K J Woods Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Jul 2026
- Last 24 months
- 1 permit filed
31 permits since 2000: 15 completed, 4 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 4 are 5 to 10 years old, 5 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 never finaled. Typically 773 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2021 | Never finaled filed Mar 2021, never issued | 2230 Washington St | rear horizontal addition @(e) 3rd fl not to exceed 45% rear yard setback. (n) roof deck over (n) addition w/access skylight. reconfig (e) interior w/ (n) cond. area @ 1st fl including repositioning garage door & (n) entry @ 1st flDetails
rear horizontal addition @(e) 3rd fl not to exceed 45% rear yard setback. (n) roof deck over (n) addition w/access skylight. reconfig (e) interior w/ (n) cond. area @ 1st fl including repositioning garage door & (n) entry @ 1st fl | $265,000 |
| Dec 27, 2013 | Never finaled issued Feb 2016, no final | 35 Belgrave Av | lower (e) garage slab by approx 3' & adjust slope of driveway. frame (n) floor above garage & connect to (e) storage. finish & insulate space/convert to habitable (+902 sf). reconfigure upper fl/remodel kitchen, add front bay windows & roof deck.Details
lower (e) garage slab by approx 3' & adjust slope of driveway. frame (n) floor above garage & connect to (e) storage. finish & insulate space/convert to habitable (+902 sf). reconfigure upper fl/remodel kitchen, add front bay windows & roof deck. | $625,000 |