Back to kitchen remodel contractors
Kinetic Construction
- Based in
- Daly City
- On San Francisco permits
- Sep 2003 to May 2026
- Last 24 months
- 1 permit filed
83 permits since 2000: 76 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 21 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2026 | In progress issued May 2026 | 950 Cabrillo St | unit 11: kitchen remodel, cabinets and counter tops, new washer and dryer replacement like for like same area, bathroom remodel, replace bath tub to tub, replace wall tiles, shower valves, vanity sink, toilet.Details
unit 11: kitchen remodel, cabinets and counter tops, new washer and dryer replacement like for like same area, bathroom remodel, replace bath tub to tub, replace wall tiles, shower valves, vanity sink, toilet. | $12,000 |
| Jul 17, 2018 | Completed final sign-off Sep 2018 | 1334 Sunnydale Av | remodel kitchen & bathroom: new kitchen cabinets & countertops; new bathroom fixtures and wall tile replacment and in shower area. (n) electrical alservice, no floor & wall tile in kitchen.Details
remodel kitchen & bathroom: new kitchen cabinets & countertops; new bathroom fixtures and wall tile replacment and in shower area. (n) electrical alservice, no floor & wall tile in kitchen. | $16,880 |
| Feb 15, 2018 | Completed final sign-off Jul 2018 | 227 Foerster St | new spiral stair, remove existing stair, replace door with window at kitchenDetails
new spiral stair, remove existing stair, replace door with window at kitchen | $15,000 |
| Jan 22, 2018 | Completed final sign-off May 2018 | 24 Progress St | partial kitchen remodeling replace kitchen cabinets and replace garage door.replacement at same opening no change in wall & opening layoutDetails
partial kitchen remodeling replace kitchen cabinets and replace garage door.replacement at same opening no change in wall & opening layout | $8,600 |
| Aug 29, 2016 | Never finaled issued Aug 2016, no final | 122 Monterey Bl | revision to permit 201606149950 - shorten wall between existing kitchen and living room. add new floor beams & hardware at the location.Details
revision to permit 201606149950 - shorten wall between existing kitchen and living room. add new floor beams & hardware at the location. | $10,000 |
| Apr 5, 2016 | Completed final sign-off May 2016 | 2231 Rivera St | replace main floor kitchen cabinet and countertopDetails
replace main floor kitchen cabinet and countertop | $6,400 |
| Jan 6, 2016 | Completed final sign-off Mar 2016 | 78 Scotia Av | replace all existing iron water pipe with copper. replace kitchen cabinets & fixtures with new and remain the same fixture location. insulate garage ceioing and install 5/8" drywall to ceiling & wallDetails
replace all existing iron water pipe with copper. replace kitchen cabinets & fixtures with new and remain the same fixture location. insulate garage ceioing and install 5/8" drywall to ceiling & wall | $16,000 |
| Sep 4, 2015 | Completed final sign-off Nov 2015 | 1801 41st Av | replace bathroom fixtures, new floor tile, paint, kitchen cabiet & fixture replace.Details
replace bathroom fixtures, new floor tile, paint, kitchen cabiet & fixture replace. | $8,200 |
| Nov 1, 2013 | Completed final sign-off Jan 2014 | 2274 33rd Av | remove wall between kitchen and dining room per plan, kitchen remodel, furnace replacement, exterior wall: blow in insulation.Details
remove wall between kitchen and dining room per plan, kitchen remodel, furnace replacement, exterior wall: blow in insulation. | $11,693 |
| Aug 6, 2013 | Completed final sign-off Nov 2013 | 1582 Quesada Av | g/f bathroom re-build; remove sink in (e) g/f room; garage ceiling to add insulation and drywall; replace metal front gate; re-roofing-modified bitumen finishes; install new hood for kitchen. re-wiring the whole house. to comply with cec 150(k)8 & 10; replace one window u factor not > 0.32.Details
g/f bathroom re-build; remove sink in (e) g/f room; garage ceiling to add insulation and drywall; replace metal front gate; re-roofing-modified bitumen finishes; install new hood for kitchen. re-wiring the whole house. to comply with cec 150(k)8 & 10; replace one window u factor not > 0.32. | $28,400 |
| Dec 31, 2012 | Completed final sign-off Mar 2013 | 611 San Jose Av | kitchen cabinets, countertop and flooring, bath remodel except bathtub, furnace and duct replacement. connect to existing flueDetails
kitchen cabinets, countertop and flooring, bath remodel except bathtub, furnace and duct replacement. connect to existing flue | $18,000 |
| Aug 31, 2012 | Completed final sign-off Nov 2012 | 67 Scotia Av | bath tile and fixture replace, kitchen cabinet and counter top replace, electrical re-wiring, water line replace with copper, furnace replace at same location in garage.Details
bath tile and fixture replace, kitchen cabinet and counter top replace, electrical re-wiring, water line replace with copper, furnace replace at same location in garage. | $12,400 |
| May 26, 2010 | Completed final sign-off Oct 2010 | 266 Ottawa Av | furnace and air duct replace garage ceiling drywall, bathroom refinishes. kitchen rough in only. no lighting work. furnace located in garage. raise 18" affDetails
furnace and air duct replace garage ceiling drywall, bathroom refinishes. kitchen rough in only. no lighting work. furnace located in garage. raise 18" aff | $9,400 |
| May 26, 2010 | Completed final sign-off Sep 2010 | 355 Tara St | master bathroom remodel, reroof kitchen only. garage concrete slab replace, basement ceiling drywall. provide high efficacy lights. manual on occupancy sensor in bathroom.Details
master bathroom remodel, reroof kitchen only. garage concrete slab replace, basement ceiling drywall. provide high efficacy lights. manual on occupancy sensor in bathroom. | $7,000 |
| Aug 24, 2009 | Completed final sign-off Sep 2009 | 267 Madrid St | kitchen cabinets, repalcement, back wall re-siding (hardie plans). not visible from street area + 10'x13'. no structural work. no lighting.Details
kitchen cabinets, repalcement, back wall re-siding (hardie plans). not visible from street area + 10'x13'. no structural work. no lighting. | $6,400 |
| Mar 7, 2008 | Completed final sign-off Nov 2008 | 339 Vienna St | kitchen & bathroom remodel, change front windows, install new entry, new deck, repair roof, rewire house & garage, remove asbestos, repair existing wood siding. new windows u-value 0.67 or less.Details
kitchen & bathroom remodel, change front windows, install new entry, new deck, repair roof, rewire house & garage, remove asbestos, repair existing wood siding. new windows u-value 0.67 or less. | $40,000 |
| Jan 15, 2008 | Completed final sign-off Mar 2008 | 1378 Oakdale Av | repair 2 bathrooms waste pipe leak repair. & replace fixtures, vanities & sinks. garage door re-install. replace kitchen counter top. no (n) lighting.Details
repair 2 bathrooms waste pipe leak repair. & replace fixtures, vanities & sinks. garage door re-install. replace kitchen counter top. no (n) lighting. | $8,400 |
| Nov 6, 2006 | Expired or cancelled expired Jan 2008 | 1241 Shafter Av | replace kitchen cabinet & fixtures, remodel bath, reroof, garage ceiling drywall, sewer repair @ driveway.Details
replace kitchen cabinet & fixtures, remodel bath, reroof, garage ceiling drywall, sewer repair @ driveway. | $46,000 |
| Nov 6, 2006 | Completed final sign-off Apr 2007 | 670 Thornton Av | front stair rot repair, reroof, replace kitchen cabinet and fixture, garage ceiling dry wall. less than 50% of front stairs.Details
front stair rot repair, reroof, replace kitchen cabinet and fixture, garage ceiling dry wall. less than 50% of front stairs. | $38,000 |
| Oct 20, 2006 | Completed final sign-off Aug 2007 | 126 Ward St | replace 2 front & 4 rear windows, driveway concrete repour 8'x12',replace interior & exterior door in rear,replace kitchen cabinets.remodel bath.replace fixture and re-finish,re-carpet & rear wall repair for dry rot.drywall for garage ceiling.min.50% of kitchen light wattage must be floursecent.Details
replace 2 front & 4 rear windows, driveway concrete repour 8'x12',replace interior & exterior door in rear,replace kitchen cabinets.remodel bath.replace fixture and re-finish,re-carpet & rear wall repair for dry rot.drywall for garage ceiling.min.50% of kitchen light wattage must be floursecent. | $58,000 |
| May 4, 2006 | Completed final sign-off Jun 2006 | 101 Cleo Rand Av | kitchen cabinet replace with owner provided cabinets. bath rooms remodel. door jam repair. window repair, deck siding repair and guardrail repair (less than 50% repair)Details
kitchen cabinet replace with owner provided cabinets. bath rooms remodel. door jam repair. window repair, deck siding repair and guardrail repair (less than 50% repair) | $10,500 |
| Jan 23, 2006 | Completed final sign-off Mar 2006 | 47 Maddux Av | replace vanity,kitchen cabinet,reroof,stairway,step repair,replace garage door,garage drywall ceiling,furnace,doors & 2 rear windows.new front stair iron handrail v-valve=0.67Details
replace vanity,kitchen cabinet,reroof,stairway,step repair,replace garage door,garage drywall ceiling,furnace,doors & 2 rear windows.new front stair iron handrail v-valve=0.67 | $8,200 |
| Jun 15, 2005 | Completed final sign-off Dec 2005 | 29 Montcalm St | to build an additional dwelling unit by converting the basement laundry into a kitchen & making aDetails
to build an additional dwelling unit by converting the basement laundry into a kitchen & making a | $3,200 |
| May 3, 2005 | Completed final sign-off Aug 2005 | 420 Elmira St | garage drywall ceiling w instulation, skylights, leak repair, range hood, kitchen cabinet, cntrtopDetails
garage drywall ceiling w instulation, skylights, leak repair, range hood, kitchen cabinet, cntrtop | $8,600 |