Back to bathroom remodel contractors
K T Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Jan 2010
- Last 24 months
- 0 permits filed
25 permits since 2000: 23 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 12 completed, 1 never finaled. Typically 0 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2010 | Completed final sign-off Jul 2010 | 96 Sylvan Dr | remove existing roof on portion of garage. install (n) balcony on top of garage roof ( approx 104 sqft). legalize (e) full bathroom at basement/ garage floorDetails
remove existing roof on portion of garage. install (n) balcony on top of garage roof ( approx 104 sqft). legalize (e) full bathroom at basement/ garage floor | $13,800 |
| Jan 20, 2009 | Completed final sign-off Mar 2009 | 666 29th Av | remodel kitchen & bathroom on 2nd floor. upgrade panel bar. & upgarde water line to copper pipe. no structural work. replace supply duct for existing furnace.Details
remodel kitchen & bathroom on 2nd floor. upgrade panel bar. & upgarde water line to copper pipe. no structural work. replace supply duct for existing furnace. | $35,000 |
| Jan 13, 2009 | Completed final sign-off May 2009 | 1342 39th Av | remodel ground floor to have 2 bedrooms, 1 full bathroom, 1 family room & 1 storage room. install new gas furnace, water heater & laundry in garage. 2nd floor to remodel kitchen with new cabinets, countertops & fixtures. remodel 2 full bathrooms with new wall, fixtrues & finishes.Details
remodel ground floor to have 2 bedrooms, 1 full bathroom, 1 family room & 1 storage room. install new gas furnace, water heater & laundry in garage. 2nd floor to remodel kitchen with new cabinets, countertops & fixtures. remodel 2 full bathrooms with new wall, fixtrues & finishes. | $53,000 |
| Sep 22, 2008 | Completed final sign-off Jan 2009 | 136 Moneta Wy | remodel ground floor to include 2 bedrooms, 1 full bath, 3 storge rooms, and hallway. relocate existing gas, furnace, water heater and laundry sink in garage. enlarge 2 rear windows.Details
remodel ground floor to include 2 bedrooms, 1 full bath, 3 storge rooms, and hallway. relocate existing gas, furnace, water heater and laundry sink in garage. enlarge 2 rear windows. | $38,000 |
| Aug 15, 2008 | Completed final sign-off Feb 2009 | 261 27th Av | replace old 1 kitche cabinet and old tile . in 1 bathroom in apt #8. no change to wall windows or door.Details
replace old 1 kitche cabinet and old tile . in 1 bathroom in apt #8. no change to wall windows or door. | $17,000 |
| Mar 17, 2008 | Completed final sign-off May 2008 | 2674 45th Av | convert ex. storage on the ground floor into 2 bedrooms and 1 bathroom upgrade windows in the rear, 1hr rated walls and install r13 insulation in exterior walls. install smoke detectors in 2nd floor and 200sq in ventilation for garage.Details
convert ex. storage on the ground floor into 2 bedrooms and 1 bathroom upgrade windows in the rear, 1hr rated walls and install r13 insulation in exterior walls. install smoke detectors in 2nd floor and 200sq in ventilation for garage. | $38,000 |
| Mar 3, 2008 | Never finaled issued Mar 2008, no final | 2674 45th Av | remove sheet rock on ground floor in room and bathroom remodel. to be done under seperate permit.Details
remove sheet rock on ground floor in room and bathroom remodel. to be done under seperate permit. | $450 |
| Oct 16, 2007 | Completed final sign-off Jan 2009 | 1471 31st Av | construct one bedroom, laundry room, one storage room and one bath on ground floorDetails
construct one bedroom, laundry room, one storage room and one bath on ground floor | $36,000 |
| Jun 7, 2007 | Completed final sign-off Oct 2007 | 1443 19th Av | remodel kitchen and bathroom kitchen remove old cabinet stove - bathroom remove old tile bathtub sinkDetails
remodel kitchen and bathroom kitchen remove old cabinet stove - bathroom remove old tile bathtub sink | $12,000 |
| Mar 27, 2007 | Completed final sign-off Jun 2007 | 184 Trumbull St | replace 1 kitchen cabinets and new tile only in 1 bathroom.Details
replace 1 kitchen cabinets and new tile only in 1 bathroom. | $6,000 |
| Dec 15, 2006 | Completed final sign-off May 2007 | 187 Foote Av | add one bedroom, playroom and full bath on ground floor per plan.Details
add one bedroom, playroom and full bath on ground floor per plan. | $20,000 |
| Jul 12, 2006 | Completed final sign-off Feb 2007 | 1451 31st Av | remodel 1st floor of existing building-2 bathrooms, 2 bedrooms.Details
remodel 1st floor of existing building-2 bathrooms, 2 bedrooms. | $40,000 |
| Jun 14, 2006 | Completed final sign-off Dec 2006 | 185 Shawnee Av | groujd floor addition ofk new family room, den, bathroom, and storage space. provide fire rted gyop. board construction at property line and bettween garage and living spaceDetails
groujd floor addition ofk new family room, den, bathroom, and storage space. provide fire rted gyop. board construction at property line and bettween garage and living space | $37,000 |