Jwl 888 Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Sep 2026
- Last 24 months
- 35 permits filed
61 permits since 2000: 31 completed, 23 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
12 stairs permits: 4 completed, 6 in progress, 1 never finaled, 1 expired or cancelled. Typically 42 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 487 16th Av | repair front staircase, in kind, less than 50%, facing the street.Details
repair front staircase, in kind, less than 50%, facing the street. | $5,000 |
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 565 28th St | 565-567 28th st: 1/f convert (e) storage to living space (3 bed/3bath, living room).add interior stairs to 2/f.rebuild ground level deck.2/f convert bedroom to dining room, remodel (e) kitchen, add interior stairs to 1/f.rebuild 2nd level deck. 3/f no work.comply with nov 202427829 & 201895475.Details
565-567 28th st: 1/f convert (e) storage to living space (3 bed/3bath, living room).add interior stairs to 2/f.rebuild ground level deck.2/f convert bedroom to dining room, remodel (e) kitchen, add interior stairs to 1/f.rebuild 2nd level deck. 3/f no work.comply with nov 202427829 & 201895475. | $250,000 |
| May 21, 2026 | In progress issued May 2026 | 34 Jules Av | front stair repair less than 50% repair, street facing - inkind replacment of materials (concrete to concrete).Details
front stair repair less than 50% repair, street facing - inkind replacment of materials (concrete to concrete). | $5,000 |
| Nov 26, 2025 | In progress issued Mar 2026 | 611 40th Av | 2nd fl - shift interior stair toward the front of bldg; remove stairs in lightwell; reconstruct balcony in sunroom. ground fl - infill open space below (e) sunroom to create indoor plant add family room w/kitchenette (2 burner), full bath, exercise room & laundry area; add detached gazebo with ofuroDetails
2nd fl - shift interior stair toward the front of bldg; remove stairs in lightwell; reconstruct balcony in sunroom. ground fl - infill open space below (e) sunroom to create indoor plant add family room w/kitchenette (2 burner), full bath, exercise room & laundry area; add detached gazebo with ofuro | $150,000 |
| Oct 24, 2025 | In progress issued Oct 2025 | 569 28th St | 1/f: convert (e) storage to living space (2 bed, 2 bath, media room, and wet bar), 764 sq ft. rebuild ground level deck. 2/f: remodel kitchen, reconfigure bathroom. add interior stairs to 1/f. 3/f: remodel bathroom and closet. replace front windows with all wood clad in kind. same operation. replaceDetails
1/f: convert (e) storage to living space (2 bed, 2 bath, media room, and wet bar), 764 sq ft. rebuild ground level deck. 2/f: remodel kitchen, reconfigure bathroom. add interior stairs to 1/f. 3/f: remodel bathroom and closet. replace front windows with all wood clad in kind. same operation. replace | $240,000 |
| Sep 12, 2025 | Completed final sign-off Jan 2026 | 93 Uranus Tr | waterproofing existing deck. new habitable space below-add rear portion. new full bathroom. modify bottom of existing stair adding a landing platform. rear patio door at level 1 shall not have a lock for means of egress from new basement room back into the house and shall remain openable at all timeDetails
waterproofing existing deck. new habitable space below-add rear portion. new full bathroom. modify bottom of existing stair adding a landing platform. rear patio door at level 1 shall not have a lock for means of egress from new basement room back into the house and shall remain openable at all time | $70,000 |
| Dec 11, 2024 | Expired or cancelled expired May 2026 | 240 Vicente St | remodel ground floor in-kind, replace damaged wood, remove & replace entire house stucco, repair from stairs less than 50%.Details
remodel ground floor in-kind, replace damaged wood, remove & replace entire house stucco, repair from stairs less than 50%. | $80,000 |
| Jun 27, 2024 | In progress issued Sep 2024 | 240 Vicente St | 2/f: existing 2 bathroom and 1 kitchen remodel. new full bathroom and powder room. change directions of stairs at rear deck.Details
2/f: existing 2 bathroom and 1 kitchen remodel. new full bathroom and powder room. change directions of stairs at rear deck. | $50,000 |
| May 10, 2024 | Completed final sign-off Jun 2025 | 366 Staples Av | rebuild (e) stair and make larger stairwell. (n) windows. add (2) bedrooms. (n) bathroom on 1st floor. replace (e) gas furance w/ heat pump system for heating and cooling air and water.Details
rebuild (e) stair and make larger stairwell. (n) windows. add (2) bedrooms. (n) bathroom on 1st floor. replace (e) gas furance w/ heat pump system for heating and cooling air and water. | $100,000 |
| Aug 1, 2023 | Completed final sign-off Sep 2024 | 68 Keystone Wy | 1st. fl. new bedroom, new 2 bathrooms, new family room, 2nd fl. new code compliant interior staircaseDetails
1st. fl. new bedroom, new 2 bathrooms, new family room, 2nd fl. new code compliant interior staircase | $30,000 |
| Jun 27, 2023 | Completed final sign-off Nov 2023 | 1379 Alabama St | to comply with complaint 202173161 replace in-kind egress stairDetails
to comply with complaint 202173161 replace in-kind egress stair | $15,000 |
| Mar 21, 2022 | Never finaled issued Aug 2023, no final | 1352 Mcallister St | the scope of work includes a rear horizontal addition to reconfigure the existing common exterior egress stairs, rebuild and expand the rear dining room area, add a half bath at unit 1352, etc.Details
the scope of work includes a rear horizontal addition to reconfigure the existing common exterior egress stairs, rebuild and expand the rear dining room area, add a half bath at unit 1352, etc. | $38,000 |