Back to kitchen remodel contractors
K C Home Improvement Const Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Nov 2015
- Last 24 months
- 0 permits filed
22 permits since 2000: 19 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 never finaled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2015 | Completed final sign-off Jun 2016 | 169 Whipple Av | kitchen & bathroom remodeling. replace cabinet, countertop sink. bathroom change tub, sink, toilet & new tile.Details
kitchen & bathroom remodeling. replace cabinet, countertop sink. bathroom change tub, sink, toilet & new tile. | $35,500 |
| Jan 22, 2014 | Never finaled issued Jan 2014, no final | 1987 Palou Av | remove & replace tile kitchen countertop. replace kitchen tile floor. (e) cabinets to remain.Details
remove & replace tile kitchen countertop. replace kitchen tile floor. (e) cabinets to remain. | $4,000 |
| Nov 18, 2013 | Never finaled issued Nov 2013, no final | 138 Maynard St | replace kitchen counter top and tile floor. replace water damage sheet rock at garage around 100 sq ft.Details
replace kitchen counter top and tile floor. replace water damage sheet rock at garage around 100 sq ft. | $9,000 |
| Oct 11, 2011 | Completed final sign-off Dec 2011 | 2609 Irving St | remodel upstair bathroom, remodel kitchen and replacing windows, 1 at front, 11 at side & rear of house, u factor =0.4, provide high efficacy lighting.Details
remodel upstair bathroom, remodel kitchen and replacing windows, 1 at front, 11 at side & rear of house, u factor =0.4, provide high efficacy lighting. | $25,000 |
| Apr 28, 2010 | Completed final sign-off Mar 2011 | 101 France Av | remodel upstair kitchenDetails
remodel upstair kitchen | $6,000 |
| Jul 10, 2008 | Completed final sign-off Aug 2008 | 2647 Irving St | change kitchen cabinets, new flooring and new counter top. 50% of kitchen light watt must be fluroescent light.Details
change kitchen cabinets, new flooring and new counter top. 50% of kitchen light watt must be fluroescent light. | $7,000 |