Kasas Builders Inc
- Based in
- El Sobrante
- On San Francisco permits
- Sep 2016 to Sep 2026
- Last 24 months
- 14 permits filed
46 permits since 2000: 35 completed, 9 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 in progress. Typically 2 days from filing to permit and 63 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2026 | Completed final sign-off Sep 2026 | 641 Baker St | replace/sistered damaged wood joist and post at existing rear deck, replace wood planks/boards and existing guardrailing systems. less than 50%Details
replace/sistered damaged wood joist and post at existing rear deck, replace wood planks/boards and existing guardrailing systems. less than 50% | $21,500 |
| Dec 5, 2025 | In progress issued Dec 2025 | 212 Genebern Wy | revision to pa # 2022-1017-4502: reduction in scope. deck size is smaller. install door #8 in lieu of window 14. install new 45 min rated door in lieu of door #4 at common hall.Details
revision to pa # 2022-1017-4502: reduction in scope. deck size is smaller. install door #8 in lieu of window 14. install new 45 min rated door in lieu of door #4 at common hall. | $2,000 |