K&H Construction Development Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2023 to Aug 2026
- Last 24 months
- 54 permits filed
67 permits since 2000: 40 completed, 23 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 5 completed, 2 in progress, 2 expired or cancelled. Typically 5 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2026 | In progress issued Aug 2026 | 2015 22nd Av | revision to 202605221810 for field conditions discovered during construction. rebuild property line wall at e lightwell due to dry rot. revise e non egresss stair to basement, re build in kind, enclose with n 1 hr walls. modify floor opening to provide head height.Details
revision to 202605221810 for field conditions discovered during construction. rebuild property line wall at e lightwell due to dry rot. revise e non egresss stair to basement, re build in kind, enclose with n 1 hr walls. modify floor opening to provide head height. | $13,333 |
| Sep 23, 2025 | Completed final sign-off Oct 2026 | 2019 San Jose Av | revision to 202509034447, in kind stair replacement at front entry. additional demo due to dry rot. mothan than 50% demo.Details
revision to 202509034447, in kind stair replacement at front entry. additional demo due to dry rot. mothan than 50% demo. | |
| Sep 3, 2025 | Expired or cancelled expired Oct 2026 | 2019 San Jose Av | stair repair @ front entry, due to dry rott. less than 50% replacment in-kind.Details
stair repair @ front entry, due to dry rott. less than 50% replacment in-kind. | $10,000 |
| Jun 5, 2025 | Completed final sign-off Oct 2025 | 1845 Pacific Av | revision to permit 202408088272. remove trashroom from scope of work. remodel (e) undconditioned laundry room. relocate dryers within room, new dryer vent with booster fan. lighting. exterior lighting in conveience stair.Details
revision to permit 202408088272. remove trashroom from scope of work. remodel (e) undconditioned laundry room. relocate dryers within room, new dryer vent with booster fan. lighting. exterior lighting in conveience stair. | |
| Mar 21, 2025 | Completed final sign-off Aug 2025 | 1222 43rd Av | repair (e) stair at front of house, demo less than 50%. front of house.Details
repair (e) stair at front of house, demo less than 50%. front of house. | $12,000 |
| Mar 21, 2025 | Completed final sign-off May 2025 | 116 Aptos Av | revision 202503031390 in kind front stair replacement, includes footing repair.Details
revision 202503031390 in kind front stair replacement, includes footing repair. | $375 |
| Jul 23, 2024 | Expired or cancelled expired Sep 2026 | 166 Corbett Av | new 2 car garage at grade; new roof deck above garage; rebuilt (e) wood staircaseDetails
new 2 car garage at grade; new roof deck above garage; rebuilt (e) wood staircase | $39,960 |
| Jul 16, 2024 | In progress issued Jul 2024 | 56 Gaviota Wy | electrical rewiring throughout. remove (e) k & t wiring. replace with new wiring, outlets, and switches. repair water intrusion at main entry stair. not visible from street. exploratory demo less than 50%. replace wd, sheathing as needed. new waterproofing & finishes.Details
electrical rewiring throughout. remove (e) k & t wiring. replace with new wiring, outlets, and switches. repair water intrusion at main entry stair. not visible from street. exploratory demo less than 50%. replace wd, sheathing as needed. new waterproofing & finishes. | $9,728 |
| Sep 6, 2023 | Completed final sign-off Nov 2023 | 460 Monticello St | dry rot repair at front stairs. repair work to be in-kind non-structural work. less than 50%.Details
dry rot repair at front stairs. repair work to be in-kind non-structural work. less than 50%. | $8,000 |