Back to kitchen remodel contractors
Jwl 888 Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Sep 2026
- Last 24 months
- 35 permits filed
61 permits since 2000: 31 completed, 23 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 10 completed, 8 in progress. Typically 3 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 565 28th St | 565-567 28th st: 1/f convert (e) storage to living space (3 bed/3bath, living room).add interior stairs to 2/f.rebuild ground level deck.2/f convert bedroom to dining room, remodel (e) kitchen, add interior stairs to 1/f.rebuild 2nd level deck. 3/f no work.comply with nov 202427829 & 201895475.Details
565-567 28th st: 1/f convert (e) storage to living space (3 bed/3bath, living room).add interior stairs to 2/f.rebuild ground level deck.2/f convert bedroom to dining room, remodel (e) kitchen, add interior stairs to 1/f.rebuild 2nd level deck. 3/f no work.comply with nov 202427829 & 201895475. | $250,000 |
| Jul 10, 2026 | In progress issued Jul 2026 | 611 40th Av | revision to 202511260478. reconfigure layout of family room, kitchenette, excercise area and full bath. relocate laundry set-up garage. relocate tankless water heater. at 2nd flr, replace (2) windoes and (1) sliding door, all facing backyard.Details
revision to 202511260478. reconfigure layout of family room, kitchenette, excercise area and full bath. relocate laundry set-up garage. relocate tankless water heater. at 2nd flr, replace (2) windoes and (1) sliding door, all facing backyard. | $6,000 |
| Nov 26, 2025 | In progress issued Mar 2026 | 611 40th Av | 2nd fl - shift interior stair toward the front of bldg; remove stairs in lightwell; reconstruct balcony in sunroom. ground fl - infill open space below (e) sunroom to create indoor plant add family room w/kitchenette (2 burner), full bath, exercise room & laundry area; add detached gazebo with ofuroDetails
2nd fl - shift interior stair toward the front of bldg; remove stairs in lightwell; reconstruct balcony in sunroom. ground fl - infill open space below (e) sunroom to create indoor plant add family room w/kitchenette (2 burner), full bath, exercise room & laundry area; add detached gazebo with ofuro | $150,000 |
| Nov 21, 2025 | In progress issued Nov 2025 | 569 28th St | revision to pa # 202510248124. replace (e) dryrot roof above kitchen (framing no reroof) level ceiling. combine window & sliding door to larger sliding door. replace (e) dryrot 2nd fl deck in kind. change 1st fl bedroom window to smaller window. add skylight & replace (e) skylight w/larger skylight.Details
revision to pa # 202510248124. replace (e) dryrot roof above kitchen (framing no reroof) level ceiling. combine window & sliding door to larger sliding door. replace (e) dryrot 2nd fl deck in kind. change 1st fl bedroom window to smaller window. add skylight & replace (e) skylight w/larger skylight. | $20,000 |
| Oct 24, 2025 | In progress issued Oct 2025 | 569 28th St | 1/f: convert (e) storage to living space (2 bed, 2 bath, media room, and wet bar), 764 sq ft. rebuild ground level deck. 2/f: remodel kitchen, reconfigure bathroom. add interior stairs to 1/f. 3/f: remodel bathroom and closet. replace front windows with all wood clad in kind. same operation. replaceDetails
1/f: convert (e) storage to living space (2 bed, 2 bath, media room, and wet bar), 764 sq ft. rebuild ground level deck. 2/f: remodel kitchen, reconfigure bathroom. add interior stairs to 1/f. 3/f: remodel bathroom and closet. replace front windows with all wood clad in kind. same operation. replace | $240,000 |
| Aug 14, 2025 | In progress issued Jan 2026 | 1356 Mcallister St | revision 202203210384 - to include the remodel of (e) kitchen and the alteration of (e) north and eastern facing windowDetails
revision 202203210384 - to include the remodel of (e) kitchen and the alteration of (e) north and eastern facing window | $50,000 |
| Jun 17, 2025 | Completed final sign-off Oct 2025 | 63 Keystone Wy | remodel (1) kitchen and (1) bathroom in kind.Details
remodel (1) kitchen and (1) bathroom in kind. | $30,000 |
| Apr 25, 2025 | Completed final sign-off Aug 2025 | 579 06th Av | remodel one kitchen and two bathrooms in kind no change to layout. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5. number of plumbing fixture count remain same.Details
remodel one kitchen and two bathrooms in kind no change to layout. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5. number of plumbing fixture count remain same. | $30,000 |
| Jan 17, 2025 | Completed final sign-off Sep 2025 | 31 Uranus Tr | remodel existing kitchen in kind.Details
remodel existing kitchen in kind. | $30,000 |
| Oct 22, 2024 | In progress issued Sep 2026 | 209 Wawona St | reconfigure/remodel 1st floor plan. relocate the office, bathroom, kitchen at 1st floor. reconfigure 2nd floor plan with 2 new bathrooms and new master bedroom at 2nd floor. a 2 story addition to the rear and side of the building of approx. 702 sq ft.Details
reconfigure/remodel 1st floor plan. relocate the office, bathroom, kitchen at 1st floor. reconfigure 2nd floor plan with 2 new bathrooms and new master bedroom at 2nd floor. a 2 story addition to the rear and side of the building of approx. 702 sq ft. | $403,000 |
| Jul 19, 2024 | Completed final sign-off Oct 2024 | 289 Baltimore Wy | remodel 1 bath & 1 kitchen on 2nd fl in kindDetails
remodel 1 bath & 1 kitchen on 2nd fl in kind | $40,000 |
| Jun 27, 2024 | In progress issued Sep 2024 | 240 Vicente St | 2/f: existing 2 bathroom and 1 kitchen remodel. new full bathroom and powder room. change directions of stairs at rear deck.Details
2/f: existing 2 bathroom and 1 kitchen remodel. new full bathroom and powder room. change directions of stairs at rear deck. | $50,000 |
| May 1, 2024 | Completed final sign-off Jan 2025 | 1459 31st Av | 1f: provide (n) wet bar. new home office and laundry. expand existing family room into corridor. upgrade electrical panel to 200 amp. 2f: remodel (e) kitchen, bathroom, and new toilet room. replace rear and side windows, skylights and doors.Details
1f: provide (n) wet bar. new home office and laundry. expand existing family room into corridor. upgrade electrical panel to 200 amp. 2f: remodel (e) kitchen, bathroom, and new toilet room. replace rear and side windows, skylights and doors. | $75,000 |
| Apr 12, 2024 | Completed final sign-off Aug 2024 | 711 09th Av | remodel (e) kitchen bring new subpanel to 2nd fl. in kind kitchen remodelDetails
remodel (e) kitchen bring new subpanel to 2nd fl. in kind kitchen remodel | $30,000 |
| Feb 23, 2024 | Completed final sign-off Jul 2024 | 2939 Harrison St | remodel one kitchen and one bathroom, same layout. add new subpanel to 3rd floor.Details
remodel one kitchen and one bathroom, same layout. add new subpanel to 3rd floor. | $25,000 |
| Feb 7, 2024 | Completed final sign-off Jul 2025 | 93 Uranus Tr | kitchen & bathroom remodel with (e) deck repair and maintenance. bathroom additon @ 2nd fl. exterior window replacement at rear only.Details
kitchen & bathroom remodel with (e) deck repair and maintenance. bathroom additon @ 2nd fl. exterior window replacement at rear only. | $120,000 |
| Oct 25, 2022 | Completed final sign-off Jan 2023 | 1260 Chestnut St | remodel kitchen and add subpanel. non structural.Details
remodel kitchen and add subpanel. non structural. | $30,000 |
| Dec 10, 2021 | Completed final sign-off Oct 2023 | 2311 09th Av | add one bedroom,one family room,one bath @ ground floor. remodel kitchen & bath @ 2nd floor.Details
add one bedroom,one family room,one bath @ ground floor. remodel kitchen & bath @ 2nd floor. | $50,888 |