Back to kitchen remodel contractors
Kevin Webb Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Sep 2026
- Last 24 months
- 20 permits filed
160 permits since 2000: 111 completed, 7 in progress, 18 never finaled, 24 expired or cancelled.
Of the 18 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
23 kitchen remodel permits: 15 completed, 3 in progress, 2 never finaled, 3 expired or cancelled. Typically 5 days from filing to permit and 264 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 687 14th Av | in-kind remodeling of 2 kitchen(s) in 1st fl, 2nd fl need a "green tag" for electrical service equipment.Details
in-kind remodeling of 2 kitchen(s) in 1st fl, 2nd fl need a "green tag" for electrical service equipment. | $100,000 |
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 254 Carl St | convert (e) storage area at lower level to 500sf jadu per nov# 200703122, to legalize the kitchen, bahtroom, duct-work, and washer/dryer. no structural work, nor change in wall locations.Details
convert (e) storage area at lower level to 500sf jadu per nov# 200703122, to legalize the kitchen, bahtroom, duct-work, and washer/dryer. no structural work, nor change in wall locations. | $40,000 |
| Apr 9, 2026 | In progress issued Apr 2026 | 1333 Jones St | unit# 1206 12/f: partial removal of wall between living room and kitchen. new flooring, ceiling and finishes throughout. kitchen, hall, and master baths get new cabinetry, plumbing fixtures, and toilets. new appliances in kitchen. new laundry machines in hall bath. all work within unit. no work inDetails
unit# 1206 12/f: partial removal of wall between living room and kitchen. new flooring, ceiling and finishes throughout. kitchen, hall, and master baths get new cabinetry, plumbing fixtures, and toilets. new appliances in kitchen. new laundry machines in hall bath. all work within unit. no work in | $500,000 |
| Jan 17, 2025 | Completed final sign-off Jul 2026 | 687 Kansas St | restoration of an existing 3 story 2 units residence damaged by fire with minor alterations as follows: reconfigure 1st and 3rd floor kitchens, install new windows at 1st floor rear, rebuild damaged stair, reroof, replace damaged heating and water systems.Details
restoration of an existing 3 story 2 units residence damaged by fire with minor alterations as follows: reconfigure 1st and 3rd floor kitchens, install new windows at 1st floor rear, rebuild damaged stair, reroof, replace damaged heating and water systems. | $200,000 |
| Oct 12, 2022 | Never finaled issued Dec 2022, no final | 2844 Bush St | remove wall between dining room & kitchen. no other work.Details
remove wall between dining room & kitchen. no other work. | $10,000 |
| Oct 3, 2022 | Completed final sign-off Apr 2023 | 2007 Golden Gate Av | kitchen and bathroom remodel in lower unit. replace extg appliances with new. no structural work. no changes to exteriorDetails
kitchen and bathroom remodel in lower unit. replace extg appliances with new. no structural work. no changes to exterior | $80,000 |
| Aug 4, 2022 | Completed final sign-off Mar 2023 | 2007 Golden Gate Av | renovation of (e) middule unit a: renovation of one (e) kitchen & one bathroom. replace (e0 appliances with new. remove (e) fireplace (infill opening 1 hr if reqd), patch. update (e) electrical & lighting. no structural work. no changes to exterior. no changes to (e) layout.Details
renovation of (e) middule unit a: renovation of one (e) kitchen & one bathroom. replace (e0 appliances with new. remove (e) fireplace (infill opening 1 hr if reqd), patch. update (e) electrical & lighting. no structural work. no changes to exterior. no changes to (e) layout. | $130,000 |
| Dec 15, 2020 | Completed final sign-off Jun 2021 | 1831 Grant Av | remove and replace cabinets and finishes only in kitchen and bath in unit#103. remove and replace vanity and finishes in bath only in unit#203.Details
remove and replace cabinets and finishes only in kitchen and bath in unit#103. remove and replace vanity and finishes in bath only in unit#203. | $65,000 |
| May 10, 2019 | Completed final sign-off Jul 2020 | 2554 Greenwich St | general interior remodel to (e) unit #1. replace the (e) alum sliders in kind. remodel the (e) bathroom and kitchen, expanding the (e) walk in closet and replacing (e) damaged interior and deck floor finishes in kind. n/a for maher.Details
general interior remodel to (e) unit #1. replace the (e) alum sliders in kind. remodel the (e) bathroom and kitchen, expanding the (e) walk in closet and replacing (e) damaged interior and deck floor finishes in kind. n/a for maher. | $200,000 |
| Jun 21, 2018 | Completed final sign-off Mar 2019 | 1333 Jones St | #506 -remove wall between living room & kitchen, refrigerator & wall ovens to remain, replacing the cooktop and adding a wine fridge, new flooring & finishes throughout kitchen, hall, & master bath get new cabinetry, & plumbing fixtures, tub & toilet to remain in hall bath, all work in unit.Details
#506 -remove wall between living room & kitchen, refrigerator & wall ovens to remain, replacing the cooktop and adding a wine fridge, new flooring & finishes throughout kitchen, hall, & master bath get new cabinetry, & plumbing fixtures, tub & toilet to remain in hall bath, all work in unit. | $250,000 |
| Mar 13, 2018 | Completed final sign-off Feb 2020 | 1925 Gough St | unit #32: new materials in kitchen and bath, new flooring throughout, opening wall b/t kitchen and dining. all within extg walls. new kitchen appliances and washer dryer.Details
unit #32: new materials in kitchen and bath, new flooring throughout, opening wall b/t kitchen and dining. all within extg walls. new kitchen appliances and washer dryer. | $400,000 |
| Mar 13, 2017 | Completed final sign-off Mar 2018 | 350 Lexington St | remove and replace kitchen casework, in kind. remove and replace wall tiles and countertops. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remove and replace kitchen casework, in kind. remove and replace wall tiles and countertops. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $40,000 |
| Mar 1, 2017 | Completed final sign-off Nov 2018 | 2164 Hyde St | renovation of 2010 sf penthouse apartment located at corner of hyde & greenwich st. to include window replacement, terminate existing steam radiator heating & install new hydronic system, reconfigure of interior, remodel of 3 bathrooms and laundry, including (n) water shut off, kitchen remodel,Details
renovation of 2010 sf penthouse apartment located at corner of hyde & greenwich st. to include window replacement, terminate existing steam radiator heating & install new hydronic system, reconfigure of interior, remodel of 3 bathrooms and laundry, including (n) water shut off, kitchen remodel, | $500,000 |
| Feb 14, 2017 | Completed final sign-off Jun 2019 | 2263 Greenwich St | interior remodeling: kitchen, bathrooms, master bedroom, living room; replace (e) handrail/guardrail; exterior remodeling. replace (e) entry door & rear door. maher naDetails
interior remodeling: kitchen, bathrooms, master bedroom, living room; replace (e) handrail/guardrail; exterior remodeling. replace (e) entry door & rear door. maher na | $100,000 |
| Dec 14, 2016 | Expired or cancelled withdrawn Mar 2017 | 2164 Hyde St | renovation of 2010 sf penthouse aprtment located at corner of hyde and greenwich. reonvation to include window and door replacement, reconfig of interior, remodel 3 baths and laundry, new water shutoff for penthouse, kitchen remodel , general int resurfacing, new elec lightingDetails
renovation of 2010 sf penthouse aprtment located at corner of hyde and greenwich. reonvation to include window and door replacement, reconfig of interior, remodel 3 baths and laundry, new water shutoff for penthouse, kitchen remodel , general int resurfacing, new elec lighting | $500,000 |
| Nov 14, 2016 | Expired or cancelled withdrawn Mar 2017 | 2164 Hyde St | renovation of 2010 sq ft penthouse condo to include: window & door replacement, resurface (e) deck & waterproofing, interior resurfacing, new electric & lighting. reconfigure 1 bedroom, remodel 3 bathrooms, kitchen remodel and convert study to master bedroomDetails
renovation of 2010 sq ft penthouse condo to include: window & door replacement, resurface (e) deck & waterproofing, interior resurfacing, new electric & lighting. reconfigure 1 bedroom, remodel 3 bathrooms, kitchen remodel and convert study to master bedroom | $500,000 |
| Jan 12, 2016 | Completed final sign-off Aug 2016 | 1115 Greenwich St | interior remodel to include: convert library back to bedroom, expand (e) bathroom, add closet, open wall between kitchen and dining room, remove doors and enlarge opening to eliminate (e) sunroom and make part of (n) bedroom. compliance with maher ordinance no 155-13 not required.Details
interior remodel to include: convert library back to bedroom, expand (e) bathroom, add closet, open wall between kitchen and dining room, remove doors and enlarge opening to eliminate (e) sunroom and make part of (n) bedroom. compliance with maher ordinance no 155-13 not required. | $95,000 |
| Oct 21, 2014 | Completed final sign-off Feb 2015 | 2554 Greenwich St | remove and replace casework and tile in kitchen and bath. compliance with ord 155-13 not requiredDetails
remove and replace casework and tile in kitchen and bath. compliance with ord 155-13 not required | $12,000 |
| Apr 9, 2010 | Never finaled issued Dec 2010, no final | 1831 Grant Av | remodel of top flr unit in rear-2 decks created by pulling in exterior walls, no extensions or additions to building. install new windows include 3 fire rated property line windows. remove wood burning firepace & replace with gas insert. new finishes throughout, bathrooms & kitchens remain in (e)Details
remodel of top flr unit in rear-2 decks created by pulling in exterior walls, no extensions or additions to building. install new windows include 3 fire rated property line windows. remove wood burning firepace & replace with gas insert. new finishes throughout, bathrooms & kitchens remain in (e) | $150,000 |
| Feb 22, 2010 | Completed final sign-off Jun 2010 | 2111 Franklin St | unit# 5 at 3rd floor. remove and replace cabinets, counters and appliances in kitchen. no wall removal or structural work. new electrical to accomodate appliance locations. new flooring. kitchen area 8'x14'.Details
unit# 5 at 3rd floor. remove and replace cabinets, counters and appliances in kitchen. no wall removal or structural work. new electrical to accomodate appliance locations. new flooring. kitchen area 8'x14'. | $25,000 |
| Jan 27, 2010 | Completed final sign-off May 2010 | 60 Balceta Av | remove small section of walls, removing & replacing cabinets & appliances in kitchen, replacement of kitchen window, raising ceiling level, remove & replace fixtures & cabinets in downstair bathroom, not visible from streetDetails
remove small section of walls, removing & replacing cabinets & appliances in kitchen, replacement of kitchen window, raising ceiling level, remove & replace fixtures & cabinets in downstair bathroom, not visible from street | $50,000 |
| Aug 18, 2009 | Expired or cancelled expired Dec 2012 | 1831 Grant Av | unit #302: work in this unit only -minor kitchen and bath remodel, replace plumbing fixtures, repl cabinets, repair & replace dry wall as necessary to perform electrical, plumbing & insulation work, kitchen/bath lighting shall comply with residential lighting mandatory measures, no exterior work toDetails
unit #302: work in this unit only -minor kitchen and bath remodel, replace plumbing fixtures, repl cabinets, repair & replace dry wall as necessary to perform electrical, plumbing & insulation work, kitchen/bath lighting shall comply with residential lighting mandatory measures, no exterior work to | $18,000 |
| Sep 26, 2007 | Completed final sign-off Mar 2009 | 3840 Clay St | interior remodel on all three flrs and basement. lower basement flr, upgrade utilities, & perform seismic upgrade. work also includes 1 kitchen and 1 bathroom remodel on 1st. floor. two bathrm remodel & adding a bathrm on the 2nd flr. one bathroom remodel on the 3rd flr.new deck.Details
interior remodel on all three flrs and basement. lower basement flr, upgrade utilities, & perform seismic upgrade. work also includes 1 kitchen and 1 bathroom remodel on 1st. floor. two bathrm remodel & adding a bathrm on the 2nd flr. one bathroom remodel on the 3rd flr.new deck. | $480,000 |