Back to kitchen remodel contractors
Kasas Builders Inc
- Based in
- El Sobrante
- On San Francisco permits
- Sep 2016 to Sep 2026
- Last 24 months
- 14 permits filed
46 permits since 2000: 35 completed, 9 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 12 completed, 4 in progress. Typically 16 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | In progress filed Aug 2026, not yet issued | 140 Precita Av | new window at kitchen, 24x48. sliding door at breakfast nook. new window, 17x24 at bathroom. sliding door at breakfast nook. replace siding around window replacements.Details
new window at kitchen, 24x48. sliding door at breakfast nook. new window, 17x24 at bathroom. sliding door at breakfast nook. replace siding around window replacements. | $11,000 |
| Jun 30, 2026 | In progress issued Aug 2026 | 101 Genebern Wy | 1st fl.interior remodel:(n) open kitchen /living room, powder room & bathroom. 2nd fl:interior renovation:(e) bedrooms,living room and bathroom and a (n) primary bathroom, closet and stair location. replacing existing windows and adding a (n) rear window, rear slider door and solatube skylights.Details
1st fl.interior remodel:(n) open kitchen /living room, powder room & bathroom. 2nd fl:interior renovation:(e) bedrooms,living room and bathroom and a (n) primary bathroom, closet and stair location. replacing existing windows and adding a (n) rear window, rear slider door and solatube skylights. | $560,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 140 Precita Av | remove all interior drywall or old wet plaster system, replace with (n) drywall. remove (e) wiring & upgrade to (n) 200amp service. remove 7 replace all plumbing. remove (e) kitchen, install (n) kitchen, remove (e) bathroom, install (n) bathroom, remove fireplace, install (n) electric fireplace.Details
remove all interior drywall or old wet plaster system, replace with (n) drywall. remove (e) wiring & upgrade to (n) 200amp service. remove 7 replace all plumbing. remove (e) kitchen, install (n) kitchen, remove (e) bathroom, install (n) bathroom, remove fireplace, install (n) electric fireplace. | $80,000 |
| Jan 15, 2025 | Completed final sign-off Aug 2025 | 562 14th St | remodel kitchen in kind. kitchen includes existing washer/dryer. no moving walls. fixtures to remain in the same location.Details
remodel kitchen in kind. kitchen includes existing washer/dryer. no moving walls. fixtures to remain in the same location. | $55,839 |
| Dec 18, 2024 | Completed final sign-off Jun 2025 | 1762 Jackson St | kitchen and (2) bathroom remodels in kind.Details
kitchen and (2) bathroom remodels in kind. | $184,000 |
| Sep 11, 2024 | Completed final sign-off Dec 2024 | 2674 17th Av | kitchen remodel, add new subpanel at garage and rewire kitchen, add a water line for ice maker and the rest of plumbing remains the same.Details
kitchen remodel, add new subpanel at garage and rewire kitchen, add a water line for ice maker and the rest of plumbing remains the same. | $61,000 |
| May 16, 2023 | Completed final sign-off Aug 2024 | 1645 Florida St | interior remodel. remodel exisitng kitchen and bathroom. remove load bearing wall in the kitchen. add new 15 ft sliding door in the rear wall. new full batroom and washer and dryer on 3rd floorDetails
interior remodel. remodel exisitng kitchen and bathroom. remove load bearing wall in the kitchen. add new 15 ft sliding door in the rear wall. new full batroom and washer and dryer on 3rd floor | $100,000 |
| Oct 17, 2022 | In progress issued Mar 2024 | 212 Genebern Wy | renovation of (e) home. on main level, enlarged kitchen to include bar seating and open walls to family and dining rooms. attached bath added to 2 bedrooms, and maintain 1 bedroom and full bath. new direct vent fireplace in living room. on lower level adding: staircase from main level, (n)laundry,Details
renovation of (e) home. on main level, enlarged kitchen to include bar seating and open walls to family and dining rooms. attached bath added to 2 bedrooms, and maintain 1 bedroom and full bath. new direct vent fireplace in living room. on lower level adding: staircase from main level, (n)laundry, | $670,000 |
| Mar 2, 2022 | Completed final sign-off Aug 2022 | 672 Clipper St | unit 2, one kitchen remodel - replace existing kitchen sink and new electrical wiring for cooktop, wall oven, microwave and wine cooler. new kitchen cabinets. no new wall, no change to existing wall. no window relocationDetails
unit 2, one kitchen remodel - replace existing kitchen sink and new electrical wiring for cooktop, wall oven, microwave and wine cooler. new kitchen cabinets. no new wall, no change to existing wall. no window relocation | $33,705 |
| Jul 21, 2020 | Completed final sign-off Jan 2021 | 49 Jersey St | kitchen remodel; laundry room remodel to add 1/2 bathDetails
kitchen remodel; laundry room remodel to add 1/2 bath | $80,000 |
| Jun 29, 2020 | Completed final sign-off Mar 2021 | 2128 Cabrillo St | renovate bathroom and kitchen on upper level and add a new bathroom in place of (e) closet space, upgrade electrical sub-panel and rewire the upper level, install a new furnace in the garageDetails
renovate bathroom and kitchen on upper level and add a new bathroom in place of (e) closet space, upgrade electrical sub-panel and rewire the upper level, install a new furnace in the garage | $158,000 |
| Feb 3, 2020 | Completed final sign-off Jun 2020 | 565 14th St | kitchen remodel. use (e) plumbing layout. rewire electrical. replace (e) sink in kitchen. no changes to window location or load-bearing wallsDetails
kitchen remodel. use (e) plumbing layout. rewire electrical. replace (e) sink in kitchen. no changes to window location or load-bearing walls | $40,000 |
| Apr 17, 2019 | Completed final sign-off Sep 2019 | 137 Buchanan St | kitchen remodel. convert a portion of existing kitchen to a 2nd bath. no change to exterior or change in floor areaDetails
kitchen remodel. convert a portion of existing kitchen to a 2nd bath. no change to exterior or change in floor area | $30,000 |
| Apr 8, 2019 | Completed final sign-off Nov 2020 | 535 Taylor St | # 607:revision to 2019.0205.2160. remodel #607, same layout; rewire the kitchen, bath, bedroom; new interior sheetrock, new subpanel; rough electrical for sub & main panel; rough plumbing, same layout, upgrade pipes & install the new fixtures. 4 new clad windows.Details
# 607:revision to 2019.0205.2160. remodel #607, same layout; rewire the kitchen, bath, bedroom; new interior sheetrock, new subpanel; rough electrical for sub & main panel; rough plumbing, same layout, upgrade pipes & install the new fixtures. 4 new clad windows. | $8,000 |
| Feb 5, 2019 | Completed final sign-off Aug 2019 | 535 Taylor St | uni#607: to comply with nov#201704641.items 3,4,5,6,11,12. all new led lighting,same layout, rewire the kitchen,bathroom &bedroom/livingroom.open sheetrock only on areas to run the electrical wires, install a new subpanel with new meter.Details
uni#607: to comply with nov#201704641.items 3,4,5,6,11,12. all new led lighting,same layout, rewire the kitchen,bathroom &bedroom/livingroom.open sheetrock only on areas to run the electrical wires, install a new subpanel with new meter. | $62,200 |
| Sep 6, 2016 | Completed final sign-off Apr 2021 | 833 York St | legalize illegal expansion at rear of building, re-config interior layout on g/f behind garage w/ two full baths, sunrm,one bedrm, family room, laundry. 2nd fl; w/ one bedrm, living, kitchen, dinningrm, two full bath per plan, relocate intterior connection 1st & 2nd floor per plan.Details
legalize illegal expansion at rear of building, re-config interior layout on g/f behind garage w/ two full baths, sunrm,one bedrm, family room, laundry. 2nd fl; w/ one bedrm, living, kitchen, dinningrm, two full bath per plan, relocate intterior connection 1st & 2nd floor per plan. | $8,000 |