Kennie Kwong Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Nov 2025
- Last 24 months
- 2 permits filed
26 permits since 2000: 23 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 158 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2023 | Completed final sign-off Oct 2024 | 75 Fairfield Wy | replace front stairs in-kindDetails
replace front stairs in-kind | $5,000 |
| Mar 23, 2012 | Completed final sign-off Jun 2012 | 268 Farallones St | 1)repair damaged eaves at front of house. 2) remove plywood obstructing extg stairs interior. 3)install 6" dia. duct for range hood to comply with nov 201299653. 4)permit for skylight, bathroom, & kitchen remodel on 2nd floor work already was completed without permit.Details
1)repair damaged eaves at front of house. 2) remove plywood obstructing extg stairs interior. 3)install 6" dia. duct for range hood to comply with nov 201299653. 4)permit for skylight, bathroom, & kitchen remodel on 2nd floor work already was completed without permit. | $3,000 |