Back to bathroom remodel contractors
K C Home Improvement Const Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Nov 2015
- Last 24 months
- 0 permits filed
22 permits since 2000: 19 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2015 | Completed final sign-off Jun 2016 | 169 Whipple Av | kitchen & bathroom remodeling. replace cabinet, countertop sink. bathroom change tub, sink, toilet & new tile.Details
kitchen & bathroom remodeling. replace cabinet, countertop sink. bathroom change tub, sink, toilet & new tile. | $35,500 |
| Jan 29, 2014 | Completed final sign-off Apr 2014 | 9 Lafayette St | #3 bathroom remodel- demo & remodle of master bathroom on top floor of condo, sink plumbing will be shifted from one location to another, 3 feet wall extension to enlarge bathroom space, circuit breaker will be moved wiht 3 ft wall extension.Details
#3 bathroom remodel- demo & remodle of master bathroom on top floor of condo, sink plumbing will be shifted from one location to another, 3 feet wall extension to enlarge bathroom space, circuit breaker will be moved wiht 3 ft wall extension. | $15,000 |
| Oct 11, 2011 | Completed final sign-off Dec 2011 | 2609 Irving St | remodel upstair bathroom, remodel kitchen and replacing windows, 1 at front, 11 at side & rear of house, u factor =0.4, provide high efficacy lighting.Details
remodel upstair bathroom, remodel kitchen and replacing windows, 1 at front, 11 at side & rear of house, u factor =0.4, provide high efficacy lighting. | $25,000 |
| May 24, 2010 | Completed final sign-off Aug 2010 | 75 Tucker Av | comply w/complaint #201045401 to legaslize two bedrooms, one full bathroom., storage area at ground floor.Details
comply w/complaint #201045401 to legaslize two bedrooms, one full bathroom., storage area at ground floor. | $28,000 |
| Aug 12, 2009 | Completed final sign-off Nov 2009 | 1762 18th Av | 1 new bedroom, bathroom, office, and storage room to be constructed at ground floorDetails
1 new bedroom, bathroom, office, and storage room to be constructed at ground floor | $40,000 |
| Jul 10, 2009 | Completed final sign-off Sep 2009 | 111 04th Av | unit 111: remodel bathroom. moving toilet within 2 feet and change tub to 1/4 round standing shower and replace exhaust fan. provide high efficacy lights or manual exhaust fan.Details
unit 111: remodel bathroom. moving toilet within 2 feet and change tub to 1/4 round standing shower and replace exhaust fan. provide high efficacy lights or manual exhaust fan. | $9,000 |
| Aug 26, 2008 | Completed final sign-off Mar 2009 | 115 Knollview Wy | develop garage floor area, new family room, laundry room & full bathroom. modify rear door & window, reconfigure stairs.Details
develop garage floor area, new family room, laundry room & full bathroom. modify rear door & window, reconfigure stairs. | $33,000 |
| Oct 16, 2007 | Completed final sign-off Feb 2008 | 36 Concord St | construct one bedroom, one study room, one laudry room and two bath rooms on ground floorDetails
construct one bedroom, one study room, one laudry room and two bath rooms on ground floor | $50,000 |