Back to bathroom remodel contractors
Kennie Kwong Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Nov 2025
- Last 24 months
- 2 permits filed
26 permits since 2000: 23 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 2 never finaled. Typically 1 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2022 | Completed final sign-off Oct 2024 | 75 Fairfield Wy | 1st floor: add 1bedroom , family room, home office and 1.5 bathroom. 2nd floor: remodel kitchen, bathroom, add 1 full bathroom.Details
1st floor: add 1bedroom , family room, home office and 1.5 bathroom. 2nd floor: remodel kitchen, bathroom, add 1 full bathroom. | $110,000 |
| Jul 1, 2020 | Completed final sign-off Oct 2021 | 1230 Shafter Av | remodel kitchen & bath same to same @ second floor. rewiring 2nd new outlet and lights.Details
remodel kitchen & bath same to same @ second floor. rewiring 2nd new outlet and lights. | $20,000 |
| Mar 10, 2020 | Completed final sign-off Oct 2021 | 1230 Shafter Av | add two bedrooms, one full bath and one media room @ ground floor. add one full bath @ 2nd floor. remodel (e) kitchen and bath @ 2nd floorDetails
add two bedrooms, one full bath and one media room @ ground floor. add one full bath @ 2nd floor. remodel (e) kitchen and bath @ 2nd floor | $58,888 |
| Sep 19, 2017 | Completed final sign-off Mar 2018 | 337 Willard North St | 337 north willard street: 1st fl: turn (e) kitchen into living room; turn (e) storage room into office; turn (e) bedroom into kitchen per plan. 2nd fl: kitchen remodel & add one full bath per plan.Details
337 north willard street: 1st fl: turn (e) kitchen into living room; turn (e) storage room into office; turn (e) bedroom into kitchen per plan. 2nd fl: kitchen remodel & add one full bath per plan. | $35,000 |
| May 19, 2014 | Never finaled issued May 2014, no final | 1315 Newhall St | to comply with nov 201452781. legalize bathroom, remove illegal kitchen, replace mildew in walls. work on ground floor.Details
to comply with nov 201452781. legalize bathroom, remove illegal kitchen, replace mildew in walls. work on ground floor. | $15,000 |
| May 1, 2012 | Completed final sign-off Jun 2012 | 4238 Folsom St | 2nd fl only: seal entrance to bath from bedroom 1 and build n closet in bedrm 1. seal e closet 1 in bdrm 1, create opening for e closet in bdrm 2. remove e closet 2 in bedrm 2 and add new full bath w/new skylight. move e bdrm 2 opening +/- 1" toward project north along same wallDetails
2nd fl only: seal entrance to bath from bedroom 1 and build n closet in bedrm 1. seal e closet 1 in bdrm 1, create opening for e closet in bdrm 2. remove e closet 2 in bedrm 2 and add new full bath w/new skylight. move e bdrm 2 opening +/- 1" toward project north along same wall | $6,000 |
| Mar 23, 2012 | Completed final sign-off Jun 2012 | 268 Farallones St | 1)repair damaged eaves at front of house. 2) remove plywood obstructing extg stairs interior. 3)install 6" dia. duct for range hood to comply with nov 201299653. 4)permit for skylight, bathroom, & kitchen remodel on 2nd floor work already was completed without permit.Details
1)repair damaged eaves at front of house. 2) remove plywood obstructing extg stairs interior. 3)install 6" dia. duct for range hood to comply with nov 201299653. 4)permit for skylight, bathroom, & kitchen remodel on 2nd floor work already was completed without permit. | $3,000 |
| Dec 11, 2007 | Completed final sign-off Apr 2008 | 1751 45th Av | remove illegal kitchen in ground floor. to comply with complaint # 200729630, legalize bathroom.Details
remove illegal kitchen in ground floor. to comply with complaint # 200729630, legalize bathroom. | $13,000 |
| Nov 18, 2002 | Completed final sign-off Apr 2003 | 186 Shakespeare St | add toilet & bath on 1/fl. upgrade electric service & add outlets throughtout house, legalize 2 roomDetails
add toilet & bath on 1/fl. upgrade electric service & add outlets throughtout house, legalize 2 room | $20,000 |
| Sep 15, 2000 | Never finaled issued Feb 2002, no final | 48 Santa Rosa Av | rear addition - 1st floor family room, 2nd floor 1 bedroom & 1 bathroom.Details
rear addition - 1st floor family room, 2nd floor 1 bedroom & 1 bathroom. | $20,000 |