Back to bathroom remodel contractors
Kin Fai Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Nov 2014
- Last 24 months
- 0 permits filed
26 permits since 2000: 19 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 12 completed, 3 never finaled. Typically 5 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2013 | Completed final sign-off Jan 2014 | 914 Greenwich St | kitchen replace wiring, replace stucco with gypsum, repl cabinets, repl appliances, repl sink & faucet and tiles. bathroom: repl tiles, sink & faucet, toilet, shower fixture, & cement boardDetails
kitchen replace wiring, replace stucco with gypsum, repl cabinets, repl appliances, repl sink & faucet and tiles. bathroom: repl tiles, sink & faucet, toilet, shower fixture, & cement board | $23,000 |
| Apr 26, 2013 | Never finaled issued Aug 2013, no final | 1651 Oak St | interior remodel of 2nd fl & 3rd fl. add bedrooms & bathrooms on ground fl. replace foundation, fully seismic upgrade. new sprinkler system and fa system for the entire building will be provided under separate permits.Details
interior remodel of 2nd fl & 3rd fl. add bedrooms & bathrooms on ground fl. replace foundation, fully seismic upgrade. new sprinkler system and fa system for the entire building will be provided under separate permits. | $300,000 |
| Mar 27, 2013 | Completed final sign-off Jun 2013 | 3158 Mission St | interior renovation: unit 2 add one bedroom, one bath and relocate kitchen.Details
interior renovation: unit 2 add one bedroom, one bath and relocate kitchen. | $5,000 |
| Mar 27, 2013 | Completed final sign-off Aug 2013 | 167 Fair Oaks St | interior remodel at unit # 1. add a bathroom and study room.Details
interior remodel at unit # 1. add a bathroom and study room. | $5,000 |
| Feb 12, 2013 | Completed final sign-off May 2013 | 2332 Fulton St | remodel (e) bathroom, convert existing closet into new bathroom, add new window @ existing family room.Details
remodel (e) bathroom, convert existing closet into new bathroom, add new window @ existing family room. | $5,000 |
| Jan 7, 2013 | Completed final sign-off Apr 2013 | 3735 Anza St | unit #3-interior remodel-kitchen remodel, add new living room between (e) bedrooms. add new study at 9e) kitchen. add new bathroomDetails
unit #3-interior remodel-kitchen remodel, add new living room between (e) bedrooms. add new study at 9e) kitchen. add new bathroom | $20,000 |
| Jul 19, 2012 | Completed final sign-off Nov 2012 | 1086 Post St | unit #316-interior remodel-relocate & remodel (e) kitchen, relocate & remodel bathroom. add new bedroom in (e) living roomDetails
unit #316-interior remodel-relocate & remodel (e) kitchen, relocate & remodel bathroom. add new bedroom in (e) living room | $5,000 |
| May 1, 2012 | Completed final sign-off Aug 2012 | 1086 Post St | unit 304, 3rd floor interior remodel. remodel existing kitchen, relocate existing bath, add new bedroom, and study in e living room area.Details
unit 304, 3rd floor interior remodel. remodel existing kitchen, relocate existing bath, add new bedroom, and study in e living room area. | $13,000 |
| Nov 23, 2011 | Completed final sign-off Jul 2012 | 7 Leroy Pl | interior remodel-relocate (e) kitchen to (e) living room, convert (e) kitchen into office, convert (e) dining room into bedroom. convert (e) family room into study room. add new bedroom & bathroom in (e) living room, enlarge (e) bathroom & closet in master bedroomDetails
interior remodel-relocate (e) kitchen to (e) living room, convert (e) kitchen into office, convert (e) dining room into bedroom. convert (e) family room into study room. add new bedroom & bathroom in (e) living room, enlarge (e) bathroom & closet in master bedroom | $5,000 |
| Sep 6, 2011 | Never finaled issued Sep 2011, no final | 7 Leroy Pl | unit #9 leroy pl-comply with nov# 201190066-revision to pa# 2011-0422-4649-includes remodeling of 1 full bathroom. bathroom remodel shown on plans, but for documentation purposed, description added to scope of work.Details
unit #9 leroy pl-comply with nov# 201190066-revision to pa# 2011-0422-4649-includes remodeling of 1 full bathroom. bathroom remodel shown on plans, but for documentation purposed, description added to scope of work. | |
| Apr 22, 2011 | Completed final sign-off Sep 2011 | 9 Leroy Pl | comply with nov# 201190066-convert (e) pantry into half bathroom & build partition for a dent. remodel kitchen.Details
comply with nov# 201190066-convert (e) pantry into half bathroom & build partition for a dent. remodel kitchen. | $3,000 |
| Feb 7, 2011 | Completed final sign-off Aug 2011 | 965 Dolores St | replace 6 wood windows at front & 17 vinyl windows at side/rear in-kind. remove plaster/lath and provide voluntary structural strengthening & new 5/8" type x gyp. bd. throughout at 3rd floor only. convert 1 1/2 to 2 full baths & remove kitchen work done on 3rd floor unit #965 only.Details
replace 6 wood windows at front & 17 vinyl windows at side/rear in-kind. remove plaster/lath and provide voluntary structural strengthening & new 5/8" type x gyp. bd. throughout at 3rd floor only. convert 1 1/2 to 2 full baths & remove kitchen work done on 3rd floor unit #965 only. | $30,000 |
| Dec 27, 2010 | Completed final sign-off Feb 2011 | 3167 Sacramento St | ground floor unit: remodel kitchen and bathroom. replace kirchen cabs, counter top, shower and fixtures. replace 12 lighting fixtures. add r-13 insulation to outer wall and r-30 to ceiling. legalize (e) electrical heat. no window and no door work on this permit.Details
ground floor unit: remodel kitchen and bathroom. replace kirchen cabs, counter top, shower and fixtures. replace 12 lighting fixtures. add r-13 insulation to outer wall and r-30 to ceiling. legalize (e) electrical heat. no window and no door work on this permit. | $18,000 |
| Dec 3, 2010 | Completed final sign-off Feb 2011 | 200 04th Av | to comply with nov 201078406; convert one bath to two baths & remodel kitchen on second floor unit #202 only.Details
to comply with nov 201078406; convert one bath to two baths & remodel kitchen on second floor unit #202 only. | $18,000 |
| Nov 19, 2010 | Never finaled issued Nov 2010, no final | 3167 Sacramento St | remodel 1 kitchen & 1 bathroom, replace kitchen cabinets, counter top. bathroom fixtures & shower. no lighting changesDetails
remodel 1 kitchen & 1 bathroom, replace kitchen cabinets, counter top. bathroom fixtures & shower. no lighting changes | $18,000 |