Back to kitchen remodel contractors
Kevin Slagle Design & Build
- Based in
- Oakland
- On San Francisco permits
- Feb 2006 to Mar 2013
- Last 24 months
- 0 permits filed
28 permits since 2000: 14 completed, 6 never finaled, 8 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 1 completed, 1 never finaled, 3 expired or cancelled. Typically 3 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2013 | Completed final sign-off May 2013 | 132 Hawthorne St | add a kitchen at 2nd level. revision to pa# 201208066708Details
add a kitchen at 2nd level. revision to pa# 201208066708 | $1,000 |
| Apr 10, 2012 | Expired or cancelled expired Oct 2013 | 300 Beale St | bathroom remodel kitchen lighting replace reconfigure closets.Details
bathroom remodel kitchen lighting replace reconfigure closets. | $30,000 |
| Aug 9, 2010 | Expired or cancelled cancelled Sep 2011 | 2333 Laguna St | remodel 2 bathrooms & 1 kitchen, install new plumbign & electrical where required. high efficacy lighting ore occupancy sensor @ bathroom, at least 50% high efficacy lighting (by wattage) @ kitchen, environmental exhaust termination 3 min from pl & bldg opening.Details
remodel 2 bathrooms & 1 kitchen, install new plumbign & electrical where required. high efficacy lighting ore occupancy sensor @ bathroom, at least 50% high efficacy lighting (by wattage) @ kitchen, environmental exhaust termination 3 min from pl & bldg opening. | $40,000 |
| Jul 30, 2010 | Never finaled issued Dec 2010, no final | 54 Beachmont Dr | partial interior renovation, renovate kitchen, master bath. lower level to include full bath, bedroom, mud room/laundry, den. convert closet to powder room. replace 2 side yard windows in kind. replace sideyard and rear yard door in kindDetails
partial interior renovation, renovate kitchen, master bath. lower level to include full bath, bedroom, mud room/laundry, den. convert closet to powder room. replace 2 side yard windows in kind. replace sideyard and rear yard door in kind | $100,000 |
| Feb 2, 2009 | Expired or cancelled expired Oct 2018 | 170 Clara St | level 1: no work. level 2: add kitchen, new bedroom closet. level 3:add bedroom, bath, exterior deck.change of use from office to s.f.d., 3rd level vertical addition.Details
level 1: no work. level 2: add kitchen, new bedroom closet. level 3:add bedroom, bath, exterior deck.change of use from office to s.f.d., 3rd level vertical addition. | $40,000 |