Block 0073, lot 024
914 Greenwich St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 6,096 sq ft
- Lot
- 1,903 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 20, 2023 | Completed final sign-off Sep 2023 | 914 Greenwich St | Clear Windows And Clear Doors Inc | replace (4) front windows, custom wood/double hung, double pan, loe argon gas filled, og lugs, top sash, (4) lites true divided lite. replace in-kind, no structural work, same size/location. u factor 0.30Details
replace (4) front windows, custom wood/double hung, double pan, loe argon gas filled, og lugs, top sash, (4) lites true divided lite. replace in-kind, no structural work, same size/location. u factor 0.30 | $9,200 |
| Dec 9, 2013 | Completed final sign-off Jan 2014 | 914 Greenwich St | Kin Fai Construction Co. | kitchen replace wiring, replace stucco with gypsum, repl cabinets, repl appliances, repl sink & faucet and tiles. bathroom: repl tiles, sink & faucet, toilet, shower fixture, & cement boardDetails
kitchen replace wiring, replace stucco with gypsum, repl cabinets, repl appliances, repl sink & faucet and tiles. bathroom: repl tiles, sink & faucet, toilet, shower fixture, & cement board | $23,000 |
| Apr 10, 2009 | Completed final sign-off Apr 2009 | 912 Greenwich St | Artcore Construction | after foundation replacement restore existing half bath & service room. ref pa#200807116490.Details
after foundation replacement restore existing half bath & service room. ref pa#200807116490. | $15,000 |
| Oct 22, 2008 | Completed final sign-off Apr 2009 | 912 Greenwich St | Artcore Construction | dry rot repair at lightwell area & rear stairs. approx 150 sq. ft. stair rails are to conform w/4" sphere code. replace 5 basement windows. 2 breezeway windows. lightwell windows w/ new wood windows. ddry rot repair at stairs limited to post & treads only.Details
dry rot repair at lightwell area & rear stairs. approx 150 sq. ft. stair rails are to conform w/4" sphere code. replace 5 basement windows. 2 breezeway windows. lightwell windows w/ new wood windows. ddry rot repair at stairs limited to post & treads only. | $15,000 |
| Aug 13, 2008 | Completed final sign-off Apr 2009 | 912 Greenwich St | Artcore Construction | replace 11 double hung windows w/ new wood windows on wall visible from taylor street. orginal style, dual glare. on rear of bldg. replace 7 double hung windows w/ new vinyl made ones.Details
replace 11 double hung windows w/ new wood windows on wall visible from taylor street. orginal style, dual glare. on rear of bldg. replace 7 double hung windows w/ new vinyl made ones. | $11,000 |
| Jul 11, 2008 | Completed final sign-off Apr 2009 | 912 Greenwich St | Artcore Construction | replace (e) foundation (one wall) next to property line.Details
replace (e) foundation (one wall) next to property line. | $52,000 |
| Oct 3, 2007 | Never finaled issued Oct 2007, no final | 912 Greenwich St | street space permit & sidewalkDetails
street space permit & sidewalk |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Artcore Construction (4), Clear Windows And Clear Doors Inc, Kin Fai Construction Co.
- Engineers
- Gerald Lang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.