Back to bathroom remodel contractors
K&H Construction Development Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2023 to Aug 2026
- Last 24 months
- 54 permits filed
67 permits since 2000: 40 completed, 23 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
33 bathroom remodel permits: 18 completed, 14 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | In progress issued Aug 2026 | 2510 36th Av | in kind bathroom and kitchen remodel, update electrical and plumbing as needed. rewire entire home.Details
in kind bathroom and kitchen remodel, update electrical and plumbing as needed. rewire entire home. | $21,240 |
| Jun 5, 2026 | In progress issued Jun 2026 | 83 Brady St | in-kind bathroom and kitchen remodel. in-kind window replacement at 2nd level. (6) six total windows, fiberglass, visible from street.Details
in-kind bathroom and kitchen remodel. in-kind window replacement at 2nd level. (6) six total windows, fiberglass, visible from street. | $38,952 |
| Jun 3, 2026 | Completed final sign-off Aug 2026 | 254 Ottawa Av | to comply with nov 202543532 to resolve upermitted work at 1st and 2nd levels. level 1 - bathroom remodel. legalize bathroom installed w/o permit, new fixtures, finishes, mep. resolve uncovered j-boxes, proper 1-hr separation. level 2 -kitchen remodel, new layout w/ fixtures, casework, finishes, mepDetails
to comply with nov 202543532 to resolve upermitted work at 1st and 2nd levels. level 1 - bathroom remodel. legalize bathroom installed w/o permit, new fixtures, finishes, mep. resolve uncovered j-boxes, proper 1-hr separation. level 2 -kitchen remodel, new layout w/ fixtures, casework, finishes, mep | $42,000 |
| May 22, 2026 | In progress issued Jun 2026 | 2015 22nd Av | demo (e) alum. skylights, roof infill and rated parapets, condition (e) light well area (+69 gsf (n)+4 skylights, (n) parlor room, lighting, finishes and electrical, kitchen and bathroom remodel (n) layuots, replace tanked wh with (n) tankless gas wh, replace (e)hvac with (n) furnace ahu,Details
demo (e) alum. skylights, roof infill and rated parapets, condition (e) light well area (+69 gsf (n)+4 skylights, (n) parlor room, lighting, finishes and electrical, kitchen and bathroom remodel (n) layuots, replace tanked wh with (n) tankless gas wh, replace (e)hvac with (n) furnace ahu, | $73,000 |
| May 19, 2026 | Completed final sign-off Jul 2026 | 1507 18th Av | interior remodel 2nd level only. no exterior changes, nonstructural work include. bath remodel: remove e shower, replace e tub, w/combo, nw bathroom layout & fixtures, nw finishes, lighting, electrical & fan. powder room: replace e swing door w/pocket slider door, replace e vanity sink. nw finishesDetails
interior remodel 2nd level only. no exterior changes, nonstructural work include. bath remodel: remove e shower, replace e tub, w/combo, nw bathroom layout & fixtures, nw finishes, lighting, electrical & fan. powder room: replace e swing door w/pocket slider door, replace e vanity sink. nw finishes | $35,000 |
| Apr 14, 2026 | Completed final sign-off Jun 2026 | 130 Landers St | unit g: like for like bathroom remodel, m.e.p. staying in the same location, (e) tub to be replace by another tubDetails
unit g: like for like bathroom remodel, m.e.p. staying in the same location, (e) tub to be replace by another tub | $10,000 |
| Mar 4, 2026 | Completed final sign-off May 2026 | 5160 Diamond Heights Bl | unit#305: in kind bathroom remodel, new fixtures, finishes, no changes to layout, no exterir changes, no structural changesDetails
unit#305: in kind bathroom remodel, new fixtures, finishes, no changes to layout, no exterir changes, no structural changes | $10,000 |
| Feb 19, 2026 | Completed final sign-off Apr 2026 | 402 08th Av | (1) bathroom remodel, no walls, or layout changes. shower pan on the 3rd floor.Details
(1) bathroom remodel, no walls, or layout changes. shower pan on the 3rd floor. | $20,000 |
| Feb 16, 2026 | In progress issued Jun 2026 | 156 Tucker Av | first floor -garage conversion: in the existing garage install partition walls in order to provide one complete bathroom, office space, and a laundry room to the single family home. new living space 373 s.f.Details
first floor -garage conversion: in the existing garage install partition walls in order to provide one complete bathroom, office space, and a laundry room to the single family home. new living space 373 s.f. | $46,000 |
| Dec 19, 2025 | In progress issued Feb 2026 | 329 Elsie St | 1st relocate /new kitchen, 100 sf of infill addition 2nd new master bath and walk in closet addition + 118 sf new roof at 2nd level.Details
1st relocate /new kitchen, 100 sf of infill addition 2nd new master bath and walk in closet addition + 118 sf new roof at 2nd level. | $96,000 |
| Dec 16, 2025 | In progress issued Dec 2025 | 10 Abbey St | bathroom remodel, like for like including shower pan installation. no moving walls, no layout changes.Details
bathroom remodel, like for like including shower pan installation. no moving walls, no layout changes. | $20,000 |
| Dec 10, 2025 | Completed final sign-off Mar 2026 | 220 Granville Wy | interior remodel to bathroom and kitchen , rewire at all levels, no exterior changes. no structural . non load bearing walls onlyDetails
interior remodel to bathroom and kitchen , rewire at all levels, no exterior changes. no structural . non load bearing walls only | $50,000 |
| Nov 20, 2025 | In progress issued Dec 2025 | 512 Bella Vista Wy | interior remodel - convert garage area to liveable space +395 sf new bedroom, new bathroomDetails
interior remodel - convert garage area to liveable space +395 sf new bedroom, new bathroom | $96,000 |
| Oct 27, 2025 | Completed final sign-off Jan 2026 | 1359 14th Av | bathroom remodel to include ew layout, fixtures and finishes. convert tub into shower . no structural or exterior workDetails
bathroom remodel to include ew layout, fixtures and finishes. convert tub into shower . no structural or exterior work | $22,500 |
| Oct 15, 2025 | In progress issued Oct 2025 | 120 Seal Rock Dr | work for 122 seal rock drive: remodel kitchen and bathroom in-kind.Details
work for 122 seal rock drive: remodel kitchen and bathroom in-kind. | $15,000 |
| Oct 1, 2025 | Completed final sign-off Jan 2026 | 1155 Pine St | in-kind remodeling of 1 bathroom(s) in 4th fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 4th fl with 0 shower pan(s). | $10,000 |
| Sep 30, 2025 | Completed final sign-off Apr 2026 | 369 21st Av | 2nd story unit: to convert existing laundry room into new bathroom. remove existing laundry machines and replace by new stackable laundry machine in new closet. create new closet. 68 sq ft affected. in the hallway closet: to switch sink vanity & toilet. 4 recessed light in existing living room.Details
2nd story unit: to convert existing laundry room into new bathroom. remove existing laundry machines and replace by new stackable laundry machine in new closet. create new closet. 68 sq ft affected. in the hallway closet: to switch sink vanity & toilet. 4 recessed light in existing living room. | $40,000 |
| Sep 11, 2025 | Completed final sign-off Oct 2025 | 45 Hallam St | one bathroom remodel like for like, first floor, 30 sq ft, shower pan, no walls or layout changes.Details
one bathroom remodel like for like, first floor, 30 sq ft, shower pan, no walls or layout changes. | $6,900 |
| Sep 11, 2025 | In progress issued Sep 2025 | 156 Tucker Av | complete bathroom remodel like for like, kitchen remodel like for like, no walls or layout changes, shower pan, replaing 7 windows all around the house, dual panel vinyl, not street facing.u<=0.30Details
complete bathroom remodel like for like, kitchen remodel like for like, no walls or layout changes, shower pan, replaing 7 windows all around the house, dual panel vinyl, not street facing.u<=0.30 | $46,900 |
| Aug 28, 2025 | Completed final sign-off Nov 2025 | 3137 Washington St | bathroom remodel at 2nd level. new layout and interior partition to create laundry closet. new fixtures, new finishesDetails
bathroom remodel at 2nd level. new layout and interior partition to create laundry closet. new fixtures, new finishes | $22,745 |
| Jul 29, 2025 | Completed final sign-off Nov 2025 | 3741 26th St | 1 bathroom remodel like for like, 60sqft, shower pan, no walls or layout changes.Details
1 bathroom remodel like for like, 60sqft, shower pan, no walls or layout changes. | $25,000 |
| Jul 21, 2025 | Completed final sign-off Oct 2025 | 1510 25th St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| Jul 17, 2025 | In progress issued Jul 2025 | 1155 Pine St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $25,000 |
| Jul 16, 2025 | Expired or cancelled cancelled Jul 2025 | 1510 25th Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| May 30, 2025 | Completed final sign-off Oct 2025 | 72 Townsend St | #806: one master bathroom remodel like for like. upgrading all el, pl mech, shower pan. no walls or layout change. upgrade would be done and completed in the bathroom.Details
#806: one master bathroom remodel like for like. upgrading all el, pl mech, shower pan. no walls or layout change. upgrade would be done and completed in the bathroom. | $25,000 |
| Apr 23, 2025 | Completed final sign-off Jun 2026 | 130 Landers St | unit #g: one bathroom remodel like for like, shower pan 45 sqft, no walls or layout changes.Details
unit #g: one bathroom remodel like for like, shower pan 45 sqft, no walls or layout changes. | $25,000 |
| Apr 1, 2025 | In progress issued Apr 2025 | 1 Buena Vista Ave East Av | rev to pa# 2025-0116-8509: bathroom and kitchen reconfigure bathroom layout, add dryer appliance and built in fridge cooler in kitchen cabinetDetails
rev to pa# 2025-0116-8509: bathroom and kitchen reconfigure bathroom layout, add dryer appliance and built in fridge cooler in kitchen cabinet | $25,000 |
| Feb 18, 2025 | In progress issued Feb 2025 | 5122 Diamond Heights Bl | 2 bathroom remodels, in unit a, like for like, no walls or layout changes, tub to tub, and one showers pan. bathrooms are approx. 52 sq ft and 55 sq ft.Details
2 bathroom remodels, in unit a, like for like, no walls or layout changes, tub to tub, and one showers pan. bathrooms are approx. 52 sq ft and 55 sq ft. | $15,800 |
| Feb 4, 2025 | Completed final sign-off Apr 2025 | 1918 17th Av | bathroom remodel replace tub for showerDetails
bathroom remodel replace tub for shower | $25,000 |
| Jan 16, 2025 | In progress issued Jan 2025 | 1 Buena Vista Ave East Av | unit 1a- interior remodeling and complete (n) flooring. 1009 sf and kitchen remodeling remove and replace cabinet and appliances. (n) configuratoin 166sf affected. bathroom remodel (n) configuration (n) partition wall between bathroom and kitchen 22sf taken from kitchen in order to provide wet areaDetails
unit 1a- interior remodeling and complete (n) flooring. 1009 sf and kitchen remodeling remove and replace cabinet and appliances. (n) configuratoin 166sf affected. bathroom remodel (n) configuration (n) partition wall between bathroom and kitchen 22sf taken from kitchen in order to provide wet area | $29,400 |
| Dec 18, 2024 | Completed final sign-off Apr 2025 | 85 Brady St | unit #5: one complete bathroom remodel like for like, no walls or layout changes, shower panDetails
unit #5: one complete bathroom remodel like for like, no walls or layout changes, shower pan | $20,000 |
| Dec 18, 2024 | Completed final sign-off Apr 2025 | 85 Brady St | unit #6: one bathroom remodel like for like, no walls or layout changes, shower panDetails
unit #6: one bathroom remodel like for like, no walls or layout changes, shower pan | $20,000 |
| Sep 26, 2024 | In progress issued Oct 2024 | 56 Gaviota Wy | ground fl to convert 274 sf of e) garage space to conditioned area included new non-structural interior partition to add mudroom/laundry, home office, full bath remodel. new center hvac system, new tankless water heaterDetails
ground fl to convert 274 sf of e) garage space to conditioned area included new non-structural interior partition to add mudroom/laundry, home office, full bath remodel. new center hvac system, new tankless water heater | $62,250 |