Back to kitchen remodel contractors
Kingfish Construction Llc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Aug 2026
- Last 24 months
- 14 permits filed
78 permits since 2000: 55 completed, 14 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
26 kitchen remodel permits: 20 completed, 5 in progress, 1 never finaled. Typically 8 days from filing to permit and 229 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Sep 2026 | 1730 45th Av | remodel (e) kitchen & bath. remove part of baring wall. replace windows at rear. convert part of entry to living space.Details
remodel (e) kitchen & bath. remove part of baring wall. replace windows at rear. convert part of entry to living space. | $85,000 |
| Apr 6, 2026 | In progress issued Jun 2026 | 2310 48th Av | remove portion of wall between (e) dining and living room, (n) post and beam per structural. remodel (e) kitchen.Details
remove portion of wall between (e) dining and living room, (n) post and beam per structural. remodel (e) kitchen. | $45,000 |
| Apr 6, 2026 | Completed final sign-off Sep 2026 | 501 Ortega St | kitchen and 2 bathroom remodels, replacing toilets, sinks, replace kitchen cabinets, tiles, flooring.Details
kitchen and 2 bathroom remodels, replacing toilets, sinks, replace kitchen cabinets, tiles, flooring. | $60,000 |
| Dec 19, 2025 | In progress issued Jan 2026 | 199 Edgewood Av | interior alteration. 1st fl: remove (e) spiral stairs, replace with new. new layout. existing kitchen & bath remodel. replace (e) rear patio door with new, same opening. 2nd fl: remodel (e) half bath & bath into (n) master bath. (n) full half bath. remodel (e) den & master bedroom.Details
interior alteration. 1st fl: remove (e) spiral stairs, replace with new. new layout. existing kitchen & bath remodel. replace (e) rear patio door with new, same opening. 2nd fl: remodel (e) half bath & bath into (n) master bath. (n) full half bath. remodel (e) den & master bedroom. | $200,000 |
| Jul 10, 2025 | In progress issued Jul 2025 | 2081 47th Av | convert part of (e) the first floor into (n) conditioned bedroom suite and mud room, remodel (e) kitchen, remove (e) wall between kitchen/dining and living, remove and replace (e) interior staircase , 9n) sklylight over stairs, (n) exterior deck and stairs at rear yard.Details
convert part of (e) the first floor into (n) conditioned bedroom suite and mud room, remodel (e) kitchen, remove (e) wall between kitchen/dining and living, remove and replace (e) interior staircase , 9n) sklylight over stairs, (n) exterior deck and stairs at rear yard. | $90,000 |
| Feb 7, 2025 | Completed final sign-off Apr 2026 | 45 Alton Av | interior alteration of (e) 2nd fl. kitchen & bath. replace 1 (e) rear window in same opening widthDetails
interior alteration of (e) 2nd fl. kitchen & bath. replace 1 (e) rear window in same opening width | $55,000 |
| May 29, 2024 | Completed final sign-off Dec 2024 | 1730 47th Av | demo (e) kitchen and bath. no change to walls, replace flooring, sheetrock, appliances, electrical and plumbing in kitchen and bath. new cabinetry.Details
demo (e) kitchen and bath. no change to walls, replace flooring, sheetrock, appliances, electrical and plumbing in kitchen and bath. new cabinetry. | $30,000 |
| Dec 18, 2023 | In progress issued Dec 2023 | 162 08th Av | new kitchen cabinets, new floor, replace tile backsplashDetails
new kitchen cabinets, new floor, replace tile backsplash | $15,000 |
| Oct 21, 2022 | Completed final sign-off Aug 2023 | 3139 Santiago St | 2/f: interior alteration, no structural, (e) kitchen remodel w/layout change, (e) full b ath remodel w/layout change, removal of (e) nonbearing wall between kitchen/dining/living roomDetails
2/f: interior alteration, no structural, (e) kitchen remodel w/layout change, (e) full b ath remodel w/layout change, removal of (e) nonbearing wall between kitchen/dining/living room | $35,000 |
| Sep 2, 2022 | Completed final sign-off Aug 2024 | 1562 15th Av | lower flr: convert (e) storage area into (n) dining/living, kitchen and half bath, remove (e) and replace with (n) stairs connecting foyer to lower floor , remove (e) exterior rear deck and stairs (n) rear exterior doors, (n) foyer closet. upper flr: add (n) closet and full bath to (e) family rm (n)Details
lower flr: convert (e) storage area into (n) dining/living, kitchen and half bath, remove (e) and replace with (n) stairs connecting foyer to lower floor , remove (e) exterior rear deck and stairs (n) rear exterior doors, (n) foyer closet. upper flr: add (n) closet and full bath to (e) family rm (n) | $150,000 |
| Jul 12, 2022 | Completed final sign-off Mar 2023 | 1554 44th Av | 1st fl: convert 659sf of habitalbe space: office, bathroom, walk-in closet, den, and laundry within existing envelope. 2nd fl: remodel existing kitchen and bathroom.Details
1st fl: convert 659sf of habitalbe space: office, bathroom, walk-in closet, den, and laundry within existing envelope. 2nd fl: remodel existing kitchen and bathroom. | $250,000 |
| Dec 30, 2021 | Completed final sign-off Sep 2022 | 1450 41st Av | kitchen remodel, bathroom remodel, infill existting light well(not on property line, not visible from any off site location), new windows at 3rd fl. (2)Details
kitchen remodel, bathroom remodel, infill existting light well(not on property line, not visible from any off site location), new windows at 3rd fl. (2) | $100,000 |
| Oct 6, 2021 | Completed final sign-off Feb 2025 | 1738 48th Av | vertical addtion for new kitchen, living & dining room. horizontal expansion for existing bedroom & guest room.Details
vertical addtion for new kitchen, living & dining room. horizontal expansion for existing bedroom & guest room. | $450,000 |
| Sep 29, 2021 | Completed final sign-off Oct 2022 | 1230 11th Av | 3 bathroom remodel and 1 kitchen remodel, non structuralDetails
3 bathroom remodel and 1 kitchen remodel, non structural | $90,000 |
| Jun 9, 2021 | Completed final sign-off Nov 2021 | 2247 38th Av | 1/f; remove/replace (e) interior stairway. convert part of (e) storage area into new hall 1. 2/f; remodel (e) kitchen. remove (e) interior wall b/t (e) kitchen and (e) dining. remove (e) interior wall b/t (e) game room and (e) office. add new interior hall 2. new window in (e) office.Details
1/f; remove/replace (e) interior stairway. convert part of (e) storage area into new hall 1. 2/f; remodel (e) kitchen. remove (e) interior wall b/t (e) kitchen and (e) dining. remove (e) interior wall b/t (e) game room and (e) office. add new interior hall 2. new window in (e) office. | $60,000 |
| Apr 26, 2021 | Never finaled issued Apr 2021, no final | 1328 Shrader St | kitchen remodel. (n) fixture, (n) tile, (n) floor, (n) cabinets. locations stay in existing locations. in-kind.Details
kitchen remodel. (n) fixture, (n) tile, (n) floor, (n) cabinets. locations stay in existing locations. in-kind. | $30,000 |
| Oct 24, 2020 | Completed final sign-off Mar 2021 | 2341 27th Av | interior remodel: kitchen - remove/replace (e) appliances, countertop, cabinets, and wall/ceiling finishes w/ (n) layout. bath - remove/replace (e) fixtures & wall/ceiling finishes w/ new layout. interior stairs: remove/replace w/ new. remove (e) hall closet. remodel (e) pantry.Details
interior remodel: kitchen - remove/replace (e) appliances, countertop, cabinets, and wall/ceiling finishes w/ (n) layout. bath - remove/replace (e) fixtures & wall/ceiling finishes w/ new layout. interior stairs: remove/replace w/ new. remove (e) hall closet. remodel (e) pantry. | $65,000 |
| Oct 15, 2020 | Completed final sign-off Jun 2021 | 2007 41st Av | interior alteration: kitchen: remove & replace (e) appliances, countertop, cabinets, and finishes w/(n). (n) layout. remove portion of (e) wall between (e) kitchen/dining and (e) living room. (n) framing per structural. mech, plumb, elec. related to scope of work. legalize den and full bath on gf.Details
interior alteration: kitchen: remove & replace (e) appliances, countertop, cabinets, and finishes w/(n). (n) layout. remove portion of (e) wall between (e) kitchen/dining and (e) living room. (n) framing per structural. mech, plumb, elec. related to scope of work. legalize den and full bath on gf. | $40,000 |
| Jul 1, 2020 | Completed final sign-off Mar 2021 | 2431 26th Av | remodel kitchen and 2 bathrooms. new 4 windows not visible from street. new skylight. new walls.Details
remodel kitchen and 2 bathrooms. new 4 windows not visible from street. new skylight. new walls. | $70,000 |
| Mar 19, 2019 | Completed final sign-off Jul 2020 | 2030 48th Av | remove and replace kitchen cabinets only, minimal sheet rack patch.Details
remove and replace kitchen cabinets only, minimal sheet rack patch. | $10,000 |
| Jan 14, 2019 | Completed final sign-off Mar 2019 | 1547 23rd Av | ref to pa# 201810314604. kitchen remodel, kitchen cabinet removal and replace with new/counter tops, sink, new wiring. 100 sq ft.Details
ref to pa# 201810314604. kitchen remodel, kitchen cabinet removal and replace with new/counter tops, sink, new wiring. 100 sq ft. | $1,000 |
| May 31, 2017 | Completed final sign-off Oct 2018 | 1490 45th Av | at 2nd flr remove interior walls at kitchen and dining room. (e) light court infill add roof and skylightDetails
at 2nd flr remove interior walls at kitchen and dining room. (e) light court infill add roof and skylight | $9,000 |
| Mar 14, 2017 | Completed final sign-off May 2017 | 1991 32nd Av | kitchen and bath remodel. new lighting for living room, bedrooms, and bath. new fridge, dishwasher, and cabinets. all remodel works are within original area. no partition wall be removed or relocated. (lighting in kitchen per cec 150k)Details
kitchen and bath remodel. new lighting for living room, bedrooms, and bath. new fridge, dishwasher, and cabinets. all remodel works are within original area. no partition wall be removed or relocated. (lighting in kitchen per cec 150k) | $35,000 |
| Feb 21, 2017 | Completed final sign-off Mar 2018 | 1490 45th Av | kitchen & bathroom remodel. remove & replace sheetrock.Details
kitchen & bathroom remodel. remove & replace sheetrock. | $50,000 |
| Aug 8, 2016 | Completed final sign-off Dec 2016 | 610 Rivera St | remodel kitchen: new tile, new wood floor, appliance layout moving, replace (e) window in rear of house (2) window not visible from streetDetails
remodel kitchen: new tile, new wood floor, appliance layout moving, replace (e) window in rear of house (2) window not visible from street | $20,000 |
| Apr 27, 2016 | Completed final sign-off May 2016 | 1728 Ortega St | omitting kitchen work on original pa#201505277304-s1, no kitchen remodel on 2/f.Details
omitting kitchen work on original pa#201505277304-s1, no kitchen remodel on 2/f. |