Kin Fai Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Nov 2014
- Last 24 months
- 0 permits filed
26 permits since 2000: 19 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 expired or cancelled. Typically 120 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2013 | Expired or cancelled cancelled Nov 2016 | 200 04th Av | remove extg un permitted railings at roof top. to comply with nov #201268561. repair deteriorated stairs on item 2 of #201268561Details
remove extg un permitted railings at roof top. to comply with nov #201268561. repair deteriorated stairs on item 2 of #201268561 | $2,000 |