Back to bathroom remodel contractors
Keaveney Construction
- Based in
- Morgan Hill
- On San Francisco permits
- Aug 2014 to Sep 2026
- Last 24 months
- 4 permits filed
71 permits since 2000: 53 completed, 3 in progress, 10 never finaled, 5 expired or cancelled.
Of the 10 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 23 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 340 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 4376 24th St | replacing sheetrock in four bathrooms and one half bathroom, like for like. replacing faulty plumbing lines, including all hot & cold water lines.Details
replacing sheetrock in four bathrooms and one half bathroom, like for like. replacing faulty plumbing lines, including all hot & cold water lines. | $30,000 |
| Feb 20, 2024 | Completed final sign-off Sep 2024 | 1921 17th Av | develop group fl rooms for family room, office room, master bedroom & full bath. remove non load bearing paritions. no bearing wall structural changes. concrete slab to remain. provide sleeper floor & strengthen w/ voluntary plywood. 2 holddowns & new concrete footings.Details
develop group fl rooms for family room, office room, master bedroom & full bath. remove non load bearing paritions. no bearing wall structural changes. concrete slab to remain. provide sleeper floor & strengthen w/ voluntary plywood. 2 holddowns & new concrete footings. | $68,000 |
| Feb 1, 2023 | Completed final sign-off Jun 2023 | 2265 California St | bathroom remodel in kind. new plumbing fixtures, replace tiles. no chsnge on lighting.Details
bathroom remodel in kind. new plumbing fixtures, replace tiles. no chsnge on lighting. | $25,000 |
| Feb 4, 2022 | Completed final sign-off Apr 2023 | 674 03rd Av | mod to pa202201055393 to include minor changes to interior partitions. relocate bath at upper level, add bathroom,reopen wall between dining & bedroom, divide room.Details
mod to pa202201055393 to include minor changes to interior partitions. relocate bath at upper level, add bathroom,reopen wall between dining & bedroom, divide room. | $40,000 |
| Jan 5, 2022 | Completed final sign-off Apr 2023 | 674 03rd Av | kitchen and bathroom remodel. no moving walls.Details
kitchen and bathroom remodel. no moving walls. | $50,000 |
| Dec 10, 2021 | Completed final sign-off Jan 2023 | 86 Fair Oaks St | convert lower level storage to habitable space, new stair from upper level, create laundry, office, bath & living room @ lower level. voluntary seismic upgrade, excavate new landscaping step and patio at rear yardDetails
convert lower level storage to habitable space, new stair from upper level, create laundry, office, bath & living room @ lower level. voluntary seismic upgrade, excavate new landscaping step and patio at rear yard | $101,000 |
| Apr 16, 2021 | Never finaled issued Apr 2021, no final | 453 Tehama St | remodel bathroom in kind no wall alterationDetails
remodel bathroom in kind no wall alteration | $20,000 |
| Aug 25, 2020 | Completed final sign-off Jul 2023 | 250 Molimo Dr | renovation of a 2 story, 3 bedroom, 2 bath 1600 sf residence. entire 2nd story renovated including kitchen, living room, master bedroom, master bath, guest bedroom and connecting spaces. new skylights and windowsDetails
renovation of a 2 story, 3 bedroom, 2 bath 1600 sf residence. entire 2nd story renovated including kitchen, living room, master bedroom, master bath, guest bedroom and connecting spaces. new skylights and windows | $200,000 |
| Feb 12, 2020 | Completed final sign-off Sep 2021 | 177 Day St | interior renovation with conversion of partial garage to living. partial foundation & slab replacement. kitchen renovation. relocate & reno 2 full baths. add 1 full bath at 1st fl. relocate connecting stair between 1st & 2nd fl. nw rear roof deck over 1st fl. new front door opening. 4 replacementDetails
interior renovation with conversion of partial garage to living. partial foundation & slab replacement. kitchen renovation. relocate & reno 2 full baths. add 1 full bath at 1st fl. relocate connecting stair between 1st & 2nd fl. nw rear roof deck over 1st fl. new front door opening. 4 replacement | $200,000 |
| Feb 11, 2020 | Completed final sign-off Mar 2021 | 283 30th Av | remodel lower level to create new family room, bath, laundry rm. new foudations. new stair to lower levelDetails
remodel lower level to create new family room, bath, laundry rm. new foudations. new stair to lower level | $127,000 |
| Jan 7, 2020 | Completed final sign-off Jul 2020 | 306 Jersey St | 306: 1 bath on bottom fl, 1 bath on 2nd fl, 1 laundry room on 1st fl, remodel, no wall alterations. 308: top floor remodel, 1 kitchen, 1 bath, 1 laundry, no change.Details
306: 1 bath on bottom fl, 1 bath on 2nd fl, 1 laundry room on 1st fl, remodel, no wall alterations. 308: top floor remodel, 1 kitchen, 1 bath, 1 laundry, no change. | $100,000 |
| Aug 6, 2019 | Completed final sign-off Jan 2021 | 345 Holly Park Cr | interior renovation (n) kitchen, (n) bathroom & powder room, create habitable space at ground floor, add (n) bath, laundry & media room, infill under 2nd story volume at rear, (n) bay windows, (n) windows and exterior sidingDetails
interior renovation (n) kitchen, (n) bathroom & powder room, create habitable space at ground floor, add (n) bath, laundry & media room, infill under 2nd story volume at rear, (n) bay windows, (n) windows and exterior siding | $250,000 |
| May 6, 2019 | Completed final sign-off Dec 2019 | 710 Victoria St | comply w/ n.o.v 201928409. remove (e) sink & shower from finished garge. restore function as storage, retain 1/2 bath.Details
comply w/ n.o.v 201928409. remove (e) sink & shower from finished garge. restore function as storage, retain 1/2 bath. | $3,000 |
| Nov 14, 2018 | Completed final sign-off Feb 2019 | 213 Virginia Av | bathroom and kitchen remodel in kind.Details
bathroom and kitchen remodel in kind. | $45,000 |
| Nov 6, 2018 | Completed final sign-off Jan 2019 | 907 Darien Wy | bathroom remodel in kind. no change to lighting. everything stays in same place. re-configure closet openings.Details
bathroom remodel in kind. no change to lighting. everything stays in same place. re-configure closet openings. | $20,000 |
| Nov 2, 2018 | Completed final sign-off Jul 2020 | 969 Shotwell St | reconstruct rear yard deck & stairs. renovate (e) 2 unit dwelling. expand 2nd fl unit (969-a)with horizontal addition @ levels 1-2. create habitable space on the 1st fl connected to the 2nd fl unit with a new interior stair. add master bed,bath & fam roomDetails
reconstruct rear yard deck & stairs. renovate (e) 2 unit dwelling. expand 2nd fl unit (969-a)with horizontal addition @ levels 1-2. create habitable space on the 1st fl connected to the 2nd fl unit with a new interior stair. add master bed,bath & fam room | $200,000 |
| Apr 27, 2018 | Completed final sign-off Feb 2020 | 291 Topaz Wy | revision to 201802010125, kitchen and bath remodel, to include additional work. removate e home w/new kitchen at 2nd lvl. new slider at patio, remodel mstr bath. replace vertical siding w/stucco. replace patio wall. replace ext railings, new skylightDetails
revision to 201802010125, kitchen and bath remodel, to include additional work. removate e home w/new kitchen at 2nd lvl. new slider at patio, remodel mstr bath. replace vertical siding w/stucco. replace patio wall. replace ext railings, new skylight | $50,000 |
| Feb 1, 2018 | Completed final sign-off Feb 2020 | 291 Topaz Wy | remodel 2 full bathrooms in kind. remodel 1 powder room in kind. remodel 1 kitchen in kind.Details
remodel 2 full bathrooms in kind. remodel 1 powder room in kind. remodel 1 kitchen in kind. | $60,000 |
| Dec 21, 2017 | Completed final sign-off Feb 2019 | 213 Virginia Av | bathroom remodel in kind. no change in walls and opening layoutDetails
bathroom remodel in kind. no change in walls and opening layout | $20,000 |
| Nov 30, 2017 | Completed final sign-off May 2018 | 614 26th Av | two kitchens & 2 baths remodel in kind. working on 614 and 616 26th ave. (one in each unit) no change in wall and opening layoutDetails
two kitchens & 2 baths remodel in kind. working on 614 and 616 26th ave. (one in each unit) no change in wall and opening layout | $50,000 |
| Aug 10, 2016 | Completed final sign-off Jan 2017 | 51 Somerset St | kitchen and bath remodel, replace rear window w/ door - not visible from street. add den, new bedroom, new bathroom, new laundry room on first floor.Details
kitchen and bath remodel, replace rear window w/ door - not visible from street. add den, new bedroom, new bathroom, new laundry room on first floor. | $117,000 |
| Jun 14, 2016 | Completed final sign-off Sep 2016 | 2379 15th Av | bathroom remodel in kind. no walls removed or added.Details
bathroom remodel in kind. no walls removed or added. | $20,000 |
| Apr 6, 2016 | Expired or cancelled withdrawn Oct 2017 | 1231 05th Av | interior remodel - remove walls in kitchen, replace all windows in kind. replace/repair stairs. replace sink in kitchen and bathroomDetails
interior remodel - remove walls in kitchen, replace all windows in kind. replace/repair stairs. replace sink in kitchen and bathroom | $70,000 |
| Feb 12, 2016 | Completed final sign-off May 2016 | 401 Castenada Av | 2 bathroom remodels in kind, re-tiling , new fixtures, no change to walls, doors or openings.Details
2 bathroom remodels in kind, re-tiling , new fixtures, no change to walls, doors or openings. | $30,000 |
| Feb 4, 2016 | Never finaled issued Jun 2016, no final | 429 Liberty St | renovations to s.f. dwelling: add master bedroom and bath to 1st story. remodel kitchen dining and living room. create stair to lower level. remodel upper level to create 2 bedrooms and 2 baths. new windows and doors.Details
renovations to s.f. dwelling: add master bedroom and bath to 1st story. remodel kitchen dining and living room. create stair to lower level. remodel upper level to create 2 bedrooms and 2 baths. new windows and doors. | $310,000 |
| Jan 22, 2016 | Completed final sign-off Oct 2017 | 1231 05th Av | expand envelope into lightwell. remodel existing 2 bathsDetails
expand envelope into lightwell. remodel existing 2 baths | $42,000 |
| Mar 17, 2015 | Completed final sign-off Jun 2015 | 2500 Market St | office tenant improvements. minor accessibility improvement at e bathrooms. add ada shower in unisex restroom. remove e walls at 2nd fl conference room, break room, private offices along north wall, add phone closetDetails
office tenant improvements. minor accessibility improvement at e bathrooms. add ada shower in unisex restroom. remove e walls at 2nd fl conference room, break room, private offices along north wall, add phone closet | $45,000 |