Back to kitchen remodel contractors
Jv Services
- Based in
- San Ramon
- On San Francisco permits
- Jun 2020 to Jan 2026
- Last 24 months
- 10 permits filed
28 permits since 2000: 22 completed, 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2025 | In progress issued Dec 2025 | 3318 Steiner St | revision to permit 202310047992. relocation of main meter to same wall but closer to main door. relocate sub-panels to wall on kitchen area.Details
revision to permit 202310047992. relocation of main meter to same wall but closer to main door. relocate sub-panels to wall on kitchen area. | $2,500 |
| Nov 7, 2025 | Completed final sign-off Jan 2026 | 44 Cervantes Bl | unit#104: remodel kitchen in kind. new cabinets, new fridge, new stove, new electrical circuits, new outlets and switches. approx. 96 sq ft.Details
unit#104: remodel kitchen in kind. new cabinets, new fridge, new stove, new electrical circuits, new outlets and switches. approx. 96 sq ft. | $25,000 |
| Jul 1, 2025 | Completed final sign-off Sep 2025 | 3665 Fillmore St | unit #12: remodeling of kitchen and bathroom in kind. no moving walls. fixtures to remain in the same location. kitchen approx. 99 sq ft. bathroom approx. 40 sq ft.Details
unit #12: remodeling of kitchen and bathroom in kind. no moving walls. fixtures to remain in the same location. kitchen approx. 99 sq ft. bathroom approx. 40 sq ft. | $30,000 |
| Mar 5, 2025 | Completed final sign-off Jun 2025 | 44 Cervantes Bl | unit 206: demolition of kitchen and bathroom. redo new kitchen and bath in kind. new appliances, new paintDetails
unit 206: demolition of kitchen and bathroom. redo new kitchen and bath in kind. new appliances, new paint | $25,000 |
| Oct 10, 2023 | Completed final sign-off Sep 2024 | 600 Buchanan St | run electrical for bath, powder room and kitchen. insulate bath, powder room and kitchen. in kitchen: sheetrock, new cabinets, appliances and countertop. in bath and powder: toilets and sinks/vanity. install insul. and sheetrock on 1 bedroom wall and ceiling. 5/8" type x everwhere. all work in kind.Details
run electrical for bath, powder room and kitchen. insulate bath, powder room and kitchen. in kitchen: sheetrock, new cabinets, appliances and countertop. in bath and powder: toilets and sinks/vanity. install insul. and sheetrock on 1 bedroom wall and ceiling. 5/8" type x everwhere. all work in kind. | $28,000 |
| Dec 20, 2022 | Completed final sign-off Oct 2023 | 121 San Benito Wy | remodel (e) kitchen, new applicances,counter w/o new cabinets and lighting.remodel (e) main bath and access.remodel (e) jack and jill bathroom with new access from hall and (n) lighting. remodel (e) primary bath and primary closet and (n) lighting.Details
remodel (e) kitchen, new applicances,counter w/o new cabinets and lighting.remodel (e) main bath and access.remodel (e) jack and jill bathroom with new access from hall and (n) lighting. remodel (e) primary bath and primary closet and (n) lighting. | $45,000 |
| Sep 23, 2022 | Completed final sign-off Jan 2023 | 44 Cervantes Bl | one kitchen and one bathroom: unit #203: demo of kitchen cabinets, counters. demo of toilet, vanity, wall tile and floor tile in bathroom. replace with new fixtures, upgrade electrical subpanel.Details
one kitchen and one bathroom: unit #203: demo of kitchen cabinets, counters. demo of toilet, vanity, wall tile and floor tile in bathroom. replace with new fixtures, upgrade electrical subpanel. | $25,000 |
| Jul 15, 2022 | Completed final sign-off Sep 2022 | 3665 Fillmore St | unit 16: demoliton of extg kitchen and bathroom. run electrical for kitchen and bathroom. install new cabinets. new tub and toilet. layout will stay the same. no exterior workDetails
unit 16: demoliton of extg kitchen and bathroom. run electrical for kitchen and bathroom. install new cabinets. new tub and toilet. layout will stay the same. no exterior work | $15,000 |
| Apr 1, 2021 | Never finaled issued Apr 2021, no final | 44 Cervantes Bl | emolition of tub. shower wall tile. install new shower valve, new tub, surrface tile new sink and toilet. demolition of kitchen cabinets, upgrade electrical for kitchen. install new cabinets counters and appliances. upgrade electrical subpanel.Details
emolition of tub. shower wall tile. install new shower valve, new tub, surrface tile new sink and toilet. demolition of kitchen cabinets, upgrade electrical for kitchen. install new cabinets counters and appliances. upgrade electrical subpanel. | $22,000 |
| Apr 1, 2021 | Completed final sign-off Jun 2021 | 3665 Fillmore St | demolition of tub and shower tile install new shower valve, new tub, sheetrock, new tile demolition of existing kitchen cabinets, install upgrade electrical for kitchen. install new sheetrock new cabinets and countertops. upgrade electrical subpanel.Details
demolition of tub and shower tile install new shower valve, new tub, sheetrock, new tile demolition of existing kitchen cabinets, install upgrade electrical for kitchen. install new sheetrock new cabinets and countertops. upgrade electrical subpanel. | $22,000 |
| Jun 11, 2020 | Completed final sign-off Oct 2020 | 1865 Clay St | unit#6: bathroom remodel: replace bathtub with shower pan, replace shower valve, install new granite on shower walls, replace vanity. replace kitchen countertops, relocate electrical sub panel from kitchen to hallway. kitchen and bathroom remodel in-kind.Details
unit#6: bathroom remodel: replace bathtub with shower pan, replace shower valve, install new granite on shower walls, replace vanity. replace kitchen countertops, relocate electrical sub panel from kitchen to hallway. kitchen and bathroom remodel in-kind. | $22,000 |