Kevin Slagle Design & Build
- Based in
- Oakland
- On San Francisco permits
- Feb 2006 to Mar 2013
- Last 24 months
- 0 permits filed
28 permits since 2000: 14 completed, 6 never finaled, 8 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 143 days from filing to permit and 302 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2009 | Completed final sign-off Aug 2010 | 170 Clara St | revision to pa# 2007.12.31.1629. fur walls, level floor, reduce scope of deck wall. non structural work.Details
revision to pa# 2007.12.31.1629. fur walls, level floor, reduce scope of deck wall. non structural work. | $8,500 |
| Feb 2, 2009 | Expired or cancelled expired Oct 2018 | 170 Clara St | level 1: no work. level 2: add kitchen, new bedroom closet. level 3:add bedroom, bath, exterior deck.change of use from office to s.f.d., 3rd level vertical addition.Details
level 1: no work. level 2: add kitchen, new bedroom closet. level 3:add bedroom, bath, exterior deck.change of use from office to s.f.d., 3rd level vertical addition. | $40,000 |