Keaveney Construction
- Based in
- Morgan Hill
- On San Francisco permits
- Aug 2014 to Sep 2026
- Last 24 months
- 4 permits filed
71 permits since 2000: 53 completed, 3 in progress, 10 never finaled, 5 expired or cancelled.
Of the 10 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 3 completed, 1 expired or cancelled. Typically 76 days from filing to permit and 411 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2024 | Expired or cancelled expired Jun 2026 | 265 Castro St | alter site: revision to permit 2021-1221-4807 s; to delete roof deck and spiral stair access to the roof add fixed ladder at rear of building to upper roof, delete rear yard accessory buildingDetails
alter site: revision to permit 2021-1221-4807 s; to delete roof deck and spiral stair access to the roof add fixed ladder at rear of building to upper roof, delete rear yard accessory building | |
| Feb 12, 2020 | Completed final sign-off Sep 2021 | 177 Day St | interior renovation with conversion of partial garage to living. partial foundation & slab replacement. kitchen renovation. relocate & reno 2 full baths. add 1 full bath at 1st fl. relocate connecting stair between 1st & 2nd fl. nw rear roof deck over 1st fl. new front door opening. 4 replacementDetails
interior renovation with conversion of partial garage to living. partial foundation & slab replacement. kitchen renovation. relocate & reno 2 full baths. add 1 full bath at 1st fl. relocate connecting stair between 1st & 2nd fl. nw rear roof deck over 1st fl. new front door opening. 4 replacement | $200,000 |
| Jan 24, 2020 | Completed final sign-off Sep 2021 | 306 Jersey St | construct (n) roof deck @rear of bldg, add steel grate & ladder @ lightwell for bedroom egress, upgrade egress door to rear stair, rating at roof below roof deck.Details
construct (n) roof deck @rear of bldg, add steel grate & ladder @ lightwell for bedroom egress, upgrade egress door to rear stair, rating at roof below roof deck. | $15,000 |
| Apr 25, 2016 | Completed final sign-off Oct 2017 | 1231 05th Av | two story exterior addition at rear & reconfiguration of (e) to daylight neighbors property line window. plus a one story pop out with roof deck.Details
two story exterior addition at rear & reconfiguration of (e) to daylight neighbors property line window. plus a one story pop out with roof deck. | $150,000 |