Back to bathroom remodel contractors
Kasas Builders Inc
- Based in
- El Sobrante
- On San Francisco permits
- Sep 2016 to Sep 2026
- Last 24 months
- 14 permits filed
46 permits since 2000: 35 completed, 9 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 16 completed, 5 in progress, 1 expired or cancelled. Typically 5 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | In progress filed Aug 2026, not yet issued | 140 Precita Av | new window at kitchen, 24x48. sliding door at breakfast nook. new window, 17x24 at bathroom. sliding door at breakfast nook. replace siding around window replacements.Details
new window at kitchen, 24x48. sliding door at breakfast nook. new window, 17x24 at bathroom. sliding door at breakfast nook. replace siding around window replacements. | $11,000 |
| Jun 30, 2026 | In progress issued Aug 2026 | 101 Genebern Wy | 1st fl.interior remodel:(n) open kitchen /living room, powder room & bathroom. 2nd fl:interior renovation:(e) bedrooms,living room and bathroom and a (n) primary bathroom, closet and stair location. replacing existing windows and adding a (n) rear window, rear slider door and solatube skylights.Details
1st fl.interior remodel:(n) open kitchen /living room, powder room & bathroom. 2nd fl:interior renovation:(e) bedrooms,living room and bathroom and a (n) primary bathroom, closet and stair location. replacing existing windows and adding a (n) rear window, rear slider door and solatube skylights. | $560,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 140 Precita Av | remove all interior drywall or old wet plaster system, replace with (n) drywall. remove (e) wiring & upgrade to (n) 200amp service. remove 7 replace all plumbing. remove (e) kitchen, install (n) kitchen, remove (e) bathroom, install (n) bathroom, remove fireplace, install (n) electric fireplace.Details
remove all interior drywall or old wet plaster system, replace with (n) drywall. remove (e) wiring & upgrade to (n) 200amp service. remove 7 replace all plumbing. remove (e) kitchen, install (n) kitchen, remove (e) bathroom, install (n) bathroom, remove fireplace, install (n) electric fireplace. | $80,000 |
| Mar 14, 2025 | In progress issued Mar 2025 | 1855 Laguna St | 3 bathroom and laundry remodel. 2 shower pans. no new wall or change to (e) wall or windows. no change in plumbing fixture count.Details
3 bathroom and laundry remodel. 2 shower pans. no new wall or change to (e) wall or windows. no change in plumbing fixture count. | $151,051 |
| Dec 18, 2024 | Completed final sign-off Jun 2025 | 1762 Jackson St | kitchen and (2) bathroom remodels in kind.Details
kitchen and (2) bathroom remodels in kind. | $184,000 |
| Jul 31, 2023 | Completed final sign-off Aug 2024 | 1645 Florida St | 2-bedroom windows (1-street visible), 1-bathroom window replacement in-kind with tempered glass, lowe, ebony fiberglass exterior. no change to window location or size. only 1 window visible from the street. to be alum clad double hung operation.Details
2-bedroom windows (1-street visible), 1-bathroom window replacement in-kind with tempered glass, lowe, ebony fiberglass exterior. no change to window location or size. only 1 window visible from the street. to be alum clad double hung operation. | $3,000 |
| May 16, 2023 | Completed final sign-off Aug 2024 | 1645 Florida St | interior remodel. remodel exisitng kitchen and bathroom. remove load bearing wall in the kitchen. add new 15 ft sliding door in the rear wall. new full batroom and washer and dryer on 3rd floorDetails
interior remodel. remodel exisitng kitchen and bathroom. remove load bearing wall in the kitchen. add new 15 ft sliding door in the rear wall. new full batroom and washer and dryer on 3rd floor | $100,000 |
| Mar 2, 2023 | Completed final sign-off Apr 2023 | 49 Jersey St | (1) bathroom remodel. install new bathtub. install new heated mat floor tiles and new wall tiles. toilet and sink to remain. no new change to window/wall locations.Details
(1) bathroom remodel. install new bathtub. install new heated mat floor tiles and new wall tiles. toilet and sink to remain. no new change to window/wall locations. | $26,000 |
| Oct 24, 2022 | Expired or cancelled cancelled Jan 2026 | 565 14th St | revision permit to 202208100228. to include bathroom windows replacement.Details
revision permit to 202208100228. to include bathroom windows replacement. | |
| Oct 17, 2022 | In progress issued Mar 2024 | 212 Genebern Wy | renovation of (e) home. on main level, enlarged kitchen to include bar seating and open walls to family and dining rooms. attached bath added to 2 bedrooms, and maintain 1 bedroom and full bath. new direct vent fireplace in living room. on lower level adding: staircase from main level, (n)laundry,Details
renovation of (e) home. on main level, enlarged kitchen to include bar seating and open walls to family and dining rooms. attached bath added to 2 bedrooms, and maintain 1 bedroom and full bath. new direct vent fireplace in living room. on lower level adding: staircase from main level, (n)laundry, | $670,000 |
| Aug 30, 2022 | Completed final sign-off Dec 2022 | 3634 20th St | bathroom remodel. replace existing plumbing fixtures, rewire electrical. 1 new shower pan and 1 new sink.Details
bathroom remodel. replace existing plumbing fixtures, rewire electrical. 1 new shower pan and 1 new sink. | $52,819 |
| Jul 13, 2021 | Completed final sign-off Oct 2021 | 433 02nd Av | convert 1 (e) bathroom into 2 separate bathrooms. no change to load bearing walls.Details
convert 1 (e) bathroom into 2 separate bathrooms. no change to load bearing walls. | $74,000 |
| Jun 11, 2021 | Completed final sign-off Feb 2022 | 4323 19th St | two bathroom remodel. replace existing plumbing fixtures. rewire electrical. no changes to wall or windows location. no new wall & no existing wall relocation. shall comply with cec 150.0Details
two bathroom remodel. replace existing plumbing fixtures. rewire electrical. no changes to wall or windows location. no new wall & no existing wall relocation. shall comply with cec 150.0 | $60,000 |
| Jul 21, 2020 | Completed final sign-off Jan 2021 | 49 Jersey St | kitchen remodel; laundry room remodel to add 1/2 bathDetails
kitchen remodel; laundry room remodel to add 1/2 bath | $80,000 |
| Jul 15, 2020 | Completed final sign-off Sep 2024 | 1025 Phelps St | 2nd flr-widen opening btwn (e) kitch & liv rm. kitch remodl. remove walls, install guardrails at (e) stairs. 3rd flr- bath remodl, rebuild rear balcony. comp w/ nov 202030691Details
2nd flr-widen opening btwn (e) kitch & liv rm. kitch remodl. remove walls, install guardrails at (e) stairs. 3rd flr- bath remodl, rebuild rear balcony. comp w/ nov 202030691 | $25,000 |
| Jun 29, 2020 | Completed final sign-off Mar 2021 | 2128 Cabrillo St | renovate bathroom and kitchen on upper level and add a new bathroom in place of (e) closet space, upgrade electrical sub-panel and rewire the upper level, install a new furnace in the garageDetails
renovate bathroom and kitchen on upper level and add a new bathroom in place of (e) closet space, upgrade electrical sub-panel and rewire the upper level, install a new furnace in the garage | $158,000 |
| Dec 19, 2019 | Completed final sign-off May 2020 | 655 Clayton St | main bahtroom and powder room remodel. new shower pan in main bathroom add new toilet in main bathroom. no change to window location or load bearing walls. replace window in powder room and main bathroom in kind. no change to existing fixture count.Details
main bahtroom and powder room remodel. new shower pan in main bathroom add new toilet in main bathroom. no change to window location or load bearing walls. replace window in powder room and main bathroom in kind. no change to existing fixture count. | $39,000 |
| Sep 19, 2019 | Completed final sign-off Dec 2019 | 2245 15th St | remodel (e) master bathroom (new fixtures-convert tub to shower) and add new stackagle laundry in the same room with new laundry box into (e) space. no walls infilled or modified. layout remains unchanged.Details
remodel (e) master bathroom (new fixtures-convert tub to shower) and add new stackagle laundry in the same room with new laundry box into (e) space. no walls infilled or modified. layout remains unchanged. | $35,000 |
| Apr 17, 2019 | Completed final sign-off Sep 2019 | 137 Buchanan St | kitchen remodel. convert a portion of existing kitchen to a 2nd bath. no change to exterior or change in floor areaDetails
kitchen remodel. convert a portion of existing kitchen to a 2nd bath. no change to exterior or change in floor area | $30,000 |
| Apr 8, 2019 | Completed final sign-off Nov 2020 | 535 Taylor St | # 607:revision to 2019.0205.2160. remodel #607, same layout; rewire the kitchen, bath, bedroom; new interior sheetrock, new subpanel; rough electrical for sub & main panel; rough plumbing, same layout, upgrade pipes & install the new fixtures. 4 new clad windows.Details
# 607:revision to 2019.0205.2160. remodel #607, same layout; rewire the kitchen, bath, bedroom; new interior sheetrock, new subpanel; rough electrical for sub & main panel; rough plumbing, same layout, upgrade pipes & install the new fixtures. 4 new clad windows. | $8,000 |
| Feb 5, 2019 | Completed final sign-off Aug 2019 | 535 Taylor St | uni#607: to comply with nov#201704641.items 3,4,5,6,11,12. all new led lighting,same layout, rewire the kitchen,bathroom &bedroom/livingroom.open sheetrock only on areas to run the electrical wires, install a new subpanel with new meter.Details
uni#607: to comply with nov#201704641.items 3,4,5,6,11,12. all new led lighting,same layout, rewire the kitchen,bathroom &bedroom/livingroom.open sheetrock only on areas to run the electrical wires, install a new subpanel with new meter. | $62,200 |
| Sep 6, 2016 | Completed final sign-off Apr 2021 | 833 York St | legalize illegal expansion at rear of building, re-config interior layout on g/f behind garage w/ two full baths, sunrm,one bedrm, family room, laundry. 2nd fl; w/ one bedrm, living, kitchen, dinningrm, two full bath per plan, relocate intterior connection 1st & 2nd floor per plan.Details
legalize illegal expansion at rear of building, re-config interior layout on g/f behind garage w/ two full baths, sunrm,one bedrm, family room, laundry. 2nd fl; w/ one bedrm, living, kitchen, dinningrm, two full bath per plan, relocate intterior connection 1st & 2nd floor per plan. | $8,000 |