Kevin Slagle Design & Build
- Based in
- Oakland
- On San Francisco permits
- Feb 2006 to Mar 2013
- Last 24 months
- 0 permits filed
28 permits since 2000: 14 completed, 6 never finaled, 8 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 never finaled. Typically 104 days from filing to permit and 213 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 9, 2012 | Never finaled issued Aug 2012, no final | 807 Columbus Av | enlarge (e) 2nd floor unit into ground floor commercial unit, coverting 1,407 sq ft of commercial space into residental use a new interior stair will be constructed to connect floors. site permit for change in use.Details
enlarge (e) 2nd floor unit into ground floor commercial unit, coverting 1,407 sq ft of commercial space into residental use a new interior stair will be constructed to connect floors. site permit for change in use. | $140,000 |
| Jan 20, 2010 | Completed final sign-off Aug 2010 | 170 Clara St | revision to 200908054191, change location of new wood steps, new storge closet beneath e stairs, new closet adjacent to existing bathDetails
revision to 200908054191, change location of new wood steps, new storge closet beneath e stairs, new closet adjacent to existing bath |