Back to bathroom remodel contractors
K J Woods Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Jul 2026
- Last 24 months
- 1 permit filed
31 permits since 2000: 15 completed, 4 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 4 are 5 to 10 years old, 5 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 4 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 3, 2015 | Completed final sign-off Aug 2016 | 1747 39th Av | soft demo interior to studs: insulate; add 5/8" sheetrock. install new windows. (pairs of 4-light wood sash at front) wood or vinyl elsewhere. kitchen and bath remodel and new floors.Details
soft demo interior to studs: insulate; add 5/8" sheetrock. install new windows. (pairs of 4-light wood sash at front) wood or vinyl elsewhere. kitchen and bath remodel and new floors. | $58,000 |
| Apr 1, 2015 | Completed final sign-off Apr 2015 | 1410 Stanyan St | revision to 201411262659. add bathroom on bottom floor. split existing den into smaller den and media room.Details
revision to 201411262659. add bathroom on bottom floor. split existing den into smaller den and media room. | $10,000 |