Permit GraphShortlistSan Francisco building permits since 2000

Kenneth Smith

Contractor license
885942
State license record
Based in
San Francisco
On San Francisco permits
Feb 2009 to Jul 2025
Last 24 months
1 permit filed

25 permits since 2000: 25 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllRoof deck 1Deck 2Stairs 4Kitchen remodel 7Bathroom remodel 5

5 bathroom remodel permits: 5 completed. Typically 1 days from filing to permit and 201 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 1, 2021Completed
final sign-off Feb 2022
123 Inverness Drlegalize rooms down built w/out permit. 1)convert extg family room to one bedroom, family room and construct one full. 2)remodel extg kitchen, bathroom,add one full bathroom and replace extg sheet rock with new at 2nd floor. cfc required
Details
Permit
202103015608
Status
complete
Filed
Mar 1, 2021
Permit issued
May 21, 2021
Final sign-off
Feb 11, 2022
Declared cost
$82,000
Address
123 Inverness Dr

legalize rooms down built w/out permit. 1)convert extg family room to one bedroom, family room and construct one full. 2)remodel extg kitchen, bathroom,add one full bathroom and replace extg sheet rock with new at 2nd floor. cfc required

Open the permit page

$82,000
Aug 23, 2011Completed
final sign-off Jan 2012
1649 Beach Strevision to pa# 2011.07.22.0875. removal of non load bearing wall to increase bathroom width to conform to current code on 3rd floor. lighting must comply with cec(150k)
Details
Permit
201108233080
Status
complete
Filed
Aug 23, 2011
Permit issued
Aug 23, 2011
Final sign-off
Jan 9, 2012
Declared cost
$800
Address
1649 Beach St

revision to pa# 2011.07.22.0875. removal of non load bearing wall to increase bathroom width to conform to current code on 3rd floor. lighting must comply with cec(150k)

Open the permit page

$800
Jul 22, 2011Completed
final sign-off Jan 2012
1649 Beach Stbathroom remodel - take out tub, install tile, shower, move shower head & fixtures, change drain, remove tile, dry wall on floor walls & ceiling. install new switches and ceiling cans, new sink and cabinets (upper unit).
Details
Permit
201107220875
Status
complete
Filed
Jul 22, 2011
Permit issued
Jul 22, 2011
Final sign-off
Jan 9, 2012
Declared cost
$8,000
Address
1649 Beach St

bathroom remodel - take out tub, install tile, shower, move shower head & fixtures, change drain, remove tile, dry wall on floor walls & ceiling. install new switches and ceiling cans, new sink and cabinets (upper unit).

Open the permit page

$8,000
Apr 12, 2010Completed
final sign-off Mar 2011
4860 17th Stchange location of kitchen, bath and install new switches, plugs and repair existing plumbing vertical sewer ( exterior). work on top floor unit. non supporting structural wall removal.
Details
Permit
201004120087
Status
complete
Filed
Apr 12, 2010
Permit issued
Apr 13, 2010
Final sign-off
Mar 8, 2011
Declared cost
$15,000
Address
4860 17th St

change location of kitchen, bath and install new switches, plugs and repair existing plumbing vertical sewer ( exterior). work on top floor unit. non supporting structural wall removal.

Open the permit page

$15,000
Mar 5, 2010Completed
final sign-off Mar 2011
4030 Cesar Chavez Stwork @ #4030 - rear addition (16' x 10') half bathroom & @ lower level & kitchen extension @ 1st floor.
Details
Permit
201003057619
Status
complete
Filed
Mar 5, 2010
Permit issued
Sep 9, 2010
Final sign-off
Mar 29, 2011
Declared cost
$33,000
Address
4030 Cesar Chavez St

work @ #4030 - rear addition (16' x 10') half bathroom & @ lower level & kitchen extension @ 1st floor.

Open the permit page

$33,000