct 24, 2020 | Completed final sign-off Mar 2021 | 2341 27th Av | interior remodel: kitchen - remove/replace (e) appliances, countertop, cabinets, and wall/ceiling finishes w/ (n) layout. bath - remove/replace (e) fixtures & wall/ceiling finishes w/ new layout. interior stairs: remove/replace w/ new. remove (e) hall closet. remodel (e) pantry.Details
interior remodel: kitchen - remove/replace (e) appliances, countertop, cabinets, and wall/ceiling finishes w/ (n) layout. bath - remove/replace (e) fixtures & wall/ceiling finishes w/ new layout. interior stairs: remove/replace w/ new. remove (e) hall closet. remodel (e) pantry. | $65,000 |
| Oct 24, 2020 | Never finaled issued Feb 2021, no final | 467 Joost Av | convert portion of (e) 1/f into conditioned spaces -entertainment room, 3 bedrooms, 2 bathrooms. new drywall and insulation in (e) garage. new rear deck and stairs. r/r rear window and door with new size and locations. structural work.Details
convert portion of (e) 1/f into conditioned spaces -entertainment room, 3 bedrooms, 2 bathrooms. new drywall and insulation in (e) garage. new rear deck and stairs. r/r rear window and door with new size and locations. structural work. | $50,000 |
| Sep 25, 2020 | Completed final sign-off Jul 2022 | 1900 45th Av | demo interior & exterior stairs , replace w/ 1 stair. develop habitable space on 1st floor.Details
demo interior & exterior stairs , replace w/ 1 stair. develop habitable space on 1st floor. | $40,000 |
| Jul 27, 2018 | Completed final sign-off Feb 2019 | 1 Country Club Dr | (n) 1 story exterior stair case on side of bldg. of (e) deck.Details
(n) 1 story exterior stair case on side of bldg. of (e) deck. | $8,000 |
| Jul 27, 2018 | Completed final sign-off Nov 2018 | 2751 Greenwich St | (n) exterior back deck, staircase, and elevated walkway/bridge rear of building.Details
(n) exterior back deck, staircase, and elevated walkway/bridge rear of building. | $25,000 |
| Mar 9, 2018 | Completed final sign-off Nov 2018 | 1631 43rd Av | interior remolel, convert part of e gr fl into habitable space to include mastr bdrm, master bath, laundry closet, new patio door and window, new ext deck, stairs. mpe and sturctural work for remodel and deckDetails
interior remolel, convert part of e gr fl into habitable space to include mastr bdrm, master bath, laundry closet, new patio door and window, new ext deck, stairs. mpe and sturctural work for remodel and deck | $60,000 |