Kinetic Construction
- Based in
- Daly City
- On San Francisco permits
- Sep 2003 to May 2026
- Last 24 months
- 1 permit filed
83 permits since 2000: 76 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
16 stairs permits: 15 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 63 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2020 | Completed final sign-off Feb 2020 | 1393 32nd Av | repair dryrot wood members of the staircase (non street facing) as per notice of violation 202014341 and less than 50 % repair required.Details
repair dryrot wood members of the staircase (non street facing) as per notice of violation 202014341 and less than 50 % repair required. | $1,300 |
| Dec 30, 2019 | Completed final sign-off Feb 2020 | 95 Farallones St | install hardie plank lap siding at back of house. not visible from street, all work repair in-kind. minor repair of rot wood at rear stair (less than 10%)Details
install hardie plank lap siding at back of house. not visible from street, all work repair in-kind. minor repair of rot wood at rear stair (less than 10%) | $6,800 |
| Feb 15, 2018 | Completed final sign-off Jul 2018 | 227 Foerster St | new spiral stair, remove existing stair, replace door with window at kitchenDetails
new spiral stair, remove existing stair, replace door with window at kitchen | $15,000 |
| May 11, 2016 | Completed final sign-off Nov 2017 | 1369 16th Av | 1)add 2 bedrooms & bathroom to unit 1369 at ground floor. 2)to build a spiral stair from unit 1369 at 2nd floor to the ground floor to establish floor connection.Details
1)add 2 bedrooms & bathroom to unit 1369 at ground floor. 2)to build a spiral stair from unit 1369 at 2nd floor to the ground floor to establish floor connection. | $15,000 |
| Jan 6, 2016 | Completed final sign-off Feb 2016 | 3427 Jennings St | install stair lift at interior stairway. replace shower valve & re-tile interior of the shower stall at top floor bathroom. replact two windows with vinly double pane glass (facing back of the house).Details
install stair lift at interior stairway. replace shower valve & re-tile interior of the shower stall at top floor bathroom. replact two windows with vinly double pane glass (facing back of the house). | $9,200 |
| Aug 25, 2015 | Completed final sign-off Dec 2015 | 2231 Rivera St | comply with nov 201560861 restore front gate, add wall & wood door at entry infill roof opening above staircase & add a skylight.Details
comply with nov 201560861 restore front gate, add wall & wood door at entry infill roof opening above staircase & add a skylight. | $2,500 |
| Aug 4, 2015 | Completed final sign-off Nov 2015 | 827 Grafton Av | replace 3 front windows with wood windows in kind. interior addition of railings to stair,grab bar and replacement of shower door, replace floor tileDetails
replace 3 front windows with wood windows in kind. interior addition of railings to stair,grab bar and replacement of shower door, replace floor tile | $4,300 |
| Jun 7, 2010 | Completed final sign-off Jun 2011 | 1855 Geneva Av | to comply with nov#s 200860445, 200861177. reomove illegal unit, remove basement rooms, reloca. water heater, garage ceiling drywall, new interior stair from first/garage fl to 2nd floor above, new furnace, repair bottom of stair/ rotted woodDetails
to comply with nov#s 200860445, 200861177. reomove illegal unit, remove basement rooms, reloca. water heater, garage ceiling drywall, new interior stair from first/garage fl to 2nd floor above, new furnace, repair bottom of stair/ rotted wood | $20,000 |
| May 28, 2010 | Completed final sign-off Jul 2010 | 38 West View Av | house front wall dry rot & stucco repair, area less than 200 ft stair supporting framing repair (less than 50%) repair in kind, no structural changesDetails
house front wall dry rot & stucco repair, area less than 200 ft stair supporting framing repair (less than 50%) repair in kind, no structural changes | $5,700 |
| Nov 4, 2009 | Completed final sign-off Jan 2010 | 1239 Gilman Av | front stair & deck rebuild in-kind. same size.Details
front stair & deck rebuild in-kind. same size. | $9,600 |
| Jun 2, 2009 | Completed final sign-off Aug 2009 | 321 San Benito Wy | house front windows repair & replace in kind total (6). rear windows replace with new white vinyl, duel glass total (13). stucco & rot repair. porch stair landing concrete slab & garage slab (portion) replace. 1/2" plywood panel installation @ garage , craul space.Details
house front windows repair & replace in kind total (6). rear windows replace with new white vinyl, duel glass total (13). stucco & rot repair. porch stair landing concrete slab & garage slab (portion) replace. 1/2" plywood panel installation @ garage , craul space. | $24,000 |
| Mar 5, 2007 | Expired or cancelled expired Oct 2009 | 3440 Jennings St | rear stair rebuild/repair, bathroom remodel, garage door replace, garbage disposal replace, carpet replace and hw floor refinish.Details
rear stair rebuild/repair, bathroom remodel, garage door replace, garbage disposal replace, carpet replace and hw floor refinish. | $24,000 |
| Nov 6, 2006 | Completed final sign-off Apr 2007 | 670 Thornton Av | front stair rot repair, reroof, replace kitchen cabinet and fixture, garage ceiling dry wall. less than 50% of front stairs.Details
front stair rot repair, reroof, replace kitchen cabinet and fixture, garage ceiling dry wall. less than 50% of front stairs. | $38,000 |
| Jan 23, 2006 | Completed final sign-off Mar 2006 | 47 Maddux Av | replace vanity,kitchen cabinet,reroof,stairway,step repair,replace garage door,garage drywall ceiling,furnace,doors & 2 rear windows.new front stair iron handrail v-valve=0.67Details
replace vanity,kitchen cabinet,reroof,stairway,step repair,replace garage door,garage drywall ceiling,furnace,doors & 2 rear windows.new front stair iron handrail v-valve=0.67 | $8,200 |
| Feb 11, 2004 | Completed final sign-off Apr 2004 | 714 London St | rebuild (e) back stair (in-kind) replace garage entry door with 20 minute door. install sheetrock toDetails
rebuild (e) back stair (in-kind) replace garage entry door with 20 minute door. install sheetrock to | $7,600 |
| Sep 9, 2003 | Completed final sign-off Sep 2003 | 2604 Bryant St | to repair rotted landing boards, treads & risers for the front entrance (e) wood stairway w/pt wood.Details
to repair rotted landing boards, treads & risers for the front entrance (e) wood stairway w/pt wood. | $1,800 |