K T Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Jan 2010
- Last 24 months
- 0 permits filed
25 permits since 2000: 23 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2010 | Completed final sign-off Jul 2010 | 96 Sylvan Dr | remove existing roof on portion of garage. install (n) balcony on top of garage roof ( approx 104 sqft). legalize (e) full bathroom at basement/ garage floorDetails
remove existing roof on portion of garage. install (n) balcony on top of garage roof ( approx 104 sqft). legalize (e) full bathroom at basement/ garage floor | $13,800 |
| Aug 11, 2009 | Never finaled issued Aug 2009, no final | 739 16th Av | remove old sheetrock on ground floor only. no other work ot be done. remove 100 sq ft. for investigation only. other permit is required to restall the gyp.Details
remove old sheetrock on ground floor only. no other work ot be done. remove 100 sq ft. for investigation only. other permit is required to restall the gyp. | $900 |
| Jan 20, 2009 | Completed final sign-off Mar 2009 | 666 29th Av | remodel kitchen & bathroom on 2nd floor. upgrade panel bar. & upgarde water line to copper pipe. no structural work. replace supply duct for existing furnace.Details
remodel kitchen & bathroom on 2nd floor. upgrade panel bar. & upgarde water line to copper pipe. no structural work. replace supply duct for existing furnace. | $35,000 |
| Jan 13, 2009 | Completed final sign-off May 2009 | 1342 39th Av | remodel ground floor to have 2 bedrooms, 1 full bathroom, 1 family room & 1 storage room. install new gas furnace, water heater & laundry in garage. 2nd floor to remodel kitchen with new cabinets, countertops & fixtures. remodel 2 full bathrooms with new wall, fixtrues & finishes.Details
remodel ground floor to have 2 bedrooms, 1 full bathroom, 1 family room & 1 storage room. install new gas furnace, water heater & laundry in garage. 2nd floor to remodel kitchen with new cabinets, countertops & fixtures. remodel 2 full bathrooms with new wall, fixtrues & finishes. | $53,000 |
| Sep 22, 2008 | Completed final sign-off Jan 2009 | 136 Moneta Wy | remodel ground floor to include 2 bedrooms, 1 full bath, 3 storge rooms, and hallway. relocate existing gas, furnace, water heater and laundry sink in garage. enlarge 2 rear windows.Details
remodel ground floor to include 2 bedrooms, 1 full bath, 3 storge rooms, and hallway. relocate existing gas, furnace, water heater and laundry sink in garage. enlarge 2 rear windows. | $38,000 |
| Aug 15, 2008 | Completed final sign-off Feb 2009 | 261 27th Av | replace old 1 kitche cabinet and old tile . in 1 bathroom in apt #8. no change to wall windows or door.Details
replace old 1 kitche cabinet and old tile . in 1 bathroom in apt #8. no change to wall windows or door. | $17,000 |
| Mar 25, 2008 | Completed final sign-off Apr 2008 | 1938 11th Av | renew pa# 2006/01/27/3213, pa# 2006/03/14/6680 & pa# 2006/04/21/9572 for final inspection only.Details
renew pa# 2006/01/27/3213, pa# 2006/03/14/6680 & pa# 2006/04/21/9572 for final inspection only. | |
| Mar 17, 2008 | Completed final sign-off May 2008 | 2674 45th Av | convert ex. storage on the ground floor into 2 bedrooms and 1 bathroom upgrade windows in the rear, 1hr rated walls and install r13 insulation in exterior walls. install smoke detectors in 2nd floor and 200sq in ventilation for garage.Details
convert ex. storage on the ground floor into 2 bedrooms and 1 bathroom upgrade windows in the rear, 1hr rated walls and install r13 insulation in exterior walls. install smoke detectors in 2nd floor and 200sq in ventilation for garage. | $38,000 |
| Mar 3, 2008 | Never finaled issued Mar 2008, no final | 2674 45th Av | remove sheet rock on ground floor in room and bathroom remodel. to be done under seperate permit.Details
remove sheet rock on ground floor in room and bathroom remodel. to be done under seperate permit. | $450 |
| Nov 28, 2007 | Completed final sign-off Jan 2008 | 5322 Geary Bl | replace broken tile on floor. patch up holes in walls. in kitchen area of restaurant.Details
replace broken tile on floor. patch up holes in walls. in kitchen area of restaurant. | $11,000 |
| Oct 16, 2007 | Completed final sign-off Jan 2009 | 1471 31st Av | construct one bedroom, laundry room, one storage room and one bath on ground floorDetails
construct one bedroom, laundry room, one storage room and one bath on ground floor | $36,000 |
| Aug 17, 2007 | Completed final sign-off Oct 2007 | 2249 Irving St | install walk-in cooler at rear yard.Details
install walk-in cooler at rear yard. | $4,000 |
| Jun 7, 2007 | Completed final sign-off Oct 2007 | 1443 19th Av | remodel kitchen and bathroom kitchen remove old cabinet stove - bathroom remove old tile bathtub sinkDetails
remodel kitchen and bathroom kitchen remove old cabinet stove - bathroom remove old tile bathtub sink | $12,000 |
| Mar 27, 2007 | Completed final sign-off Jun 2007 | 184 Trumbull St | replace 1 kitchen cabinets and new tile only in 1 bathroom.Details
replace 1 kitchen cabinets and new tile only in 1 bathroom. | $6,000 |
| Mar 5, 2007 | Completed final sign-off Oct 2007 | 4476 Mission St | revised 1/f plan to approved appl#200611077124 and provide steel beam for the wall be removed.Details
revised 1/f plan to approved appl#200611077124 and provide steel beam for the wall be removed. | $8,000 |
| Dec 15, 2006 | Completed final sign-off May 2007 | 187 Foote Av | add one bedroom, playroom and full bath on ground floor per plan.Details
add one bedroom, playroom and full bath on ground floor per plan. | $20,000 |
| Nov 7, 2006 | Completed final sign-off Oct 2007 | 4476 Mission St | tenant improvements for an existing restaurant, work includes upgrade ktichen and seating areas, provide accessible restroom and entrance to comply with accessibility requirements. add hood to kitchen (type i).Details
tenant improvements for an existing restaurant, work includes upgrade ktichen and seating areas, provide accessible restroom and entrance to comply with accessibility requirements. add hood to kitchen (type i). | $62,000 |
| Jul 12, 2006 | Completed final sign-off Feb 2007 | 1451 31st Av | remodel 1st floor of existing building-2 bathrooms, 2 bedrooms.Details
remodel 1st floor of existing building-2 bathrooms, 2 bedrooms. | $40,000 |
| Jun 14, 2006 | Completed final sign-off Dec 2006 | 185 Shawnee Av | groujd floor addition ofk new family room, den, bathroom, and storage space. provide fire rted gyop. board construction at property line and bettween garage and living spaceDetails
groujd floor addition ofk new family room, den, bathroom, and storage space. provide fire rted gyop. board construction at property line and bettween garage and living space | $37,000 |
| Apr 1, 2004 | Completed final sign-off Apr 2004 | 5333 Anza St | renew permit 1000173, app 200307159550-for finalDetails
renew permit 1000173, app 200307159550-for final | |
| Feb 27, 2003 | Completed final sign-off Jun 2003 | 2259 28th Av | replace suco 350 sqf. in garage door frontside. replace in kindDetails
replace suco 350 sqf. in garage door frontside. replace in kind | $3,000 |
| Jul 10, 2002 | Completed final sign-off Aug 2002 | 2721 Ortega St | remodel bathrm,change kitchen cabinets,install new service box & repl fixtureDetails
remodel bathrm,change kitchen cabinets,install new service box & repl fixture | $5,500 |
| Mar 26, 2002 | Completed final sign-off May 2002 | 348 Scott St | kitchen remodel:remove e kitchen cabinets,appliances, plumbing,framing,gas line,replaceDetails
kitchen remodel:remove e kitchen cabinets,appliances, plumbing,framing,gas line,replace | $10,000 |
| Feb 20, 2002 | Completed final sign-off Mar 2002 | 3670 17th St | replace cabinet, sink, faucet in 1st floor kitchen. no change in walls and no structural work.Details
replace cabinet, sink, faucet in 1st floor kitchen. no change in walls and no structural work. | $5,000 |
| Jun 28, 2000 | Completed final sign-off Sep 2000 | 1743 17th Av | repair front side stucco on 1st floor, repair in kindDetails
repair front side stucco on 1st floor, repair in kind | $3,000 |