Back to bathroom remodel contractors
Kingfish Construction Llc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Aug 2026
- Last 24 months
- 14 permits filed
78 permits since 2000: 55 completed, 14 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
35 bathroom remodel permits: 26 completed, 5 in progress, 4 never finaled. Typically 16 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Sep 2026 | 1730 45th Av | remodel (e) kitchen & bath. remove part of baring wall. replace windows at rear. convert part of entry to living space.Details
remodel (e) kitchen & bath. remove part of baring wall. replace windows at rear. convert part of entry to living space. | $85,000 |
| Apr 6, 2026 | In progress issued Jun 2026 | 45 Alton Av | convert (e) closet into full bathroom., remodel (e) bathroom to (n) bathroom / (n) layoutDetails
convert (e) closet into full bathroom., remodel (e) bathroom to (n) bathroom / (n) layout | $29,500 |
| Apr 6, 2026 | Completed final sign-off Sep 2026 | 501 Ortega St | kitchen and 2 bathroom remodels, replacing toilets, sinks, replace kitchen cabinets, tiles, flooring.Details
kitchen and 2 bathroom remodels, replacing toilets, sinks, replace kitchen cabinets, tiles, flooring. | $60,000 |
| Dec 19, 2025 | In progress issued Jan 2026 | 199 Edgewood Av | interior alteration. 1st fl: remove (e) spiral stairs, replace with new. new layout. existing kitchen & bath remodel. replace (e) rear patio door with new, same opening. 2nd fl: remodel (e) half bath & bath into (n) master bath. (n) full half bath. remodel (e) den & master bedroom.Details
interior alteration. 1st fl: remove (e) spiral stairs, replace with new. new layout. existing kitchen & bath remodel. replace (e) rear patio door with new, same opening. 2nd fl: remodel (e) half bath & bath into (n) master bath. (n) full half bath. remodel (e) den & master bedroom. | $200,000 |
| Feb 7, 2025 | Completed final sign-off Apr 2026 | 45 Alton Av | interior alteration of (e) 2nd fl. kitchen & bath. replace 1 (e) rear window in same opening widthDetails
interior alteration of (e) 2nd fl. kitchen & bath. replace 1 (e) rear window in same opening width | $55,000 |
| Nov 5, 2024 | Completed final sign-off Jan 2026 | 2046 48th Av | 1st flr renovate floor 1, utilize portion of garage for excercise/utility room. create 2 bedrooms and bath. reconfifure rear deck (<10' tall).Details
1st flr renovate floor 1, utilize portion of garage for excercise/utility room. create 2 bedrooms and bath. reconfifure rear deck (<10' tall). | $40,000 |
| May 29, 2024 | Completed final sign-off Dec 2024 | 1730 47th Av | demo (e) kitchen and bath. no change to walls, replace flooring, sheetrock, appliances, electrical and plumbing in kitchen and bath. new cabinetry.Details
demo (e) kitchen and bath. no change to walls, replace flooring, sheetrock, appliances, electrical and plumbing in kitchen and bath. new cabinetry. | $30,000 |
| May 17, 2024 | Completed final sign-off Feb 2026 | 254 09th Av | demo bathroom- bathroom remodel: new tub install, new sheetrock, and new tileDetails
demo bathroom- bathroom remodel: new tub install, new sheetrock, and new tile | $10,000 |
| Apr 30, 2024 | Completed final sign-off Dec 2024 | 1879 43rd Av | interior alteration and addition: convert portion of (e) unconditioned space at first floor into conditioned bedroom, full bath, and den. (n) windows and door facing back yard.Details
interior alteration and addition: convert portion of (e) unconditioned space at first floor into conditioned bedroom, full bath, and den. (n) windows and door facing back yard. | $75,000 |
| Dec 18, 2023 | In progress issued Dec 2023 | 8 16th Av | remodel guest bathroom on second floorDetails
remodel guest bathroom on second floor | $15,000 |
| Oct 25, 2023 | In progress issued Apr 2024 | 2042 45th Av | horizontal addition -part of (e) exterior entry to be converted to living space. expand (e) bedroom, bathroom, and closet at rear of (e) house. add roof deck and stairs to new addition.Details
horizontal addition -part of (e) exterior entry to be converted to living space. expand (e) bedroom, bathroom, and closet at rear of (e) house. add roof deck and stairs to new addition. | $90,132 |
| Aug 24, 2023 | Completed final sign-off Dec 2024 | 1662 47th Av | new office and bathroom at 1st fl. new doors and windows at rearDetails
new office and bathroom at 1st fl. new doors and windows at rear | $65,000 |
| Jul 10, 2023 | Completed final sign-off Apr 2024 | 230 Irving St | revision to pa# 202305198186, remodel existing bath & closet w/ new layout and finishes.Details
revision to pa# 202305198186, remodel existing bath & closet w/ new layout and finishes. | |
| May 19, 2023 | Completed final sign-off Apr 2024 | 230 Irving St | remodel bath: new shower, vanity, closet, toilet, new tile floor, in kind. all new windows in kind on front of building. marvin awning clad wood interior. u-factor 0.3 maxDetails
remodel bath: new shower, vanity, closet, toilet, new tile floor, in kind. all new windows in kind on front of building. marvin awning clad wood interior. u-factor 0.3 max | $30,000 |
| Oct 6, 2022 | Completed final sign-off Jul 2023 | 3701 Kirkham St | 1st fl. add new wall to separate (e) bedroom rom stair, lower fl. by 7 1/2 to increase ceiling height, new walk -in closet, new sliding door, remodel bathroom, increase in conditioned fl. space of 63 sf. 2nd fl. remove (e) fireplace, reconfigure (e) bath to create (n) full bath and (n) 1/2 bathDetails
1st fl. add new wall to separate (e) bedroom rom stair, lower fl. by 7 1/2 to increase ceiling height, new walk -in closet, new sliding door, remodel bathroom, increase in conditioned fl. space of 63 sf. 2nd fl. remove (e) fireplace, reconfigure (e) bath to create (n) full bath and (n) 1/2 bath | $50,000 |
| Sep 2, 2022 | Completed final sign-off Aug 2024 | 1562 15th Av | lower flr: convert (e) storage area into (n) dining/living, kitchen and half bath, remove (e) and replace with (n) stairs connecting foyer to lower floor , remove (e) exterior rear deck and stairs (n) rear exterior doors, (n) foyer closet. upper flr: add (n) closet and full bath to (e) family rm (n)Details
lower flr: convert (e) storage area into (n) dining/living, kitchen and half bath, remove (e) and replace with (n) stairs connecting foyer to lower floor , remove (e) exterior rear deck and stairs (n) rear exterior doors, (n) foyer closet. upper flr: add (n) closet and full bath to (e) family rm (n) | $150,000 |
| Jul 12, 2022 | Completed final sign-off Mar 2023 | 1554 44th Av | 1st fl: convert 659sf of habitalbe space: office, bathroom, walk-in closet, den, and laundry within existing envelope. 2nd fl: remodel existing kitchen and bathroom.Details
1st fl: convert 659sf of habitalbe space: office, bathroom, walk-in closet, den, and laundry within existing envelope. 2nd fl: remodel existing kitchen and bathroom. | $250,000 |
| Jan 19, 2022 | Never finaled issued Jan 2022, no final | 1900 45th Av | demo 2nd floor bath and replace like kind. add skylight above staircase.Details
demo 2nd floor bath and replace like kind. add skylight above staircase. | $10,000 |
| Dec 30, 2021 | Completed final sign-off Sep 2022 | 1450 41st Av | kitchen remodel, bathroom remodel, infill existting light well(not on property line, not visible from any off site location), new windows at 3rd fl. (2)Details
kitchen remodel, bathroom remodel, infill existting light well(not on property line, not visible from any off site location), new windows at 3rd fl. (2) | $100,000 |
| Sep 29, 2021 | Never finaled issued Sep 2021, no final | 2319 47th Av | remove/replace tile on 2nd floor bathDetails
remove/replace tile on 2nd floor bath | $10,000 |
| Sep 29, 2021 | Completed final sign-off Oct 2022 | 1230 11th Av | 3 bathroom remodel and 1 kitchen remodel, non structuralDetails
3 bathroom remodel and 1 kitchen remodel, non structural | $90,000 |
| Oct 24, 2020 | Completed final sign-off Mar 2021 | 2341 27th Av | interior remodel: kitchen - remove/replace (e) appliances, countertop, cabinets, and wall/ceiling finishes w/ (n) layout. bath - remove/replace (e) fixtures & wall/ceiling finishes w/ new layout. interior stairs: remove/replace w/ new. remove (e) hall closet. remodel (e) pantry.Details
interior remodel: kitchen - remove/replace (e) appliances, countertop, cabinets, and wall/ceiling finishes w/ (n) layout. bath - remove/replace (e) fixtures & wall/ceiling finishes w/ new layout. interior stairs: remove/replace w/ new. remove (e) hall closet. remodel (e) pantry. | $65,000 |
| Oct 24, 2020 | Never finaled issued Feb 2021, no final | 467 Joost Av | convert portion of (e) 1/f into conditioned spaces -entertainment room, 3 bedrooms, 2 bathrooms. new drywall and insulation in (e) garage. new rear deck and stairs. r/r rear window and door with new size and locations. structural work.Details
convert portion of (e) 1/f into conditioned spaces -entertainment room, 3 bedrooms, 2 bathrooms. new drywall and insulation in (e) garage. new rear deck and stairs. r/r rear window and door with new size and locations. structural work. | $50,000 |
| Oct 15, 2020 | Completed final sign-off Jun 2021 | 2007 41st Av | interior alteration: kitchen: remove & replace (e) appliances, countertop, cabinets, and finishes w/(n). (n) layout. remove portion of (e) wall between (e) kitchen/dining and (e) living room. (n) framing per structural. mech, plumb, elec. related to scope of work. legalize den and full bath on gf.Details
interior alteration: kitchen: remove & replace (e) appliances, countertop, cabinets, and finishes w/(n). (n) layout. remove portion of (e) wall between (e) kitchen/dining and (e) living room. (n) framing per structural. mech, plumb, elec. related to scope of work. legalize den and full bath on gf. | $40,000 |
| Jul 1, 2020 | Completed final sign-off Mar 2021 | 2431 26th Av | remodel kitchen and 2 bathrooms. new 4 windows not visible from street. new skylight. new walls.Details
remodel kitchen and 2 bathrooms. new 4 windows not visible from street. new skylight. new walls. | $70,000 |
| Oct 31, 2018 | Completed final sign-off Mar 2019 | 1547 23rd Av | interior remodel of 2nd floor bathroom. remodel to include the removal of existing skylight, enclosure of 11 sq ft. interior lightwell, enlargement of existing bathroom and installation of new skylight in bathroomDetails
interior remodel of 2nd floor bathroom. remodel to include the removal of existing skylight, enclosure of 11 sq ft. interior lightwell, enlargement of existing bathroom and installation of new skylight in bathroom | $10,000 |
| Sep 21, 2018 | Never finaled issued Apr 2019, no final | 2242 48th Av | add units per ordinance# 95-17. convert areas of (e) 1st floor into (n) adu unit (1 bedroom & 1 bath).Details
add units per ordinance# 95-17. convert areas of (e) 1st floor into (n) adu unit (1 bedroom & 1 bath). | $30,000 |
| Sep 13, 2018 | Completed final sign-off Jul 2020 | 2030 48th Av | 3rd floor addition of 715 sq ft with a 419 sq ft wooden roof deck. remodel of (e) 2nd floor to include a new 1/2 bathDetails
3rd floor addition of 715 sq ft with a 419 sq ft wooden roof deck. remodel of (e) 2nd floor to include a new 1/2 bath | $115,000 |
| Mar 9, 2018 | Completed final sign-off Nov 2018 | 1631 43rd Av | interior remolel, convert part of e gr fl into habitable space to include mastr bdrm, master bath, laundry closet, new patio door and window, new ext deck, stairs. mpe and sturctural work for remodel and deckDetails
interior remolel, convert part of e gr fl into habitable space to include mastr bdrm, master bath, laundry closet, new patio door and window, new ext deck, stairs. mpe and sturctural work for remodel and deck | $60,000 |
| Dec 22, 2017 | Completed final sign-off May 2018 | 1531 Sanchez St | 1531: bathroom remodel, mech, plmg, elec related work. 1533: bathroom remodel, mech, plmg, & elec. related work. close exg door, new door opening.Details
1531: bathroom remodel, mech, plmg, elec related work. 1533: bathroom remodel, mech, plmg, & elec. related work. close exg door, new door opening. | $20,000 |
| Jul 14, 2017 | Completed final sign-off Aug 2017 | 595 41st Av | to comply with nov 201786091 dated 6/14/2017: work to include repair 40 sf of stucco in-kind at 2nd level facing street; remove illegal bathroom at garage level and to restore back to original use as storage space. no other work.Details
to comply with nov 201786091 dated 6/14/2017: work to include repair 40 sf of stucco in-kind at 2nd level facing street; remove illegal bathroom at garage level and to restore back to original use as storage space. no other work. | $800 |
| Mar 14, 2017 | Completed final sign-off May 2017 | 1991 32nd Av | kitchen and bath remodel. new lighting for living room, bedrooms, and bath. new fridge, dishwasher, and cabinets. all remodel works are within original area. no partition wall be removed or relocated. (lighting in kitchen per cec 150k)Details
kitchen and bath remodel. new lighting for living room, bedrooms, and bath. new fridge, dishwasher, and cabinets. all remodel works are within original area. no partition wall be removed or relocated. (lighting in kitchen per cec 150k) | $35,000 |
| Feb 21, 2017 | Completed final sign-off Mar 2018 | 1490 45th Av | kitchen & bathroom remodel. remove & replace sheetrock.Details
kitchen & bathroom remodel. remove & replace sheetrock. | $50,000 |
| Apr 14, 2015 | Completed final sign-off Aug 2015 | 2200 Sacramento St | unit #1403: remodel entire bathroom and closet, new sinks, toilet, shower, adding smoke detectors and c02 alarms; maher n/aDetails
unit #1403: remodel entire bathroom and closet, new sinks, toilet, shower, adding smoke detectors and c02 alarms; maher n/a | $25,000 |
| Apr 21, 2014 | Completed final sign-off Jul 2016 | 504 Arlington St | (n) second floor horizontal extension to the back of (e) house: (n) 1 bedroom, 1 bath and 1 laundryDetails
(n) second floor horizontal extension to the back of (e) house: (n) 1 bedroom, 1 bath and 1 laundry | $40,000 |