Kenny Gong Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Mar 2026
- Last 24 months
- 3 permits filed
44 permits since 2000: 31 completed, 4 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
3 roof deck permits: 3 completed. Typically 490 days from filing to permit and 1048 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2014 | Completed final sign-off Jun 2018 | 1186 Pacific Av | infill 2 interior lightwells. remove 2nd egress stair. entire bldg install automatic sprinkler under separate permit. complete remodel and reconfigure layout for 2 units per plans shown. legalize study room and add a full bath on 1st flr. new stair btwn 2nd & 3rd floor. new roof deck. maher n/a.Details
infill 2 interior lightwells. remove 2nd egress stair. entire bldg install automatic sprinkler under separate permit. complete remodel and reconfigure layout for 2 units per plans shown. legalize study room and add a full bath on 1st flr. new stair btwn 2nd & 3rd floor. new roof deck. maher n/a. | $415,000 |
| Apr 30, 2014 | Completed final sign-off Aug 2018 | 3239 Steiner St | vertical addition. new 4th story. 1 living room, 1 kitchen, 1 dining room, (1) 1/2 bath & roof deck. total remodel of lower 3 floors.Details
vertical addition. new 4th story. 1 living room, 1 kitchen, 1 dining room, (1) 1/2 bath & roof deck. total remodel of lower 3 floors. | $80,000 |
| Mar 14, 2013 | Completed final sign-off May 2017 | 646 30th Av | 3 story back addition and legalize (e) roof deck. no change of front facade.Details
3 story back addition and legalize (e) roof deck. no change of front facade. | $180,000 |