K C Home Improvement Const Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Nov 2015
- Last 24 months
- 0 permits filed
22 permits since 2000: 19 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2015 | Completed final sign-off Jun 2016 | 169 Whipple Av | kitchen & bathroom remodeling. replace cabinet, countertop sink. bathroom change tub, sink, toilet & new tile.Details
kitchen & bathroom remodeling. replace cabinet, countertop sink. bathroom change tub, sink, toilet & new tile. | $35,500 |
| Jul 28, 2014 | Completed final sign-off Sep 2014 | 445 Cambridge St | revision to pa#201407080747. one fiberglass window at front instead of wood. u=0.4 maxDetails
revision to pa#201407080747. one fiberglass window at front instead of wood. u=0.4 max | |
| Jul 8, 2014 | Completed final sign-off Sep 2014 | 445 Cambridge St | replace front window with fiberglass wood clad window. repair dry rot siding in front of house (approx. 150 sf)Details
replace front window with fiberglass wood clad window. repair dry rot siding in front of house (approx. 150 sf) | $4,500 |
| Feb 21, 2014 | Completed final sign-off Aug 2014 | 1915 11th Av | build new deck & stair at rear of house. replace single pnae windows (2) w/double pane sliders, insulate rear wall, new deck lighting.Details
build new deck & stair at rear of house. replace single pnae windows (2) w/double pane sliders, insulate rear wall, new deck lighting. | $20,000 |
| Jan 29, 2014 | Completed final sign-off Apr 2014 | 9 Lafayette St | #3 bathroom remodel- demo & remodle of master bathroom on top floor of condo, sink plumbing will be shifted from one location to another, 3 feet wall extension to enlarge bathroom space, circuit breaker will be moved wiht 3 ft wall extension.Details
#3 bathroom remodel- demo & remodle of master bathroom on top floor of condo, sink plumbing will be shifted from one location to another, 3 feet wall extension to enlarge bathroom space, circuit breaker will be moved wiht 3 ft wall extension. | $15,000 |
| Jan 22, 2014 | Never finaled issued Jan 2014, no final | 1987 Palou Av | remove & replace tile kitchen countertop. replace kitchen tile floor. (e) cabinets to remain.Details
remove & replace tile kitchen countertop. replace kitchen tile floor. (e) cabinets to remain. | $4,000 |
| Nov 18, 2013 | Never finaled issued Nov 2013, no final | 138 Maynard St | replace kitchen counter top and tile floor. replace water damage sheet rock at garage around 100 sq ft.Details
replace kitchen counter top and tile floor. replace water damage sheet rock at garage around 100 sq ft. | $9,000 |
| Aug 6, 2013 | Completed final sign-off Mar 2014 | 773 Pine St | new windows, fiberglass front windows, vinyl elsewhere. replace all pine st front facade windows in kind. approx 40 windowsDetails
new windows, fiberglass front windows, vinyl elsewhere. replace all pine st front facade windows in kind. approx 40 windows | $12,000 |
| Oct 22, 2012 | Never finaled issued Oct 2012, no final | 1325 Thomas Av | repair 250 sq ft at dryrot rear siding.Details
repair 250 sq ft at dryrot rear siding. | $2,800 |
| Aug 3, 2012 | Completed final sign-off Feb 2013 | 122 Ney St | new study rm. storage rm. bathrm. laundry & circulating area to be constructed at ground flr. per plan.Details
new study rm. storage rm. bathrm. laundry & circulating area to be constructed at ground flr. per plan. | $38,000 |
| Nov 29, 2011 | Completed final sign-off Nov 2012 | 431 Athens St | replacing front (6) windows, same size and location u = .40 maxDetails
replacing front (6) windows, same size and location u = .40 max | $2,000 |
| Oct 28, 2011 | Completed final sign-off Apr 2012 | 480 Teresita Bl | replacing glass and windows, visible from street. 40 windows total. commerical aluminum. same size, same location. no windows in bedroom allowed on this permit.Details
replacing glass and windows, visible from street. 40 windows total. commerical aluminum. same size, same location. no windows in bedroom allowed on this permit. | $20,000 |
| Oct 11, 2011 | Completed final sign-off Dec 2011 | 2609 Irving St | remodel upstair bathroom, remodel kitchen and replacing windows, 1 at front, 11 at side & rear of house, u factor =0.4, provide high efficacy lighting.Details
remodel upstair bathroom, remodel kitchen and replacing windows, 1 at front, 11 at side & rear of house, u factor =0.4, provide high efficacy lighting. | $25,000 |
| Oct 14, 2010 | Completed final sign-off Oct 2010 | 716 Tehama St | demolish (e) non-bearing partition approx. 32 lin. ft. that was constructed without a bldg. permit, patch/paint as needed. no bearing wall in residential portion of bldg.Details
demolish (e) non-bearing partition approx. 32 lin. ft. that was constructed without a bldg. permit, patch/paint as needed. no bearing wall in residential portion of bldg. | $5,000 |
| May 24, 2010 | Completed final sign-off Aug 2010 | 75 Tucker Av | comply w/complaint #201045401 to legaslize two bedrooms, one full bathroom., storage area at ground floor.Details
comply w/complaint #201045401 to legaslize two bedrooms, one full bathroom., storage area at ground floor. | $28,000 |
| Apr 28, 2010 | Completed final sign-off Mar 2011 | 101 France Av | remodel upstair kitchenDetails
remodel upstair kitchen | $6,000 |
| Apr 26, 2010 | Completed final sign-off May 2010 | 378 Edinburgh St | repair 2 floor joist, 2 stair step and 6 guard rail on a extg old deck. repaint the deckDetails
repair 2 floor joist, 2 stair step and 6 guard rail on a extg old deck. repaint the deck | $2,000 |
| Aug 12, 2009 | Completed final sign-off Nov 2009 | 1762 18th Av | 1 new bedroom, bathroom, office, and storage room to be constructed at ground floorDetails
1 new bedroom, bathroom, office, and storage room to be constructed at ground floor | $40,000 |
| Jul 10, 2009 | Completed final sign-off Sep 2009 | 111 04th Av | unit 111: remodel bathroom. moving toilet within 2 feet and change tub to 1/4 round standing shower and replace exhaust fan. provide high efficacy lights or manual exhaust fan.Details
unit 111: remodel bathroom. moving toilet within 2 feet and change tub to 1/4 round standing shower and replace exhaust fan. provide high efficacy lights or manual exhaust fan. | $9,000 |
| Aug 26, 2008 | Completed final sign-off Mar 2009 | 115 Knollview Wy | develop garage floor area, new family room, laundry room & full bathroom. modify rear door & window, reconfigure stairs.Details
develop garage floor area, new family room, laundry room & full bathroom. modify rear door & window, reconfigure stairs. | $33,000 |
| Jul 10, 2008 | Completed final sign-off Aug 2008 | 2647 Irving St | change kitchen cabinets, new flooring and new counter top. 50% of kitchen light watt must be fluroescent light.Details
change kitchen cabinets, new flooring and new counter top. 50% of kitchen light watt must be fluroescent light. | $7,000 |
| Oct 16, 2007 | Completed final sign-off Feb 2008 | 36 Concord St | construct one bedroom, one study room, one laudry room and two bath rooms on ground floorDetails
construct one bedroom, one study room, one laudry room and two bath rooms on ground floor | $50,000 |