Back to bathroom remodel contractors
Kevin Webb Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Sep 2026
- Last 24 months
- 20 permits filed
160 permits since 2000: 111 completed, 7 in progress, 18 never finaled, 24 expired or cancelled.
Of the 18 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
33 bathroom remodel permits: 22 completed, 4 in progress, 2 never finaled, 5 expired or cancelled. Typically 2 days from filing to permit and 240 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2026 | Completed final sign-off Jul 2026 | 2623 Turk Bl | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $28,192 |
| Apr 9, 2026 | In progress issued Apr 2026 | 1333 Jones St | unit# 1206 12/f: partial removal of wall between living room and kitchen. new flooring, ceiling and finishes throughout. kitchen, hall, and master baths get new cabinetry, plumbing fixtures, and toilets. new appliances in kitchen. new laundry machines in hall bath. all work within unit. no work inDetails
unit# 1206 12/f: partial removal of wall between living room and kitchen. new flooring, ceiling and finishes throughout. kitchen, hall, and master baths get new cabinetry, plumbing fixtures, and toilets. new appliances in kitchen. new laundry machines in hall bath. all work within unit. no work in | $500,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 1 06th Av | interior alterations to an existing full bath at the primary suite of a single family homeDetails
interior alterations to an existing full bath at the primary suite of a single family home | $130,000 |
| Mar 9, 2026 | In progress issued Mar 2026 | 265 Marina Bl | remodel bathroom on ground floor in kind convert bathtub into shower. infill 2 windows at rear of building and remove and replace sliding door at rear. no work is vivisble from street.Details
remodel bathroom on ground floor in kind convert bathtub into shower. infill 2 windows at rear of building and remove and replace sliding door at rear. no work is vivisble from street. | $100,000 |
| Dec 2, 2025 | In progress issued Dec 2025 | 1956 15th St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $15,000 |
| Apr 9, 2025 | Completed final sign-off Sep 2025 | 2271 California St | water damage repair. replace finished in 1 bedroom and 1 bathroom only. no structural work.Details
water damage repair. replace finished in 1 bedroom and 1 bathroom only. no structural work. | $35,000 |
| Mar 14, 2025 | Completed final sign-off Sep 2025 | 2273 California St | 3/f bathroom remodel. removal of non-bearing chase wall. removal and replacement in place toilet, bathtub/shower. addition of a tempered glass panel and door to enclose the (e) toilet. work at 2273 california only. no exterior work.Details
3/f bathroom remodel. removal of non-bearing chase wall. removal and replacement in place toilet, bathtub/shower. addition of a tempered glass panel and door to enclose the (e) toilet. work at 2273 california only. no exterior work. | $20,000 |
| Jun 27, 2023 | Completed final sign-off Mar 2024 | 1954 15th St | convert powder rm into full primary bath, replacement of 1 extg window in-kind, new millwork to serve primary bed closet, repair and expand extg ceiling cove in primary bedrm, installation of new lighting fixtures and reconfiguration of 2 extg closets.Details
convert powder rm into full primary bath, replacement of 1 extg window in-kind, new millwork to serve primary bed closet, repair and expand extg ceiling cove in primary bedrm, installation of new lighting fixtures and reconfiguration of 2 extg closets. | $60,000 |
| Apr 4, 2023 | Completed final sign-off Oct 2024 | 46 Entrada Ct | abating nov 202181771 by legalizing e below grade rooms. provide code compliant entry plus 1 hr separation from non occupied gr fl rooms and remodel e 1 bath existingDetails
abating nov 202181771 by legalizing e below grade rooms. provide code compliant entry plus 1 hr separation from non occupied gr fl rooms and remodel e 1 bath existing | $85,000 |
| Oct 3, 2022 | Completed final sign-off Apr 2023 | 2007 Golden Gate Av | kitchen and bathroom remodel in lower unit. replace extg appliances with new. no structural work. no changes to exteriorDetails
kitchen and bathroom remodel in lower unit. replace extg appliances with new. no structural work. no changes to exterior | $80,000 |
| Aug 4, 2022 | Completed final sign-off Mar 2023 | 2007 Golden Gate Av | renovation of (e) middule unit a: renovation of one (e) kitchen & one bathroom. replace (e0 appliances with new. remove (e) fireplace (infill opening 1 hr if reqd), patch. update (e) electrical & lighting. no structural work. no changes to exterior. no changes to (e) layout.Details
renovation of (e) middule unit a: renovation of one (e) kitchen & one bathroom. replace (e0 appliances with new. remove (e) fireplace (infill opening 1 hr if reqd), patch. update (e) electrical & lighting. no structural work. no changes to exterior. no changes to (e) layout. | $130,000 |
| Dec 15, 2020 | Completed final sign-off Jun 2021 | 1831 Grant Av | remove and replace cabinets and finishes only in kitchen and bath in unit#103. remove and replace vanity and finishes in bath only in unit#203.Details
remove and replace cabinets and finishes only in kitchen and bath in unit#103. remove and replace vanity and finishes in bath only in unit#203. | $65,000 |
| May 19, 2020 | Expired or cancelled cancelled Jan 2026 | 1831 Grant Av | unit 103: emergency essential repair of existing water damaged bathroom at unit 103 to remove and replace in-kind damaged bathroom fixtures, finishes and electrical.Details
unit 103: emergency essential repair of existing water damaged bathroom at unit 103 to remove and replace in-kind damaged bathroom fixtures, finishes and electrical. | $3,800 |
| Jul 23, 2019 | Completed final sign-off Sep 2020 | 1333 Jones St | unit 606 -remove walls btw liv/kit. new flooring and finishes throughout. kit, hall and master bath get new cabintry and plm fix and toilets. new appliances in kit. new laundry machines in the hall bath. all work within the unit. no work in common area, no change to egree, occ, or areaDetails
unit 606 -remove walls btw liv/kit. new flooring and finishes throughout. kit, hall and master bath get new cabintry and plm fix and toilets. new appliances in kit. new laundry machines in the hall bath. all work within the unit. no work in common area, no change to egree, occ, or area | $475,000 |
| May 10, 2019 | Completed final sign-off Jul 2020 | 2554 Greenwich St | general interior remodel to (e) unit #1. replace the (e) alum sliders in kind. remodel the (e) bathroom and kitchen, expanding the (e) walk in closet and replacing (e) damaged interior and deck floor finishes in kind. n/a for maher.Details
general interior remodel to (e) unit #1. replace the (e) alum sliders in kind. remodel the (e) bathroom and kitchen, expanding the (e) walk in closet and replacing (e) damaged interior and deck floor finishes in kind. n/a for maher. | $200,000 |
| Jun 21, 2018 | Completed final sign-off Mar 2019 | 1333 Jones St | #506 -remove wall between living room & kitchen, refrigerator & wall ovens to remain, replacing the cooktop and adding a wine fridge, new flooring & finishes throughout kitchen, hall, & master bath get new cabinetry, & plumbing fixtures, tub & toilet to remain in hall bath, all work in unit.Details
#506 -remove wall between living room & kitchen, refrigerator & wall ovens to remain, replacing the cooktop and adding a wine fridge, new flooring & finishes throughout kitchen, hall, & master bath get new cabinetry, & plumbing fixtures, tub & toilet to remain in hall bath, all work in unit. | $250,000 |
| Mar 13, 2018 | Completed final sign-off Feb 2020 | 1925 Gough St | unit #32: new materials in kitchen and bath, new flooring throughout, opening wall b/t kitchen and dining. all within extg walls. new kitchen appliances and washer dryer.Details
unit #32: new materials in kitchen and bath, new flooring throughout, opening wall b/t kitchen and dining. all within extg walls. new kitchen appliances and washer dryer. | $400,000 |
| Nov 9, 2017 | Completed final sign-off Nov 2018 | 2164 Hyde St | revision to 201703010443, remodel bathroom and laundry rm including removing 1 bathroom and new water shutoff to penthouseDetails
revision to 201703010443, remodel bathroom and laundry rm including removing 1 bathroom and new water shutoff to penthouse | $100,000 |
| Mar 1, 2017 | Completed final sign-off Nov 2018 | 2164 Hyde St | renovation of 2010 sf penthouse apartment located at corner of hyde & greenwich st. to include window replacement, terminate existing steam radiator heating & install new hydronic system, reconfigure of interior, remodel of 3 bathrooms and laundry, including (n) water shut off, kitchen remodel,Details
renovation of 2010 sf penthouse apartment located at corner of hyde & greenwich st. to include window replacement, terminate existing steam radiator heating & install new hydronic system, reconfigure of interior, remodel of 3 bathrooms and laundry, including (n) water shut off, kitchen remodel, | $500,000 |
| Feb 14, 2017 | Completed final sign-off Jun 2019 | 2263 Greenwich St | interior remodeling: kitchen, bathrooms, master bedroom, living room; replace (e) handrail/guardrail; exterior remodeling. replace (e) entry door & rear door. maher naDetails
interior remodeling: kitchen, bathrooms, master bedroom, living room; replace (e) handrail/guardrail; exterior remodeling. replace (e) entry door & rear door. maher na | $100,000 |
| Dec 14, 2016 | Expired or cancelled withdrawn Mar 2017 | 2164 Hyde St | renovation of 2010 sf penthouse aprtment located at corner of hyde and greenwich. reonvation to include window and door replacement, reconfig of interior, remodel 3 baths and laundry, new water shutoff for penthouse, kitchen remodel , general int resurfacing, new elec lightingDetails
renovation of 2010 sf penthouse aprtment located at corner of hyde and greenwich. reonvation to include window and door replacement, reconfig of interior, remodel 3 baths and laundry, new water shutoff for penthouse, kitchen remodel , general int resurfacing, new elec lighting | $500,000 |
| Nov 14, 2016 | Expired or cancelled withdrawn Mar 2017 | 2164 Hyde St | renovation of 2010 sq ft penthouse condo to include: window & door replacement, resurface (e) deck & waterproofing, interior resurfacing, new electric & lighting. reconfigure 1 bedroom, remodel 3 bathrooms, kitchen remodel and convert study to master bedroomDetails
renovation of 2010 sq ft penthouse condo to include: window & door replacement, resurface (e) deck & waterproofing, interior resurfacing, new electric & lighting. reconfigure 1 bedroom, remodel 3 bathrooms, kitchen remodel and convert study to master bedroom | $500,000 |
| Sep 29, 2016 | Completed final sign-off Apr 2017 | 118 Winfield St | interior remodel of bathroom and closet. no envelope or area changes. plumbing and electrical work included.Details
interior remodel of bathroom and closet. no envelope or area changes. plumbing and electrical work included. | $50,000 |
| Jan 12, 2016 | Completed final sign-off Aug 2016 | 1115 Greenwich St | interior remodel to include: convert library back to bedroom, expand (e) bathroom, add closet, open wall between kitchen and dining room, remove doors and enlarge opening to eliminate (e) sunroom and make part of (n) bedroom. compliance with maher ordinance no 155-13 not required.Details
interior remodel to include: convert library back to bedroom, expand (e) bathroom, add closet, open wall between kitchen and dining room, remove doors and enlarge opening to eliminate (e) sunroom and make part of (n) bedroom. compliance with maher ordinance no 155-13 not required. | $95,000 |
| Aug 13, 2015 | Completed final sign-off Mar 2018 | 474 Linden St | revision to 200703126040 and 201409095847 new construction. revised mechanical locations on roof dedk, new boiler syste, revised window mullions, revised fireplace, revised window on rear, revised bath plan unit 2, updated title 24, revised gas meter location. revised door/window schedule. zinc toDetails
revision to 200703126040 and 201409095847 new construction. revised mechanical locations on roof dedk, new boiler syste, revised window mullions, revised fireplace, revised window on rear, revised bath plan unit 2, updated title 24, revised gas meter location. revised door/window schedule. zinc to | |
| Oct 21, 2014 | Completed final sign-off Feb 2015 | 2554 Greenwich St | remove and replace casework and tile in kitchen and bath. compliance with ord 155-13 not requiredDetails
remove and replace casework and tile in kitchen and bath. compliance with ord 155-13 not required | $12,000 |
| Apr 9, 2010 | Never finaled issued Dec 2010, no final | 1831 Grant Av | remodel of top flr unit in rear-2 decks created by pulling in exterior walls, no extensions or additions to building. install new windows include 3 fire rated property line windows. remove wood burning firepace & replace with gas insert. new finishes throughout, bathrooms & kitchens remain in (e)Details
remodel of top flr unit in rear-2 decks created by pulling in exterior walls, no extensions or additions to building. install new windows include 3 fire rated property line windows. remove wood burning firepace & replace with gas insert. new finishes throughout, bathrooms & kitchens remain in (e) | $150,000 |
| Mar 16, 2010 | Never finaled issued Mar 2010, no final | 60 Balceta Av | amedment to appl. #2010/0127/5400, installation of new shower pan in bathroom downstairs.Details
amedment to appl. #2010/0127/5400, installation of new shower pan in bathroom downstairs. | |
| Jan 27, 2010 | Completed final sign-off May 2010 | 60 Balceta Av | remove small section of walls, removing & replacing cabinets & appliances in kitchen, replacement of kitchen window, raising ceiling level, remove & replace fixtures & cabinets in downstair bathroom, not visible from streetDetails
remove small section of walls, removing & replacing cabinets & appliances in kitchen, replacement of kitchen window, raising ceiling level, remove & replace fixtures & cabinets in downstair bathroom, not visible from street | $50,000 |
| Aug 18, 2009 | Expired or cancelled expired Dec 2012 | 1831 Grant Av | unit #302: work in this unit only -minor kitchen and bath remodel, replace plumbing fixtures, repl cabinets, repair & replace dry wall as necessary to perform electrical, plumbing & insulation work, kitchen/bath lighting shall comply with residential lighting mandatory measures, no exterior work toDetails
unit #302: work in this unit only -minor kitchen and bath remodel, replace plumbing fixtures, repl cabinets, repair & replace dry wall as necessary to perform electrical, plumbing & insulation work, kitchen/bath lighting shall comply with residential lighting mandatory measures, no exterior work to | $18,000 |
| May 14, 2008 | Completed final sign-off Jun 2010 | 2148 Pine St | demolish e laundry room, roof deck and stair structure at rear of house. remove e wood deck at grade.new addition to rear of house: laundry rm and study below, mster bath and roof deck above, new stair to rear yard. new deck at grade. addition approx 3' further into ex rear yard than existing.Details
demolish e laundry room, roof deck and stair structure at rear of house. remove e wood deck at grade.new addition to rear of house: laundry rm and study below, mster bath and roof deck above, new stair to rear yard. new deck at grade. addition approx 3' further into ex rear yard than existing. | $75,000 |
| Sep 26, 2007 | Completed final sign-off Mar 2009 | 3840 Clay St | interior remodel on all three flrs and basement. lower basement flr, upgrade utilities, & perform seismic upgrade. work also includes 1 kitchen and 1 bathroom remodel on 1st. floor. two bathrm remodel & adding a bathrm on the 2nd flr. one bathroom remodel on the 3rd flr.new deck.Details
interior remodel on all three flrs and basement. lower basement flr, upgrade utilities, & perform seismic upgrade. work also includes 1 kitchen and 1 bathroom remodel on 1st. floor. two bathrm remodel & adding a bathrm on the 2nd flr. one bathroom remodel on the 3rd flr.new deck. | $480,000 |
| Mar 28, 2007 | Expired or cancelled expired Oct 2008 | 219 Topaz Wy | relocate 1 kchn, remodel dining, living rooms and bath. build new half stair with landing. replace wndw,add skylightsDetails
relocate 1 kchn, remodel dining, living rooms and bath. build new half stair with landing. replace wndw,add skylights | $50,000 |