Keaveney Construction
- Based in
- Morgan Hill
- On San Francisco permits
- Aug 2014 to Sep 2026
- Last 24 months
- 4 permits filed
71 permits since 2000: 53 completed, 3 in progress, 10 never finaled, 5 expired or cancelled.
Of the 10 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 161 days from filing to permit and 474 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 2, 2018 | Completed final sign-off Jul 2020 | 969 Shotwell St | reconstruct rear yard deck & stairs. renovate (e) 2 unit dwelling. expand 2nd fl unit (969-a)with horizontal addition @ levels 1-2. create habitable space on the 1st fl connected to the 2nd fl unit with a new interior stair. add master bed,bath & fam roomDetails
reconstruct rear yard deck & stairs. renovate (e) 2 unit dwelling. expand 2nd fl unit (969-a)with horizontal addition @ levels 1-2. create habitable space on the 1st fl connected to the 2nd fl unit with a new interior stair. add master bed,bath & fam room | $200,000 |