Back to bathroom remodel contractors
Kinetic Construction
- Based in
- Daly City
- On San Francisco permits
- Sep 2003 to May 2026
- Last 24 months
- 1 permit filed
83 permits since 2000: 76 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 19 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2026 | In progress issued May 2026 | 950 Cabrillo St | unit 11: kitchen remodel, cabinets and counter tops, new washer and dryer replacement like for like same area, bathroom remodel, replace bath tub to tub, replace wall tiles, shower valves, vanity sink, toilet.Details
unit 11: kitchen remodel, cabinets and counter tops, new washer and dryer replacement like for like same area, bathroom remodel, replace bath tub to tub, replace wall tiles, shower valves, vanity sink, toilet. | $12,000 |
| Apr 10, 2019 | Completed final sign-off May 2019 | 3080 Alemany Bl | bathroom fixtures replace bathtub, sink and toilet replace. no removal or modification of walls. size 5'x8' = 40 sq ft.Details
bathroom fixtures replace bathtub, sink and toilet replace. no removal or modification of walls. size 5'x8' = 40 sq ft. | $14,490 |
| Jul 17, 2018 | Completed final sign-off Sep 2018 | 1334 Sunnydale Av | remodel kitchen & bathroom: new kitchen cabinets & countertops; new bathroom fixtures and wall tile replacment and in shower area. (n) electrical alservice, no floor & wall tile in kitchen.Details
remodel kitchen & bathroom: new kitchen cabinets & countertops; new bathroom fixtures and wall tile replacment and in shower area. (n) electrical alservice, no floor & wall tile in kitchen. | $16,880 |
| Jul 29, 2016 | Completed final sign-off Mar 2017 | 1647 38th Av | add bedroom, full bath on grnd flr. relocate (e) dryer and washer.Details
add bedroom, full bath on grnd flr. relocate (e) dryer and washer. | $50,000 |
| May 11, 2016 | Completed final sign-off Nov 2017 | 1369 16th Av | 1)add 2 bedrooms & bathroom to unit 1369 at ground floor. 2)to build a spiral stair from unit 1369 at 2nd floor to the ground floor to establish floor connection.Details
1)add 2 bedrooms & bathroom to unit 1369 at ground floor. 2)to build a spiral stair from unit 1369 at 2nd floor to the ground floor to establish floor connection. | $15,000 |
| Jan 6, 2016 | Completed final sign-off Feb 2016 | 3427 Jennings St | install stair lift at interior stairway. replace shower valve & re-tile interior of the shower stall at top floor bathroom. replact two windows with vinly double pane glass (facing back of the house).Details
install stair lift at interior stairway. replace shower valve & re-tile interior of the shower stall at top floor bathroom. replact two windows with vinly double pane glass (facing back of the house). | $9,200 |
| Sep 4, 2015 | Completed final sign-off Nov 2015 | 1801 41st Av | replace bathroom fixtures, new floor tile, paint, kitchen cabiet & fixture replace.Details
replace bathroom fixtures, new floor tile, paint, kitchen cabiet & fixture replace. | $8,200 |
| Aug 25, 2015 | Completed final sign-off Dec 2015 | 2231 Rivera St | legalize a full bath on 2nd floorDetails
legalize a full bath on 2nd floor | $5,000 |
| Apr 8, 2014 | Completed final sign-off Jun 2014 | 735 Rivera St | ground floor bathroom rebuildDetails
ground floor bathroom rebuild | $4,800 |
| Aug 6, 2013 | Completed final sign-off Nov 2013 | 1582 Quesada Av | g/f bathroom re-build; remove sink in (e) g/f room; garage ceiling to add insulation and drywall; replace metal front gate; re-roofing-modified bitumen finishes; install new hood for kitchen. re-wiring the whole house. to comply with cec 150(k)8 & 10; replace one window u factor not > 0.32.Details
g/f bathroom re-build; remove sink in (e) g/f room; garage ceiling to add insulation and drywall; replace metal front gate; re-roofing-modified bitumen finishes; install new hood for kitchen. re-wiring the whole house. to comply with cec 150(k)8 & 10; replace one window u factor not > 0.32. | $28,400 |
| Feb 5, 2013 | Completed final sign-off May 2013 | 110 Scotia Av | 4 windows replace same size, garage door replace, front metal gate, add screen and replace lock, garage ceiling add insulation and drywall. bath vanity and sink replace. wood-clad windows in front, vinyl on side.Details
4 windows replace same size, garage door replace, front metal gate, add screen and replace lock, garage ceiling add insulation and drywall. bath vanity and sink replace. wood-clad windows in front, vinyl on side. | $7,600 |
| Dec 31, 2012 | Completed final sign-off Mar 2013 | 611 San Jose Av | kitchen cabinets, countertop and flooring, bath remodel except bathtub, furnace and duct replacement. connect to existing flueDetails
kitchen cabinets, countertop and flooring, bath remodel except bathtub, furnace and duct replacement. connect to existing flue | $18,000 |
| Aug 31, 2012 | Completed final sign-off Nov 2012 | 67 Scotia Av | bath tile and fixture replace, kitchen cabinet and counter top replace, electrical re-wiring, water line replace with copper, furnace replace at same location in garage.Details
bath tile and fixture replace, kitchen cabinet and counter top replace, electrical re-wiring, water line replace with copper, furnace replace at same location in garage. | $12,400 |
| May 26, 2010 | Completed final sign-off Oct 2010 | 266 Ottawa Av | furnace and air duct replace garage ceiling drywall, bathroom refinishes. kitchen rough in only. no lighting work. furnace located in garage. raise 18" affDetails
furnace and air duct replace garage ceiling drywall, bathroom refinishes. kitchen rough in only. no lighting work. furnace located in garage. raise 18" aff | $9,400 |
| May 26, 2010 | Completed final sign-off Sep 2010 | 355 Tara St | master bathroom remodel, reroof kitchen only. garage concrete slab replace, basement ceiling drywall. provide high efficacy lights. manual on occupancy sensor in bathroom.Details
master bathroom remodel, reroof kitchen only. garage concrete slab replace, basement ceiling drywall. provide high efficacy lights. manual on occupancy sensor in bathroom. | $7,000 |
| Mar 7, 2008 | Completed final sign-off Nov 2008 | 339 Vienna St | kitchen & bathroom remodel, change front windows, install new entry, new deck, repair roof, rewire house & garage, remove asbestos, repair existing wood siding. new windows u-value 0.67 or less.Details
kitchen & bathroom remodel, change front windows, install new entry, new deck, repair roof, rewire house & garage, remove asbestos, repair existing wood siding. new windows u-value 0.67 or less. | $40,000 |
| Jan 15, 2008 | Completed final sign-off Mar 2008 | 1378 Oakdale Av | repair 2 bathrooms waste pipe leak repair. & replace fixtures, vanities & sinks. garage door re-install. replace kitchen counter top. no (n) lighting.Details
repair 2 bathrooms waste pipe leak repair. & replace fixtures, vanities & sinks. garage door re-install. replace kitchen counter top. no (n) lighting. | $8,400 |
| Mar 5, 2007 | Expired or cancelled expired Oct 2009 | 3440 Jennings St | rear stair rebuild/repair, bathroom remodel, garage door replace, garbage disposal replace, carpet replace and hw floor refinish.Details
rear stair rebuild/repair, bathroom remodel, garage door replace, garbage disposal replace, carpet replace and hw floor refinish. | $24,000 |
| Nov 6, 2006 | Expired or cancelled expired Jan 2008 | 1241 Shafter Av | replace kitchen cabinet & fixtures, remodel bath, reroof, garage ceiling drywall, sewer repair @ driveway.Details
replace kitchen cabinet & fixtures, remodel bath, reroof, garage ceiling drywall, sewer repair @ driveway. | $46,000 |
| Oct 20, 2006 | Completed final sign-off Aug 2007 | 126 Ward St | replace 2 front & 4 rear windows, driveway concrete repour 8'x12',replace interior & exterior door in rear,replace kitchen cabinets.remodel bath.replace fixture and re-finish,re-carpet & rear wall repair for dry rot.drywall for garage ceiling.min.50% of kitchen light wattage must be floursecent.Details
replace 2 front & 4 rear windows, driveway concrete repour 8'x12',replace interior & exterior door in rear,replace kitchen cabinets.remodel bath.replace fixture and re-finish,re-carpet & rear wall repair for dry rot.drywall for garage ceiling.min.50% of kitchen light wattage must be floursecent. | $58,000 |
| May 4, 2006 | Completed final sign-off Jun 2006 | 101 Cleo Rand Av | kitchen cabinet replace with owner provided cabinets. bath rooms remodel. door jam repair. window repair, deck siding repair and guardrail repair (less than 50% repair)Details
kitchen cabinet replace with owner provided cabinets. bath rooms remodel. door jam repair. window repair, deck siding repair and guardrail repair (less than 50% repair) | $10,500 |
| Sep 21, 2004 | Completed final sign-off Dec 2004 | 2562 San Jose Av | bathroom remodel, electrical services, panel replacement, interior doorway widen, railing, improvemeDetails
bathroom remodel, electrical services, panel replacement, interior doorway widen, railing, improveme | $8,600 |