Back to kitchen remodel contractors
Kenneth Smith
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Jul 2025
- Last 24 months
- 1 permit filed
25 permits since 2000: 25 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 81 days from filing to permit and 201 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2021 | Completed final sign-off Feb 2022 | 123 Inverness Dr | legalize rooms down built w/out permit. 1)convert extg family room to one bedroom, family room and construct one full. 2)remodel extg kitchen, bathroom,add one full bathroom and replace extg sheet rock with new at 2nd floor. cfc requiredDetails
legalize rooms down built w/out permit. 1)convert extg family room to one bedroom, family room and construct one full. 2)remodel extg kitchen, bathroom,add one full bathroom and replace extg sheet rock with new at 2nd floor. cfc required | $82,000 |
| Jun 18, 2012 | Completed final sign-off Jun 2012 | 1601 Pacific Av | install kitchen cabinet island.Details
install kitchen cabinet island. | $2,500 |
| Nov 4, 2010 | Completed final sign-off Jan 2011 | 1180 Broderick St | kitchen remodel: (n) cab. granite countertop & wd. flr. bathrm. remodel: (n) fixtures, shower pan & tile flr. convert hall closet to laundry rm. add recessed lights in living rm., master bedrm. all work in-kind, no structural walls remove. provide high efficacy lights/switches for cec 150(k).Details
kitchen remodel: (n) cab. granite countertop & wd. flr. bathrm. remodel: (n) fixtures, shower pan & tile flr. convert hall closet to laundry rm. add recessed lights in living rm., master bedrm. all work in-kind, no structural walls remove. provide high efficacy lights/switches for cec 150(k). | $3,500 |
| Apr 12, 2010 | Completed final sign-off Mar 2011 | 4860 17th St | change location of kitchen, bath and install new switches, plugs and repair existing plumbing vertical sewer ( exterior). work on top floor unit. non supporting structural wall removal.Details
change location of kitchen, bath and install new switches, plugs and repair existing plumbing vertical sewer ( exterior). work on top floor unit. non supporting structural wall removal. | $15,000 |
| Mar 5, 2010 | Completed final sign-off Mar 2011 | 4030 Cesar Chavez St | work @ #4030 - rear addition (16' x 10') half bathroom & @ lower level & kitchen extension @ 1st floor.Details
work @ #4030 - rear addition (16' x 10') half bathroom & @ lower level & kitchen extension @ 1st floor. | $33,000 |
| Mar 5, 2010 | Completed final sign-off Mar 2011 | 4032 Cesar Chavez St | work @ #4032 - rear addition, kitchen extension & new roof deck.Details
work @ #4032 - rear addition, kitchen extension & new roof deck. | $17,000 |
| Jul 21, 2009 | Completed final sign-off Jun 2011 | 275 Chattanooga St | remove one kitchen on second floor. provide 1-hour fire rating guardraid/wall at future proposed new property line at rear bldg. submit approved permit #2001.07.23.4269 to proof of 1-hr. rating of passageway of 275 chattanooga st.Details
remove one kitchen on second floor. provide 1-hour fire rating guardraid/wall at future proposed new property line at rear bldg. submit approved permit #2001.07.23.4269 to proof of 1-hr. rating of passageway of 275 chattanooga st. | $1,500 |