Back to kitchen remodel contractors
Kennie Kwong Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Nov 2025
- Last 24 months
- 2 permits filed
26 permits since 2000: 23 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 9 completed, 1 never finaled. Typically 1 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2023 | Completed final sign-off Oct 2024 | 75 Fairfield Wy | revision to permit 202205114028. 1/f: reconfigure layout. 2/f: relocate kitchen and reconfigure layout. add 1 new skylight. remove deck at side.Details
revision to permit 202205114028. 1/f: reconfigure layout. 2/f: relocate kitchen and reconfigure layout. add 1 new skylight. remove deck at side. | $3,500 |
| May 11, 2022 | Completed final sign-off Oct 2024 | 75 Fairfield Wy | 1st floor: add 1bedroom , family room, home office and 1.5 bathroom. 2nd floor: remodel kitchen, bathroom, add 1 full bathroom.Details
1st floor: add 1bedroom , family room, home office and 1.5 bathroom. 2nd floor: remodel kitchen, bathroom, add 1 full bathroom. | $110,000 |
| Jul 1, 2020 | Completed final sign-off Oct 2021 | 1230 Shafter Av | remodel kitchen & bath same to same @ second floor. rewiring 2nd new outlet and lights.Details
remodel kitchen & bath same to same @ second floor. rewiring 2nd new outlet and lights. | $20,000 |
| Mar 10, 2020 | Completed final sign-off Oct 2021 | 1230 Shafter Av | add two bedrooms, one full bath and one media room @ ground floor. add one full bath @ 2nd floor. remodel (e) kitchen and bath @ 2nd floorDetails
add two bedrooms, one full bath and one media room @ ground floor. add one full bath @ 2nd floor. remodel (e) kitchen and bath @ 2nd floor | $58,888 |
| Sep 19, 2017 | Completed final sign-off Mar 2018 | 337 Willard North St | 337 north willard street: 1st fl: turn (e) kitchen into living room; turn (e) storage room into office; turn (e) bedroom into kitchen per plan. 2nd fl: kitchen remodel & add one full bath per plan.Details
337 north willard street: 1st fl: turn (e) kitchen into living room; turn (e) storage room into office; turn (e) bedroom into kitchen per plan. 2nd fl: kitchen remodel & add one full bath per plan. | $35,000 |
| May 19, 2014 | Never finaled issued May 2014, no final | 1315 Newhall St | to comply with nov 201452781. legalize bathroom, remove illegal kitchen, replace mildew in walls. work on ground floor.Details
to comply with nov 201452781. legalize bathroom, remove illegal kitchen, replace mildew in walls. work on ground floor. | $15,000 |
| Mar 23, 2012 | Completed final sign-off Jun 2012 | 268 Farallones St | 1)repair damaged eaves at front of house. 2) remove plywood obstructing extg stairs interior. 3)install 6" dia. duct for range hood to comply with nov 201299653. 4)permit for skylight, bathroom, & kitchen remodel on 2nd floor work already was completed without permit.Details
1)repair damaged eaves at front of house. 2) remove plywood obstructing extg stairs interior. 3)install 6" dia. duct for range hood to comply with nov 201299653. 4)permit for skylight, bathroom, & kitchen remodel on 2nd floor work already was completed without permit. | $3,000 |
| Dec 11, 2007 | Completed final sign-off Apr 2008 | 1751 45th Av | remove illegal kitchen in ground floor. to comply with complaint # 200729630, legalize bathroom.Details
remove illegal kitchen in ground floor. to comply with complaint # 200729630, legalize bathroom. | $13,000 |
| Mar 9, 2007 | Completed final sign-off Dec 2007 | 1508 Shafter Av | comply with nov 200789616, 2-23-07 to remove illegal kitchens t 1st and 2nd floorDetails
comply with nov 200789616, 2-23-07 to remove illegal kitchens t 1st and 2nd floor | $5,000 |
| Nov 21, 2006 | Completed final sign-off Dec 2006 | 136 Laura St | legalized basement. remove kitchen cabinets only. to comply w/ nov 200680817. 9x on $8000.00.Details
legalized basement. remove kitchen cabinets only. to comply w/ nov 200680817. 9x on $8000.00. | $8,000 |