Kenny Gong Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Mar 2026
- Last 24 months
- 3 permits filed
44 permits since 2000: 31 completed, 4 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 4 completed, 2 never finaled. Typically 48 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2024 | Completed final sign-off May 2025 | 19 Sycamore St | kitchen and bathroom remodel (update electrical) , replace drywall, repair rear stairs,in kind, less than 50%.Details
kitchen and bathroom remodel (update electrical) , replace drywall, repair rear stairs,in kind, less than 50%. | $75,000 |
| Jan 7, 2019 | Never finaled issued Jan 2019, no final | 207 Duncan St | revision to pa 2015-0717-1795 - add non-structural partition; modify existing front stairDetails
revision to pa 2015-0717-1795 - add non-structural partition; modify existing front stair | $4,000 |
| Jul 17, 2015 | Never finaled issued Dec 2016, no final | 207 Duncan St | rear yard addition & remodel: garage level; relocate interior stair, new media rm w/ half bath, remodel (e) bath. 2nd fl; relocate interior stair, new family rm, kitchen addition w/ deck, remodel (e) bed & bath.Details
rear yard addition & remodel: garage level; relocate interior stair, new media rm w/ half bath, remodel (e) bath. 2nd fl; relocate interior stair, new family rm, kitchen addition w/ deck, remodel (e) bed & bath. | $225,000 |
| Nov 25, 2014 | Completed final sign-off Jun 2018 | 1186 Pacific Av | infill 2 interior lightwells. remove 2nd egress stair. entire bldg install automatic sprinkler under separate permit. complete remodel and reconfigure layout for 2 units per plans shown. legalize study room and add a full bath on 1st flr. new stair btwn 2nd & 3rd floor. new roof deck. maher n/a.Details
infill 2 interior lightwells. remove 2nd egress stair. entire bldg install automatic sprinkler under separate permit. complete remodel and reconfigure layout for 2 units per plans shown. legalize study room and add a full bath on 1st flr. new stair btwn 2nd & 3rd floor. new roof deck. maher n/a. | $415,000 |
| Aug 3, 2012 | Completed final sign-off Nov 2013 | 2650 26th Av | interior remodel. add interior stairs. upgrade wall and roof insulation. replace non visible windows. replace wall finish. voluntary structural strengthening. replace (20) non-visible (from street) windowsDetails
interior remodel. add interior stairs. upgrade wall and roof insulation. replace non visible windows. replace wall finish. voluntary structural strengthening. replace (20) non-visible (from street) windows | $110,000 |
| May 1, 2009 | Completed final sign-off May 2009 | 827 24th Av | to comply w/ nov #200903141, replace light well stair w/ in-kind. stair is not visible from street.Details
to comply w/ nov #200903141, replace light well stair w/ in-kind. stair is not visible from street. | $3,000 |