Back to kitchen remodel contractors
K&H Construction Development Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2023 to Aug 2026
- Last 24 months
- 54 permits filed
67 permits since 2000: 40 completed, 23 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 6 completed, 8 in progress. Typically 2 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | In progress issued Aug 2026 | 2510 36th Av | in kind bathroom and kitchen remodel, update electrical and plumbing as needed. rewire entire home.Details
in kind bathroom and kitchen remodel, update electrical and plumbing as needed. rewire entire home. | $21,240 |
| Jun 5, 2026 | In progress issued Jun 2026 | 83 Brady St | in-kind bathroom and kitchen remodel. in-kind window replacement at 2nd level. (6) six total windows, fiberglass, visible from street.Details
in-kind bathroom and kitchen remodel. in-kind window replacement at 2nd level. (6) six total windows, fiberglass, visible from street. | $38,952 |
| Jun 3, 2026 | Completed final sign-off Aug 2026 | 254 Ottawa Av | to comply with nov 202543532 to resolve upermitted work at 1st and 2nd levels. level 1 - bathroom remodel. legalize bathroom installed w/o permit, new fixtures, finishes, mep. resolve uncovered j-boxes, proper 1-hr separation. level 2 -kitchen remodel, new layout w/ fixtures, casework, finishes, mepDetails
to comply with nov 202543532 to resolve upermitted work at 1st and 2nd levels. level 1 - bathroom remodel. legalize bathroom installed w/o permit, new fixtures, finishes, mep. resolve uncovered j-boxes, proper 1-hr separation. level 2 -kitchen remodel, new layout w/ fixtures, casework, finishes, mep | $42,000 |
| May 22, 2026 | In progress issued Jun 2026 | 2015 22nd Av | demo (e) alum. skylights, roof infill and rated parapets, condition (e) light well area (+69 gsf (n)+4 skylights, (n) parlor room, lighting, finishes and electrical, kitchen and bathroom remodel (n) layuots, replace tanked wh with (n) tankless gas wh, replace (e)hvac with (n) furnace ahu,Details
demo (e) alum. skylights, roof infill and rated parapets, condition (e) light well area (+69 gsf (n)+4 skylights, (n) parlor room, lighting, finishes and electrical, kitchen and bathroom remodel (n) layuots, replace tanked wh with (n) tankless gas wh, replace (e)hvac with (n) furnace ahu, | $73,000 |
| Dec 19, 2025 | In progress issued Feb 2026 | 329 Elsie St | 1st relocate /new kitchen, 100 sf of infill addition 2nd new master bath and walk in closet addition + 118 sf new roof at 2nd level.Details
1st relocate /new kitchen, 100 sf of infill addition 2nd new master bath and walk in closet addition + 118 sf new roof at 2nd level. | $96,000 |
| Dec 10, 2025 | Completed final sign-off Mar 2026 | 220 Granville Wy | interior remodel to bathroom and kitchen , rewire at all levels, no exterior changes. no structural . non load bearing walls onlyDetails
interior remodel to bathroom and kitchen , rewire at all levels, no exterior changes. no structural . non load bearing walls only | $50,000 |
| Oct 15, 2025 | In progress issued Oct 2025 | 120 Seal Rock Dr | work for 122 seal rock drive: remodel kitchen and bathroom in-kind.Details
work for 122 seal rock drive: remodel kitchen and bathroom in-kind. | $15,000 |
| Oct 7, 2025 | Completed final sign-off Jan 2026 | 2040 Sutter St | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $15,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 156 Tucker Av | complete bathroom remodel like for like, kitchen remodel like for like, no walls or layout changes, shower pan, replaing 7 windows all around the house, dual panel vinyl, not street facing.u<=0.30Details
complete bathroom remodel like for like, kitchen remodel like for like, no walls or layout changes, shower pan, replaing 7 windows all around the house, dual panel vinyl, not street facing.u<=0.30 | $46,900 |
| Apr 1, 2025 | In progress issued Apr 2025 | 1 Buena Vista Ave East Av | rev to pa# 2025-0116-8509: bathroom and kitchen reconfigure bathroom layout, add dryer appliance and built in fridge cooler in kitchen cabinetDetails
rev to pa# 2025-0116-8509: bathroom and kitchen reconfigure bathroom layout, add dryer appliance and built in fridge cooler in kitchen cabinet | $25,000 |
| Mar 14, 2025 | Completed final sign-off Apr 2025 | 355 01st St | unit 404: new kitchen cabinets replace in kind. new lighting shall comply with cec 150.0 (k)3.Details
unit 404: new kitchen cabinets replace in kind. new lighting shall comply with cec 150.0 (k)3. | $15,000 |
| Jan 16, 2025 | In progress issued Jan 2025 | 1 Buena Vista Ave East Av | unit 1a- interior remodeling and complete (n) flooring. 1009 sf and kitchen remodeling remove and replace cabinet and appliances. (n) configuratoin 166sf affected. bathroom remodel (n) configuration (n) partition wall between bathroom and kitchen 22sf taken from kitchen in order to provide wet areaDetails
unit 1a- interior remodeling and complete (n) flooring. 1009 sf and kitchen remodeling remove and replace cabinet and appliances. (n) configuratoin 166sf affected. bathroom remodel (n) configuration (n) partition wall between bathroom and kitchen 22sf taken from kitchen in order to provide wet area | $29,400 |
| Aug 21, 2023 | Completed final sign-off May 2024 | 209 Hazelwood Av | remove kitchen window stucco over existing opening, resized kitchen windows with 3 window replacements with wood materialDetails
remove kitchen window stucco over existing opening, resized kitchen windows with 3 window replacements with wood material | $10,000 |
| Jul 27, 2023 | Completed final sign-off Apr 2024 | 209 Hazelwood Av | complete one kitchen remodel like for like, no walls/ layout changes.Details
complete one kitchen remodel like for like, no walls/ layout changes. | $15,000 |