Back to bathroom remodel contractors
Kenny Gong Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Mar 2026
- Last 24 months
- 3 permits filed
44 permits since 2000: 31 completed, 4 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 16 completed, 3 in progress, 3 never finaled, 3 expired or cancelled. Typically 6 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2026 | In progress issued Mar 2026 | 339 Winding Wy | 1/f: remodel bathroom, bedroom & family room, add bathroom, bedroom and kitchenette. 2/f: remodel bathroom & add (1) bathroom per plan.Details
1/f: remodel bathroom, bedroom & family room, add bathroom, bedroom and kitchenette. 2/f: remodel bathroom & add (1) bathroom per plan. | $110,000 |
| Nov 25, 2025 | Completed final sign-off Jan 2026 | 216 Bradford St | remodel 2 bathrooms. change tub to shower.Details
remodel 2 bathrooms. change tub to shower. | $10,000 |
| Nov 14, 2024 | Completed final sign-off May 2025 | 19 Sycamore St | kitchen and bathroom remodel (update electrical) , replace drywall, repair rear stairs,in kind, less than 50%.Details
kitchen and bathroom remodel (update electrical) , replace drywall, repair rear stairs,in kind, less than 50%. | $75,000 |
| Dec 6, 2023 | In progress issued Dec 2023 | 1351 Mason St | 2/f: apt 3 - remodel kitchen and 1 bath. add 1 bath. replace 4 windows in kind in lightwell. windows not visible from street. apt 4 - remodel kitchen and relocate 1 bath. replace 1 window in kind in lightwell. window not visible from street. no exterior/facade work.Details
2/f: apt 3 - remodel kitchen and 1 bath. add 1 bath. replace 4 windows in kind in lightwell. windows not visible from street. apt 4 - remodel kitchen and relocate 1 bath. replace 1 window in kind in lightwell. window not visible from street. no exterior/facade work. | $30,000 |
| Dec 20, 2022 | Completed final sign-off Jul 2023 | 1545 Eucalyptus Dr | kitchen & bathroom remodel, renovation of ground floor. convert (e) unwarranted rooms in the ground floor level into bedroom & family room.Details
kitchen & bathroom remodel, renovation of ground floor. convert (e) unwarranted rooms in the ground floor level into bedroom & family room. | $60,000 |
| Dec 5, 2022 | In progress issued Aug 2024 | 451 10th Av | remodel(e)2/f unit interior spaces,adding a(n)bath,extend a(n)22 sf bay window @ rear yard side to make a bedroom suite.expand(e) 2/f unit vertically to (e)g/f interior to create a 2 story unit.remodel(e)g/fspaces to include a (n)master bedroom & bath.Details
remodel(e)2/f unit interior spaces,adding a(n)bath,extend a(n)22 sf bay window @ rear yard side to make a bedroom suite.expand(e) 2/f unit vertically to (e)g/f interior to create a 2 story unit.remodel(e)g/fspaces to include a (n)master bedroom & bath. | $160,000 |
| Jun 22, 2022 | Never finaled issued Jun 2022, no final | 1351 Mason St | apt #2: remodel kitchen and 2 bathrooms. replace (10) rear and lightwell windows. replace partial drywall. no removal of wallsDetails
apt #2: remodel kitchen and 2 bathrooms. replace (10) rear and lightwell windows. replace partial drywall. no removal of walls | $25,000 |
| Apr 29, 2022 | Completed final sign-off Jun 2022 | 357 10th Av | response to complaint #202288898. remodel kitchen and partial bathroom. refurbish wall at ground floor storage room. work to be done in unit #361 at rear of lot.Details
response to complaint #202288898. remodel kitchen and partial bathroom. refurbish wall at ground floor storage room. work to be done in unit #361 at rear of lot. | $7,500 |
| Jun 29, 2021 | Completed final sign-off Oct 2021 | 221 Duncan St | remodel kitchen in kind with new cabinets and counter top. update kitchen electrical. remodel bathroom in kind with new shower, toilet, vanity and tile.Details
remodel kitchen in kind with new cabinets and counter top. update kitchen electrical. remodel bathroom in kind with new shower, toilet, vanity and tile. | $25,000 |
| Mar 11, 2021 | Completed final sign-off Jul 2022 | 818 24th Av | new adu. remodel (e) unfinished storage and laundry spaces behind garage parking to build a (n) adu unit with full kitchen, (n)living & dining, a bedroom and a bath. extend (e) building end wall further towards rear yard, to add a (n) family room and a master bedroom with bath for the (n) unit.Details
new adu. remodel (e) unfinished storage and laundry spaces behind garage parking to build a (n) adu unit with full kitchen, (n)living & dining, a bedroom and a bath. extend (e) building end wall further towards rear yard, to add a (n) family room and a master bedroom with bath for the (n) unit. | $160,000 |
| Jun 12, 2020 | Expired or cancelled expired May 2022 | 1351 Mason St | unit 8 & 12: remodel kitchen and bathroom. shower,toilet and lavatory in bathroom. sink in kitchen. all fixtures to be in kind. replace drywall with 5/8" type-x.drywall in bedroom, bathroom and kitchen. replace 1 lightwell window in each unit and not visible from street. replace/re-finish floor.Details
unit 8 & 12: remodel kitchen and bathroom. shower,toilet and lavatory in bathroom. sink in kitchen. all fixtures to be in kind. replace drywall with 5/8" type-x.drywall in bedroom, bathroom and kitchen. replace 1 lightwell window in each unit and not visible from street. replace/re-finish floor. | $40,000 |
| Feb 7, 2020 | Completed final sign-off Aug 2023 | 642 10th Av | unit #3: remodel kitchen and bathrooms. replace drywall in unit. kitchen 100 sq ft, bathrooms, 35 sq ft. unit size 700 sq ft. drywall to be 5/8" type xDetails
unit #3: remodel kitchen and bathrooms. replace drywall in unit. kitchen 100 sq ft, bathrooms, 35 sq ft. unit size 700 sq ft. drywall to be 5/8" type x | $30,000 |
| Dec 4, 2019 | Completed final sign-off Apr 2020 | 27 Pasadena St | comply w/ complaint #201927781: legalize one bedroom, one full bath room, & construct one new bedroom. all work on ground floor.Details
comply w/ complaint #201927781: legalize one bedroom, one full bath room, & construct one new bedroom. all work on ground floor. | $36,000 |
| May 20, 2019 | Completed final sign-off Nov 2019 | 1334 32nd Av | 1st flr -add 2 bedrooms, 2 full baths, 1 w.i.c, 1 meda rm. add 1 skylight. 2nd flr -kitchen and bath remodel. add 1 three-fixture bath.Details
1st flr -add 2 bedrooms, 2 full baths, 1 w.i.c, 1 meda rm. add 1 skylight. 2nd flr -kitchen and bath remodel. add 1 three-fixture bath. | $60,000 |
| Apr 27, 2017 | Expired or cancelled suspend Aug 2025 | 1351 Mason St | remodel kitchen and bath unit 1 and 5. replace cabinets, counter, tile, appliances. replace hardwood floor and paint. same location , no moving of walls windows doorsDetails
remodel kitchen and bath unit 1 and 5. replace cabinets, counter, tile, appliances. replace hardwood floor and paint. same location , no moving of walls windows doors | $40,644 |
| Apr 27, 2017 | Never finaled issued Apr 2017, no final | 1351 Mason St | remodel kitchen and bath unit 1 and 5. replace cabinets, counter, tile appliances. replace hardwood floor and paint. same location. no moving of walls, windows, doorsDetails
remodel kitchen and bath unit 1 and 5. replace cabinets, counter, tile appliances. replace hardwood floor and paint. same location. no moving of walls, windows, doors | $40,644 |
| Jul 17, 2015 | Never finaled issued Dec 2016, no final | 207 Duncan St | rear yard addition & remodel: garage level; relocate interior stair, new media rm w/ half bath, remodel (e) bath. 2nd fl; relocate interior stair, new family rm, kitchen addition w/ deck, remodel (e) bed & bath.Details
rear yard addition & remodel: garage level; relocate interior stair, new media rm w/ half bath, remodel (e) bath. 2nd fl; relocate interior stair, new family rm, kitchen addition w/ deck, remodel (e) bed & bath. | $225,000 |
| Nov 25, 2014 | Completed final sign-off Jun 2018 | 1186 Pacific Av | infill 2 interior lightwells. remove 2nd egress stair. entire bldg install automatic sprinkler under separate permit. complete remodel and reconfigure layout for 2 units per plans shown. legalize study room and add a full bath on 1st flr. new stair btwn 2nd & 3rd floor. new roof deck. maher n/a.Details
infill 2 interior lightwells. remove 2nd egress stair. entire bldg install automatic sprinkler under separate permit. complete remodel and reconfigure layout for 2 units per plans shown. legalize study room and add a full bath on 1st flr. new stair btwn 2nd & 3rd floor. new roof deck. maher n/a. | $415,000 |
| Aug 26, 2014 | Completed final sign-off Oct 2014 | 1214 34th Av | remodel bathroom w/shower pan.Details
remodel bathroom w/shower pan. | $4,000 |
| Apr 30, 2014 | Completed final sign-off Aug 2018 | 3239 Steiner St | vertical addition. new 4th story. 1 living room, 1 kitchen, 1 dining room, (1) 1/2 bath & roof deck. total remodel of lower 3 floors.Details
vertical addition. new 4th story. 1 living room, 1 kitchen, 1 dining room, (1) 1/2 bath & roof deck. total remodel of lower 3 floors. | $80,000 |
| Oct 18, 2013 | Completed final sign-off Aug 2014 | 215 Stonecrest Dr | revision to pa# 2013-0809-3944-remodel kitchen, replace 2 kitchen windows (side & rear of house). remodel 1st floor half bathroom. insulatte floor from garage to crawl space. no habtable space added on garage levelDetails
revision to pa# 2013-0809-3944-remodel kitchen, replace 2 kitchen windows (side & rear of house). remodel 1st floor half bathroom. insulatte floor from garage to crawl space. no habtable space added on garage level | $20,000 |
| Aug 9, 2013 | Completed final sign-off Aug 2014 | 215 Stonecrest Dr | remodel 2 bathrooms; upgrade electrical and add lights to living room. replace 10 windows at side and rear. to comply with cec 150(k) 10. u factor not > 0.32Details
remodel 2 bathrooms; upgrade electrical and add lights to living room. replace 10 windows at side and rear. to comply with cec 150(k) 10. u factor not > 0.32 | $25,000 |
| Feb 29, 2012 | Completed final sign-off Aug 2012 | 1766 28th Av | add bathroom and den to ground floor. remodel ground floor family room. replace rear windows and door.new outdoor lighting,new furnace, new water heater.Details
add bathroom and den to ground floor. remodel ground floor family room. replace rear windows and door.new outdoor lighting,new furnace, new water heater. | $25,000 |
| Dec 28, 2011 | Completed final sign-off Mar 2013 | 8 Jakey Ct | convert family room into master bedroom by adding an additional full bathroom on 3rd floor. remodel second floor bathroom.Details
convert family room into master bedroom by adding an additional full bathroom on 3rd floor. remodel second floor bathroom. | $5,000 |
| Oct 6, 2011 | Expired or cancelled withdrawn May 2016 | 763 Naples St | revision to 201106137999. remove bathroom window on building side, remove closet windows at rear at 2nd floorDetails
revision to 201106137999. remove bathroom window on building side, remove closet windows at rear at 2nd floor |