Back to kitchen remodel contractors
K J Woods Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Jul 2026
- Last 24 months
- 1 permit filed
31 permits since 2000: 15 completed, 4 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 4 are 5 to 10 years old, 5 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 275 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2018 | Expired or cancelled expired Jun 2026 | 1222 Funston Av | replace kitchen w/new kitchen cabinets, countertops, tile floor , replace less than 50% of front steps. replace in-kind less than 50%Details
replace kitchen w/new kitchen cabinets, countertops, tile floor , replace less than 50% of front steps. replace in-kind less than 50% | $6,000 |
| Aug 17, 2017 | Completed final sign-off May 2018 | 182 32nd Av | to demo and install new kitchen. remodel kitchen. no structural work. same configurationDetails
to demo and install new kitchen. remodel kitchen. no structural work. same configuration | $3,000 |
| Nov 3, 2015 | Completed final sign-off Aug 2016 | 1747 39th Av | soft demo interior to studs: insulate; add 5/8" sheetrock. install new windows. (pairs of 4-light wood sash at front) wood or vinyl elsewhere. kitchen and bath remodel and new floors.Details
soft demo interior to studs: insulate; add 5/8" sheetrock. install new windows. (pairs of 4-light wood sash at front) wood or vinyl elsewhere. kitchen and bath remodel and new floors. | $58,000 |
| Dec 27, 2013 | Never finaled issued Feb 2016, no final | 35 Belgrave Av | lower (e) garage slab by approx 3' & adjust slope of driveway. frame (n) floor above garage & connect to (e) storage. finish & insulate space/convert to habitable (+902 sf). reconfigure upper fl/remodel kitchen, add front bay windows & roof deck.Details
lower (e) garage slab by approx 3' & adjust slope of driveway. frame (n) floor above garage & connect to (e) storage. finish & insulate space/convert to habitable (+902 sf). reconfigure upper fl/remodel kitchen, add front bay windows & roof deck. | $625,000 |