Block 0094C, lot 015
2164 Hyde St
- City’s use
- Multi-Family Residential
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 4, 2018 | Never finaled issued May 2018, no final | 2164 Hyde St | street spaceDetails
street space | ||
| Nov 9, 2017 | Completed final sign-off Nov 2018 | 2164 Hyde St | Kevin Webb Construction Inc | revision to 201703010443, remodel bathroom and laundry rm including removing 1 bathroom and new water shutoff to penthouseDetails
revision to 201703010443, remodel bathroom and laundry rm including removing 1 bathroom and new water shutoff to penthouse | $100,000 |
| Jul 13, 2017 | Never finaled issued Jul 2017, no final | 2164 Hyde St | Kevin Webb Construction Inc | street spaceDetails
street space | |
| Jun 27, 2017 | Completed final sign-off Nov 2018 | 2164 Hyde St | Kevin Webb Construction Inc | repair stucco at exterior walls damaged from water infiltration. not visible from street. approx. 300 sf.Details
repair stucco at exterior walls damaged from water infiltration. not visible from street. approx. 300 sf. | $15,000 |
| May 15, 2017 | Never finaled issued May 2017, no final | 2164 Hyde St | street spaceDetails
street space | ||
| Mar 1, 2017 | Completed final sign-off Nov 2018 | 2164 Hyde St | Kevin Webb Construction Inc | renovation of 2010 sf penthouse apartment located at corner of hyde & greenwich st. to include window replacement, terminate existing steam radiator heating & install new hydronic system, reconfigure of interior, remodel of 3 bathrooms and laundry, including (n) water shut off, kitchen remodel,Details
renovation of 2010 sf penthouse apartment located at corner of hyde & greenwich st. to include window replacement, terminate existing steam radiator heating & install new hydronic system, reconfigure of interior, remodel of 3 bathrooms and laundry, including (n) water shut off, kitchen remodel, | $500,000 |
| Dec 14, 2016 | Expired or cancelled withdrawn Mar 2017 | 2164 Hyde St | Kevin Webb Construction Inc | renovation of 2010 sf penthouse aprtment located at corner of hyde and greenwich. reonvation to include window and door replacement, reconfig of interior, remodel 3 baths and laundry, new water shutoff for penthouse, kitchen remodel , general int resurfacing, new elec lightingDetails
renovation of 2010 sf penthouse aprtment located at corner of hyde and greenwich. reonvation to include window and door replacement, reconfig of interior, remodel 3 baths and laundry, new water shutoff for penthouse, kitchen remodel , general int resurfacing, new elec lighting | $500,000 |
| Nov 14, 2016 | Expired or cancelled withdrawn Mar 2017 | 2164 Hyde St | Kevin Webb Construction Inc | renovation of 2010 sq ft penthouse condo to include: window & door replacement, resurface (e) deck & waterproofing, interior resurfacing, new electric & lighting. reconfigure 1 bedroom, remodel 3 bathrooms, kitchen remodel and convert study to master bedroomDetails
renovation of 2010 sq ft penthouse condo to include: window & door replacement, resurface (e) deck & waterproofing, interior resurfacing, new electric & lighting. reconfigure 1 bedroom, remodel 3 bathrooms, kitchen remodel and convert study to master bedroom | $500,000 |
| Sep 19, 2016 | Completed final sign-off Feb 2017 | 2164 Hyde St | Kevin Webb Construction Inc | revision to pa# 2016-08256036. change size of holdown anchor bolt in detail 6/s3.1 from 5/8" to 1/2", epoxy embedded 10". see attached engineer letter from "murphy burr curry", dated 9/15/2016.Details
revision to pa# 2016-08256036. change size of holdown anchor bolt in detail 6/s3.1 from 5/8" to 1/2", epoxy embedded 10". see attached engineer letter from "murphy burr curry", dated 9/15/2016. | |
| Aug 25, 2016 | Completed final sign-off Feb 2017 | 2164 Hyde St | Kevin Webb Construction Inc | structural work in response to non conforming construction exposed by work on 201605177595Details
structural work in response to non conforming construction exposed by work on 201605177595 | $7,500 |
| May 17, 2016 | Completed final sign-off Feb 2017 | 2164 Hyde St | Kevin Webb Construction Inc | remove and replace 18 windows at unit #816 in kind.Details
remove and replace 18 windows at unit #816 in kind. | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kevin Webb Construction Inc (9)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.