Back to kitchen remodel contractors
K T Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Jan 2010
- Last 24 months
- 0 permits filed
25 permits since 2000: 23 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 0 days from filing to permit and 55 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2009 | Completed final sign-off Mar 2009 | 666 29th Av | remodel kitchen & bathroom on 2nd floor. upgrade panel bar. & upgarde water line to copper pipe. no structural work. replace supply duct for existing furnace.Details
remodel kitchen & bathroom on 2nd floor. upgrade panel bar. & upgarde water line to copper pipe. no structural work. replace supply duct for existing furnace. | $35,000 |
| Jan 13, 2009 | Completed final sign-off May 2009 | 1342 39th Av | remodel ground floor to have 2 bedrooms, 1 full bathroom, 1 family room & 1 storage room. install new gas furnace, water heater & laundry in garage. 2nd floor to remodel kitchen with new cabinets, countertops & fixtures. remodel 2 full bathrooms with new wall, fixtrues & finishes.Details
remodel ground floor to have 2 bedrooms, 1 full bathroom, 1 family room & 1 storage room. install new gas furnace, water heater & laundry in garage. 2nd floor to remodel kitchen with new cabinets, countertops & fixtures. remodel 2 full bathrooms with new wall, fixtrues & finishes. | $53,000 |
| Nov 28, 2007 | Completed final sign-off Jan 2008 | 5322 Geary Bl | replace broken tile on floor. patch up holes in walls. in kitchen area of restaurant.Details
replace broken tile on floor. patch up holes in walls. in kitchen area of restaurant. | $11,000 |
| Jun 7, 2007 | Completed final sign-off Oct 2007 | 1443 19th Av | remodel kitchen and bathroom kitchen remove old cabinet stove - bathroom remove old tile bathtub sinkDetails
remodel kitchen and bathroom kitchen remove old cabinet stove - bathroom remove old tile bathtub sink | $12,000 |
| Mar 27, 2007 | Completed final sign-off Jun 2007 | 184 Trumbull St | replace 1 kitchen cabinets and new tile only in 1 bathroom.Details
replace 1 kitchen cabinets and new tile only in 1 bathroom. | $6,000 |
| Nov 7, 2006 | Completed final sign-off Oct 2007 | 4476 Mission St | tenant improvements for an existing restaurant, work includes upgrade ktichen and seating areas, provide accessible restroom and entrance to comply with accessibility requirements. add hood to kitchen (type i).Details
tenant improvements for an existing restaurant, work includes upgrade ktichen and seating areas, provide accessible restroom and entrance to comply with accessibility requirements. add hood to kitchen (type i). | $62,000 |
| Jul 10, 2002 | Completed final sign-off Aug 2002 | 2721 Ortega St | remodel bathrm,change kitchen cabinets,install new service box & repl fixtureDetails
remodel bathrm,change kitchen cabinets,install new service box & repl fixture | $5,500 |
| Mar 26, 2002 | Completed final sign-off May 2002 | 348 Scott St | kitchen remodel:remove e kitchen cabinets,appliances, plumbing,framing,gas line,replaceDetails
kitchen remodel:remove e kitchen cabinets,appliances, plumbing,framing,gas line,replace | $10,000 |
| Feb 20, 2002 | Completed final sign-off Mar 2002 | 3670 17th St | replace cabinet, sink, faucet in 1st floor kitchen. no change in walls and no structural work.Details
replace cabinet, sink, faucet in 1st floor kitchen. no change in walls and no structural work. | $5,000 |